Madison County, Montana
Town of Twin Bridges is a town in Madison County, Montana. 5 rules below are quoted from official sources and independently re-checked, most recently on October 18, 2026. Rules for unincorporated land are on the Madison County page.
All new structures and additions to existing structures inside Twin Bridges town limits.
“All new structures and additions to an existing structure require a building compliance permit. The Town Council will review the application for the permit at their regular scheduled council meeting. Permits shall be acquired prior to construction.”
New construction within the Flood Zone inside Twin Bridges town limits.
“Any new construction within in the Flood Zone will require a flood permit. Flood permits will be administered through Great West Engineering on behalf of the Town of Twin Bridges.”
Town building-compliance permits for new structures and additions inside Twin Bridges town limits.
building compliance permit application fee: 25 USD (Non-refundable; applied toward the permit cost if issued.) · building compliance permit rate: per 5 USD per 100 square feet (Minimum charge is $25.) · building compliance permit minimum charge: 25 USD
“There is a twenty-five dollar ($25.00) fee for the application that is non-refundable and will be applied towards the cost of the permit if issued. The rate for the permit is five dollars ($5.00) for every one hundred (100) square feet, with a minimum charge of twenty-five dolloars ($25.00). Fees for the floodplain permit will vary depending on the permit.”
Residential and commercial building-compliance permits inside Twin Bridges town limits.
“Take a moment to read all required information provided. Then print and fill out the building permit application form and return the applicaton to Town Hall.”
Town of Twin Bridges does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New or expanded groundwater use, including a well serving land inside Twin Bridges town limits.
“A Beneficial Water Use Permit is required for all new or expanded uses of surface water and groundwater unless the use falls under an exception to permitting requirements.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Twin Bridges or Madison County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Twin Bridges publishes no rule on the point, not that none exists. Madison County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Twin Bridges means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.