Bolthole Index

Daniels County, Montana

Zoning, building permits and septic rules in Scobey, Montana

Scobey, Montana runs its own zoning: a city zoning permit, approved by the Zoning Commission/Planning Board, is required before new construction, additions, decks, fences and sheds1. Septic permits inside city limits come from the Daniels County sanitarian, not the city2. We could not confirm whether Scobey issues its own building permits, so ask City Hall before you pour a foundation.

At a glance

Zoning
Yes, the City of Scobey administers its own zoning ordinance3
Zoning permit
Required, and board-approved before any project starts1
Building permit
Not confirmed for city limits; ask City Hall4
Septic
Written permit from the Daniels County sanitarian2
R-1 minimum lot
7,000 sq ft, 50 ft wide5
R-1 setbacks
Front 15 ft, side 5 ft, rear 10 ft6
Mobile homes
Owner-occupied, by conditional use permit in R-37

Who to call

Zoning

City of Scobey City Hall (Zoning Commission/Planning Board)

Zoning permit applications for land inside Scobey city limits

406-487-5581

708 1st Avenue, West Scobey, MT 59263

Septic permits

Daniels County Environmental Health/Sanitarian

Septic and drainfield permits, including inside Scobey city limits

(406) 487-5560

PO Box 836, Scobey, MT 59263

Contact details are copied from each office’s official page and were checked against it on October 24, 2026.

Off-grid gear

Going off-grid in Scobey means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does Scobey, Montana have zoning?

Yes. The City of Scobey administers its own zoning ordinance for land inside city limits3. The ordinance publishes a set of residential and other zoning districts, each with its own permitted uses and development standards8. The Zoning Commission/Planning Board also answers land-use questions and handles code enforcement9.

The city's zoning applies only inside Scobey. For land outside city limits, Daniels County has its own planning board and zoning resolution; see the Daniels County page for those rules.

What are the lot-size and setback rules in Scobey?

Rules depend on the district. In the R-1 single-family district, the minimum lot area is 7,000 square feet and the minimum lot width is 50 feet, with exceptions for nonconforming lots5. R-1 setbacks are 15 feet in front, 5 feet on the side and 10 feet in the rear; a side corner setback is 15 feet and an attached garage facing the front or side corner needs 20 feet6.

We could not confirm lot-coverage, building-height or minimum-dwelling-size limits, or the standards for other districts. Ask City Hall which district your lot is in before you plan a house or garage.

Do you need a building permit in Scobey, and who issues it?

A zoning permit is required in Scobey for new construction, additions, decks, fences, sheds and accessory structures, and no project may start without a board-approved permit9. Applications are due the Friday before the Zoning Commission/Planning Board meets, and the board meets on the second Wednesday of each month when business requires1.

Whether Scobey also issues its own building permits and inspections is unconfirmed. Under Montana law, state building permits cover certain non-exempt buildings outside any certified local program, and residential buildings with fewer than five dwelling units are exempt from the state permit4. Call City Hall at 406-487-5581 to confirm which office handles building permits for your project9.

How do septic permits work inside Scobey?

Inside Scobey city limits, no cesspool, septic tank or private sewer may be built or used without the consent of the county sanitarian and a written permit from that office2. The permit must be obtained before construction begins10. The Daniels County Environmental Health/Sanitarian office is in Scobey at (406) 487-556011.

The city can also require a house on a lot along a city sewer line to connect, but only after the city council orders it and gives notice12. We could not confirm well rules or whether off-grid systems are allowed inside city limits, so ask the sanitarian.

Can you live in an RV, mobile home or tiny home in Scobey?

Mobile homes that are owner-occupied are allowed in the R-3 residential district by conditional use permit; other districts were not confirmed7. Montana law also bars municipal zoning from treating manufactured or factory-built housing differently from other homes13.

We could not confirm Scobey's rules for long-term RV living, temporary camping or tiny homes. Ask the Zoning Commission/Planning Board through City Hall before you park or place anything on a lot9.

Building a home in Scobey: the steps, in order

  1. Call City Hall at 406-487-5581 and confirm your lot's zoning district and whether a building permit is also needed9.
  2. Submit a zoning permit application by the Friday before the second-Wednesday board meeting1.
  3. Wait for board approval; no project may start without it9.
  4. Get the county sanitarian's written septic permit before construction10.
  5. If your lot sits on a sewer line, expect a city connection order12.

What stays with Daniels County, and what to check before you buy

Septic permits stay with the county sanitarian, and land outside city limits falls under Daniels County's planning board and zoning resolution rather than Scobey's214. A driveway onto a state highway needs an approach permit or right-of-way agreement from the Montana Department of Transportation15.

Daniels County's effective property tax rate is 0.9%16, and its Bolthole Index score is 44.4 out of 10017. The county averages 14.5 inches of precipitation a year18.

Watch-outs

  • Scobey's zoning permit needs board approval before work starts, and the board meets only when business requires it, so allow time1.
  • We could not confirm whether Scobey issues building permits, inspections or certificates of occupancy; ask City Hall at 406-487-55819.
  • Septic permits inside Scobey come from the county sanitarian, not City Hall2.

Sources

  1. City of Scobey - Zoning (Scobey), quoted and re-checked
  2. City of Scobey Municipal Code (2015 codification, PDF) (Scobey), quoted and re-checked
  3. City of Scobey - Zoning (Scobey), quoted and re-checked
  4. Building Permits, quoted and re-checked
  5. City of Scobey Municipal Code (2015 codification, PDF) (Scobey), quoted and re-checked
  6. City of Scobey Municipal Code (2015 codification, PDF) (Scobey), quoted and re-checked
  7. City of Scobey Municipal Code (2015 codification, PDF) (Scobey), quoted and re-checked
  8. City of Scobey Municipal Code (2015 codification, PDF) (Scobey), quoted and re-checked
  9. City of Scobey City Hall (Zoning Commission/Planning Board) (cityofscobey.com)
  10. City of Scobey Municipal Code (2015 codification, PDF) (Scobey), quoted and re-checked
  11. Daniels County Environmental Health/Sanitarian (dphhs.mt.gov)
  12. City of Scobey Municipal Code (2015 codification, PDF) (Scobey), quoted and re-checked
  13. 76-2-302. Zoning districts, MCA (Montana statewide rule), quoted and re-checked
  14. Planning — Daniels County, Montana, quoted and re-checked
  15. Approach Manual for Landowners and Developers (Montana statewide rule), quoted and re-checked
  16. Effective property tax rate: Bolthole Index county data
  17. Bolthole Index score (off-grid/homestead land score): Bolthole Index county data
  18. Annual precipitation: Bolthole Index county data

Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Scobey

Scobey’s own rules

  • Local zoningPresent (with conditions)

    Land inside Scobey city limits. Scobey city administers its own zoning ordinance (Title 17 zoning, Chapters 17.01 to 17.37).

    • Zoning permit approval requires Zoning Commission/Planning Board action; the city page says no project may start without a board-approved permit.
    • Source for chapter list is the 2015 codification on the city site; current eCode360 text (through ordinance 24-3) was not opened at chapter level.
    “the zoning commission/planning board provides the citizens of the city of scobey with information regarding zoning regulations and ordinances.”
  • Zoning districtsPublished (with conditions)

    Zoning districts that apply inside Scobey city limits

    • District list is from the 2015 codification; eCode360 zoning map and district chapters were not opened.
    “chapter 17.06 r-3 residential sections: 17.06.010 intent. 17.06.020 permitted uses. 17.06.030 uses which may be permitted by conditional use permit. 17.06.040 property development standards.”
  • Minimum lot sizeSpecified

    R-1 single-family residential district (Chapter 17.04) inside Scobey city limits

    • Minimum lot area 7,000 sq ft and minimum lot width 50 ft as listed in the 2015 codification.
    • Layout of the PDF places this block before the R-2 chapter; confirm against eCode360 Chapter 17.04.
    • Nonconforming lots and sublots are excepted under 17.04 (exception list).

    minimum lot area: >= 7000 sq ft (nonconforming lots excepted) · minimum lot width: >= 50 ft

    “17.04.040 property development standards. a. minimum lot area (sq ft): 7,000. b. minimum lot width (ft): 50.”
  • SetbacksSpecified

    R-1 single-family residential district (Chapter 17.04) inside Scobey city limits

    • Setbacks: front yard 15 ft, side yard 5 ft, rear yard 10 ft, side corner 15 ft, attached garage (front/side corner) 20 ft; accessory structures per 17.20.020 (not opened).
    • Layout of the PDF places this block before the R-2 chapter; confirm against eCode360 Chapter 17.04.

    front yard setback: 15 ft · side yard setback: 5 ft · rear yard setback: 10 ft · side corner setback: 15 ft · attached garage setback (front/side corner): 20 ft

    “c. minimum setbacks (ft): front yard 15 side yard 5 rear yard 10 side corner 15 attached garage (front/side corner) 20”
  • Manufactured homesLimited

    Owner-occupied mobile homes in the R-3 residential district (Chapter 17.06) inside Scobey city limits, by conditional use permit

    • Allowed only by conditional use permit in R-3 as listed in the 2015 codification; other districts not verified.
    • Layout of the 2015 PDF is ambiguous at chapter boundaries; confirm against eCode360 Chapter 17.06.
    “g. group home, eight or fewer. h. mobile home, owner occupied. i. police and fire stations. j. residential care home or facility.”
  • Mandatory utility hookupConditional

    Houses on a lot along a city sewer line inside Scobey city limits

    • Connection is required only after the city council orders it and notice is given.
    • Water connection requirement not located; the 13.08 section number and any distance rule were not captured.
    “after being ordered so to do by the city council and notice thereof given, to make connections with the sewer nearest to such house”
  • Permit processPartial

    Zoning permit process inside Scobey city limits

    • Applications are made at City Hall or downloaded; applications are due the Friday before the second-Wednesday Zoning Commission/Planning Board meeting at 3:00 pm.
    “zoning permit application cannot be approved without board approval. no project shall be started without a board approved permit.”

Rules another office applies inside Scobey

Scobey does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicCounty (with conditions)

    Cesspools, septic tanks and private sewers inside Scobey city limits: the county sanitarian gives consent and the permit. This is the county sanitarian's rule as applied inside Scobey city, not a countywide rule of the city.

    • Source is the city's 2015 codification of Title 13.16; confirm it is still current on eCode360.
    “no cesspool, septic tank or private sewer shall be constructed or used without the consent of the county sanitarian, and a written permit therefor obtained from him.”
  • Septic permitRequired

    New cesspool, septic tank or private sewer inside Scobey city limits, permitted by the county sanitarian

    • Written permit from the county sanitarian required before construction or use.
    • Plans and specifications must be submitted; detail not verified.
    “all permits required under the provisions of this section must be obtained before the work of construction is commenced.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Scobey or Daniels County directly.

  • Owner-builder exemption — Owner-builder exemption inside Scobey city limits
  • Building code adopted — Building codes adopted by Scobey city
  • Inspections — Building inspections inside Scobey city limits
  • Certificate of occupancy — Certificates of occupancy inside Scobey city limits
  • Minimum dwelling size — Minimum dwelling size inside Scobey city limits
15 more unanswered
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Scobey publishes no rule on the point, not that none exists. Daniels County’s page lists the county offices to call.

← All of Daniels County: county rules, score and offices