Bolthole Index

Cass County, Nebraska

Zoning, building permits and septic rules in Village of Cedar Creek, Nebraska

Village of Cedar Creek is a village in Cass County, Nebraska. Village of Cedar Creek adopts its own zoning, so inside its limits Village of Cedar Creek’s rules apply, not the county’s. 5 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Cass County page.

Answers from the rulebook for Village of Cedar Creek

Village of Cedar Creek’s own rules

  • Building permitRequired

    Any person who wants to erect, construct, repair, enlarge, demolish or relocate a building or dwelling inside Cedar Creek village

    • Application must be filed in writing with the village clerk/treasurer on the village form.
    • Permit is issued only after board of trustees review and payment of the permit fee.
    • Permit is void if work has not begun within six months of issuance, or if construction is discontinued for six months; a new permit is then required.
    • Where permit application procedures conflict with a building code adopted by reference, the chapter's procedures govern (§150.01).

    permit validity: work must begin within: 6 months (or construction discontinued for a period of six months, after which the permit is void)

    “any person desiring to commence or proceed to erect, construct, repair, enlarge, demolish or relocate any building or dwelling, or cause the same to be done, shall file with the village clerk/treasurer an application for a building permit.”
  • Local zoningPresent (with conditions)

    Land inside Cedar Creek village limits: the village code contains a zoning chapter (Chapter 152: Zoning) under Title XV: Land Usage

    • Only the table of contents of Chapter 152 was captured; the zoning district text itself was not opened.
    • The code overview states it is current through Ordinance No. 2007-02, passed 7-7-2020, and the publisher disclaims that the posted code may not reflect the most current legislation.
    “chapter 151: subdivisions chapter 152: zoning chapter 153: floodplain management chapter 154: manufactured homes”
  • Subdividing landRegulated (with conditions)

    Division of land inside Cedar Creek village limits: the village code contains a subdivisions chapter (Chapter 151)

    • Only the table of contents of Chapter 151 was captured; the subdivision standards and approval steps were not opened.
    “chapter 151: subdivisions chapter 152: zoning chapter 153: floodplain management chapter 154: manufactured homes”
  • Permit feesVariable (with conditions)

    Building permits for buildings or dwellings inside Cedar Creek village

    • Fee is set by the board of trustees by resolution; the code does not print a fee amount in §150.01.
    • The current fee resolution was not located on an official page.
    “a permit upon payment of a permit fee set by the board by resolution”
  • Permit processPartial

    Building permit application process inside Cedar Creek village

    • Application is written, on a village-clerk form, and must include the legal description, nature of use or occupancy, and related details.
    • Board of trustees checks applications and authorizes the clerk to issue the permit upon payment of the fee.
    • Permit void if work does not begin within six months or is discontinued for six months.
    “every such application shall set forth the legal description of the land upon which the construction or relocation is to take place, the nature of the use or occupancy”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of Cedar Creek or Cass County directly.

  • Owner-builder exemption — Owner-builders of single-family homes inside Cedar Creek village
  • Building code adopted — New construction inside Cedar Creek village
  • Inspections — New construction inside Cedar Creek village
  • Certificate of occupancy — Occupancy of new dwellings inside Cedar Creek village
  • Zoning districts — Zoning districts of Cedar Creek village
20 more unanswered
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of Cedar Creek publishes no rule on the point, not that none exists. Cass County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Village of Cedar Creek means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Cass County: county rules, score and offices