McIntosh County, North Dakota requires a building permit and has county zoning.12 Onsite wastewater work also requires a local public-health permit before it begins.3 Ask Planning and Zoning about the parcel's jurisdiction and proposed use because RV occupancy, tiny-home and owner-builder construction rules could not be confirmed.
At a glance
- Building permit
- Required through county Planning and Zoning1
- Zoning
- County zoning applies2
- Septic permit
- Local public-health permit required before work3
- RV living
- Not confirmed; ask county Planning and Zoning2
- Tiny home
- No specific occupancy rule confirmed; ask county Planning and Zoning2
- Owner-builder
- No permit exemption confirmed; a discretionary tax exemption is separate4
- Private well
- State appropriation permit applies above the annual withdrawal threshold5
Who to call
Zoning
McIntosh County Planning and Zoning
Building permit, conditional-use, zoning-variance, zoning-amendment and utility-permit applications
112 1st Street NE, Ashley ND 58413
Septic permits
Central Valley Health District Environmental Health
Onsite sewage treatment system permits and inspections of existing septic systems
122 2nd St NW Jamestown, ND 58401
Contact details are copied from each office’s official page and were checked against it on October 5, 2026.
Off-grid gear
Going off-grid in McIntosh County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in McIntosh County, North Dakota?
Yes. McIntosh County administers a Building Permit Application under its adopted zoning ordinance.1 The county publishes separate applications for building permits, conditional uses, zoning variances, zoning amendments and utility permits, but the published page does not give a complete submission, review or fee procedure.6 Permit and plan-review fees are set by the enforcing governing authority rather than by one statewide fee schedule.7
The updated North Dakota State Building Code took effect in 2026, but local code enforcement still depends on a city, county or township electing to adopt and enforce the state framework.89 Ask McIntosh County Planning and Zoning which code provisions, inspections and fees apply to the specific parcel and project; a general county inspection requirement could not be confirmed. Agricultural buildings used for agricultural purposes are exempt from the state building-code chapter unless they are places of human habitation or are used by the public, but that exemption does not erase other applicable county requirements.10
Who handles McIntosh County building permits and zoning?
McIntosh County Planning and Zoning is the first stop for building and land-use questions.12 The county publishes building-permit, conditional-use, zoning-variance, zoning-amendment and utility-permit applications.6 The office is at the McIntosh County Courthouse, 112 1st Street NE in Ashley, and the published county number is (701) 288-5140.11
Start by giving Planning and Zoning the parcel location, proposed use, structure type and whether the land lies inside a city or township jurisdiction. North Dakota allows a county to enforce the state building code only where that code is not administered by a city or township, so jurisdiction matters.12 Ask the office to identify the zoning district, required application, current fee, site-plan materials and any review or hearing needed because the county page does not publish the complete procedure.6
Does McIntosh County have zoning?
Yes. McIntosh County has an adopted zoning ordinance and a Planning and Zoning Commission that handles conditional-use permits, variances and amendments.2 North Dakota law allows county commissioners to regulate the location and use of buildings and structures and the use or occupancy of land, subject to the state building-code chapter.13
County zoning means a rural parcel should not be treated as unrestricted merely because it is outside a city.2 Confirm the parcel's district and permitted use before relying on a listing description or planning a dwelling, accessory structure, business, RV setup or utility work. In unincorporated McIntosh County, conditional uses go through an application and Planning and Zoning Commission hearing before approval by the Board of County Commissioners.14 No countywide minimum dwelling floor area, tiny-home occupancy rule or general certificate-of-occupancy requirement could be confirmed; ask McIntosh County Planning and Zoning for a parcel-specific written answer.
How do septic permits work in McIntosh County?
A permit from the applicable local public-health unit is required before onsite wastewater work begins in McIntosh County, and the installer must also hold a North Dakota Department of Environmental Quality license and follow local codes.3 The permitting authority or its representative must inspect the installation within one business day after receiving an inspection request, and a permit is valid for no more than 12 months.15 Ask the McIntosh District Health Unit to confirm the application, fee, site evaluation and inspection-request procedure for the parcel.16
About 57.7% of mapped county soils are rated without severe limitations for a conventional septic drain field, so suitability is far from uniform.17 Household wastewater must pass through a septic tank or higher treatment before soil discharge; alternative collection and disposal methods require review when underground dispersal is not feasible.18 New systems generally need at least one acre, although a variance may be available.18
Can you live in an RV or tiny home in McIntosh County?
McIntosh County has zoning, but no specific county rule confirming full-time RV living or tiny-home occupancy could be established.2 The North Dakota state-park camping limit does not answer whether an owner may occupy an RV on private land because that limit applies only to state-park campsites and cabins.19
Before buying or moving a unit onto rural land, ask McIntosh County Planning and Zoning whether the proposed use is allowed in the parcel's district, whether a conditional-use or building permit is needed, and what setbacks or utility standards apply. The county publishes building, conditional-use, variance and utility-permit applications.11 A new manufactured home used as a residence must be installed by a state-licensed installer and inspected by a state-licensed inspector.20 Factory-built modular structures can also be subject to state manufacturing-stage inspection rules, so do not assume that a tiny or factory-built dwelling avoids review.21
Building a home in McIntosh County: what are the steps?
- Confirm jurisdiction and zoning. Ask McIntosh County Planning and Zoning to identify the parcel's district and whether a city or township administers building rules at that location.212
- Describe the complete project. Tell the office about the dwelling, accessory buildings, temporary RV use and planned utilities, then request the correct building, conditional-use, variance or utility form.6
- Confirm code, plans, fees and inspections. McIntosh County requires a building permit, but the county page does not state the complete submission, review or fee procedure.16
- Resolve wastewater before construction. Secure the local public-health septic permit before onsite-system work begins, use a state-licensed installer and arrange the required installation inspection.315
- Plan water. A state water-appropriation permit is required when annual withdrawal exceeds 12.5 acre-feet; qualifying lower-volume domestic and livestock works must still be reported.5
- Keep approvals together. Retain the approved site plan, permit documents and any inspection records supplied by the responsible offices.1
What should you check before buying land in McIntosh County?
Begin with zoning, legal access, wastewater and water rather than assuming a rural tract is ready to build. McIntosh County has county zoning and requires a building permit.21 Ask Planning and Zoning about the parcel's district, permitted dwelling type, setbacks, utility work, RV use and any conditional-use or variance process.11
Evaluate the proposed septic area separately from the house site because only about 57.7% of mapped county soils avoid a severe conventional-drain-field limitation.17 New onsite wastewater systems generally need at least one acre, although a variance may be available.18 Confirm private-well reporting or appropriation requirements with the state before drilling; the appropriation threshold is 12.5 acre-feet per year.5 For budgeting context, the typical home value is about $80,300, the effective property-tax rate is about 1.1%, and the median annual property-tax bill is about $867.222324 Verify parcel taxes, easements, road access and flood status during due diligence.
Watch-outs
- A building permit does not by itself settle zoning approval; McIntosh County also publishes conditional-use, variance, amendment and utility-permit applications.6
- North Dakota's owner-builder property-tax exemption is separate from construction approval, and no McIntosh County owner-builder exemption from permit or code requirements could be confirmed.4
- Do not use the North Dakota state-park camping limit as a private-land RV rule; it governs state-park campsites and cabins.19
- Confirm the filing procedure with the McIntosh District Health Unit before septic work begins; the permitting authority must inspect the installation after receiving an inspection request.1615
Sources
- McIntosh County Zoning Office (2026 county census)
- McIntosh County Zoning Office (2026 county census)
- Septic Systems, quoted and re-checked
- Property Tax Exemption for Builders of Certain New Single Family Residential Properties (North Dakota statewide rule), quoted and re-checked
- Water Appropriation Permits (North Dakota statewide rule), quoted and re-checked
- Zoning - McIntosh County, North Dakota, quoted and re-checked
- 2026 North Dakota State Building Code Book (North Dakota statewide rule), quoted and re-checked
- North Dakota Century Code Chapter 54-21.3, State Building Code (North Dakota statewide rule), quoted and re-checked
- Building Codes, quoted and re-checked
- North Dakota Century Code Chapter 54-21.3, State Building Code (North Dakota statewide rule), quoted and re-checked
- McIntosh County Planning and Zoning (mcintoshnd.com)
- Building Codes (North Dakota statewide rule), quoted and re-checked
- North Dakota Century Code, Chapter 11-33, County Zoning (North Dakota statewide rule), quoted and re-checked
- Zoning - McIntosh County, North Dakota, quoted and re-checked
- North Dakota Administrative Code, Chapter 33.1-21-01: Onsite Wastewater Treatment System Installers Licensing Systems (North Dakota statewide rule), quoted and re-checked
- North Dakota DEQ - On-Site Wastewater Treatment Systems (2026 county census)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- North Dakota Administrative Code, Section 33.1-21-01-07: General requirements (North Dakota statewide rule), quoted and re-checked
- Parks and Recreation FAQ (North Dakota statewide rule), quoted and re-checked
- Manufactured Home Installation Program (North Dakota statewide rule), quoted and re-checked
- 2026 North Dakota State Building Code Book (North Dakota statewide rule), quoted and re-checked
- Typical home value (Zillow): Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written October 5, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.