Merrick County, Nebraska
Central City is a city in Merrick County, Nebraska. 6 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Merrick County page.
Construction of residential buildings inside Central City city limits
“chapter four, foundations, of the latest edition of that certain building code known as the international residential code for one- and two-family dwellings”
Zoning districts mapped inside Central City city limits along watercourses with an established floodway
“along watercourses where a floodway has been established, the mapped floodplain areas are hereby divided into the two following districts: a floodway overlay district (fw) and a flood fringe overlay district (ff), as identified in the flood insurance study and accompanying map(s).”
Occupancy of a mobile home located in a mobile home park inside Central City city limits (Chapter 8, Article I, mobile home parks)
“it shall be unlawful and a violation of this article for any person to occupy for residential purposes or for the purpose of a home occupation any mobile home which is not so located, maintained or equipped as to fully comply with the provisions and requirements of this article.”
Floodplain development or substantial improvement inside Central City city limits in special flood hazard areas
“(a) general. no person, firm or corporation shall initiate any floodplain development or substantial improvement or cause the same to be done without first obtaining a separate permit for development as defined herein.”
“any new structure commencing construction on or after april 1, 2021 must be built to a minimum elevation at or exceeding the base flood elevation for the walking surface of the lowest floor, as determined by the zoning administrator or flood plain administrator.”
Building permits for newly constructed structures inside Central City city limits
building permit fee: 0.1 % of anticipated final taxable valuation (for improvements under Article III, 0.1% of the full commercial cost of the improvements) · building permit fee cap: <= 2000 USD per permit
“the building permit fee shall be 0.1% of the anticipated final taxable valuation of any newly constructed structure. any improvements to a structure or improvements under article iii of this chapter shall have a fee of 0.1% of the full commercial cost of such improvements. building permit fees shall be capped at $2,000 per permit.”
We looked and could not find an official answer yet. Silence is not permission; ask Central City or Merrick County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Central City publishes no rule on the point, not that none exists. Merrick County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Central City means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.