Building in the Borough of Montvale, Bergen County, New Jersey takes a construction permit from the borough's construction official under the state Uniform Construction Code1. Montvale adopts and enforces its own zoning ordinance2. Septic systems and water supply are certified by the borough's Board of Health, not the county3.
At a glance
- Building permit
- Required; issued by the borough construction official1
- Zoning
- Borough zoning ordinance, Chapter 400 of the borough code2
- Septic
- Borough Board of Health certifies sewage facilities3
- New R-5 construction fee
- $0.060 per cubic foot, $250 minimum4
- Certificate of occupancy
- Needs written Board of Health sewage approval first5
Who to call
Building permits
Montvale Building and Construction (Construction Official)
Building permits, subcode permits and inspections inside Montvale
12 DePiero Drive, Montvale, NJ 07645
Zoning
Montvale Zoning and Land Use (Zoning Officer)
Zoning permits, the zoning map and the limiting schedule
12 DePiero Drive, Montvale, NJ 07645
Septic permits
Borough of Montvale (Board of Health)
Main borough line; ask for the Board of Health Sanitary Inspector about septic and water-supply certification
12 DePiero Drive, Montvale, NJ 07645
Contact details are copied from each office’s official page and were checked against it on October 13, 2026.
Off-grid gear
Going off-grid in Borough of Montvale means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Montvale, NJ have zoning, and what does it mean for RVs, tiny homes and lot size?
Yes. The Borough of Montvale zones its own land: structures and improvements must conform to the restrictions in the Limiting Schedule of the borough's zoning chapter2. The borough's zoning page says Chapter 400 of the Borough Code contains its zoning regulations6. Bergen County does not zone for its municipalities7.
Lot size, setbacks, home size and height are set district by district, so the answer for a given parcel depends on its zone in the limiting schedule8. We could not confirm borough rules on RV occupancy, tiny homes, accessory dwelling units or short-term rentals; ask the Montvale Zoning Officer before you plan any of them.
Do you need a building permit in Montvale, and who issues it?
Yes. New Jersey's Uniform Construction Code requires a permit for construction, enlargement, alteration, repair and demolition1. In Bergen County those permits are obtained through the municipal construction official, so inside Montvale the borough's Building and Construction office issues them9.
New Jersey's code applies statewide, and the borough's fees are due before a permit is issued4. For new Residential Use Group R-5 construction the building subcode fee is $0.060 per cubic foot, with a $250 minimum4. The borough's forms page lists a zoning permit application alongside the construction permit application.
How do septic permits work inside Montvale?
Montvale's Board of Health enforces the borough's sewage and water-supply chapter3. A written application with plans, sewage-facility locations and potable-water sources must be filed for a realty improvement10.
The order matters: the Board of Health must certify the proposed water supply and sewage facilities before a construction permit issues and before construction begins11. At the end, no certificate of occupancy issues for a new dwelling until the Sanitary Inspector approves the sewage disposal system in writing5.
Bergen County Health Services handles septic plan review only for municipalities that contract with it, so confirm with Montvale which office reviews your plans12.
Building a home in Montvale: the steps, in order
- Ask the Montvale Zoning Officer which zoning district the parcel is in and what the limiting schedule allows2.
- File the written sewage and water-supply certification with the Board of Health10.
- Get Board of Health certification before applying for or starting construction11.
- Pay fees and obtain the construction permit from the construction official4.
- Pass the required inspections at each construction stage13.
- Obtain written Board of Health sewage approval, then the certificate of occupancy5.
What stays with Bergen County and the state in Montvale?
The county's role in Montvale is narrow. A subdivision must be submitted to the County Planning Board for review, though approval is required only when it affects a county road, drainage facility or county-owned property14. A driveway onto a State highway needs a state access permit15.
For land outside the borough, see the Bergen County page. Bergen County's median property tax bill is $10,001 a year, an effective rate of 1.7%1617.
Watch-outs
- Montvale zoning is set by its own ordinance and limiting schedule, and we could not confirm rules on owner-builders, accessory dwelling units, RV or tiny-home occupancy; ask the Zoning Officer before you buy2.
- The Board of Health must certify sewage and water supply before construction starts, and we could not confirm a separate well-permit or mandatory public-sewer rule; ask the Board of Health11.
- A driveway onto a State highway needs a state permit, which is separate from any borough approval15.
Sources
- N.J.A.C. 5:23-2.14, Construction permits—when required (New Jersey statewide rule), quoted and re-checked
- Chapter 400 Zoning, Article I General Provisions (Borough of Montvale), quoted and re-checked
- Chapter 461 Sewage Disposal and Water Supply (Borough of Montvale), quoted and re-checked
- Chapter 170, Article III Permits and Fees (Borough of Montvale), quoted and re-checked
- Chapter 461 Sewage Disposal and Water Supply (Borough of Montvale), quoted and re-checked
- Montvale Zoning and Land Use (Zoning Officer) (montvalenj.gov)
- Bergen County Standards for Sustainable Land Development—Site Plans, quoted and re-checked
- P.L. 2013, c.106 (Municipal Land Use Law amendments) (New Jersey statewide rule), quoted and re-checked
- The New Jersey State Uniform Construction Code, quoted and re-checked
- Chapter 461 Sewage Disposal and Water Supply (Borough of Montvale), quoted and re-checked
- Chapter 170, Article III Permits and Fees (Borough of Montvale), quoted and re-checked
- bergencountynj.gov, quoted and re-checked
- New Jersey Department of Community Affairs, New Home Warranty—Consumer Information (New Jersey statewide rule), quoted and re-checked
- Bergen County Standards for Sustainable Land Development—Subdivisions, quoted and re-checked
- Major Access Permits (New Jersey statewide rule), quoted and re-checked
- Median property tax bill: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
Written October 13, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.