The Village of Ridgewood, New Jersey requires a building permit for construction inside village limits, issued by its own Department of Building and Inspections12. Ridgewood adopts and enforces its own zoning, not Bergen County34. Septic approval comes from a board of health, which we could not pin down for Ridgewood5.
At a glance
- Building permit
- Required, issued by the Village Building Department21
- Zoning
- Village zoning by zone district; Bergen County does not zone34
- Zoning permit decision
- 10 business days after a complete application6
- Septic
- Board of health certifies the plan before a building permit; which office serves Ridgewood is unconfirmed5
- Owner-builder
- Exempt from builder registration, not from permits; an affidavit is needed for the certificate of occupancy78
- Floodplain
- Flood hazard area development needs Floodplain Administrator approval9
Who to call
Building permits
Village of Ridgewood Building Department
Building permits under the Uniform Construction Code and local zoning review inside Ridgewood
131 N Maple Avenue, Ridgewood, NJ 07450
Septic permits
Bergen County Department of Health Services
Septic plan review for municipalities that contract with the county; confirm whether Ridgewood does
One Bergen County Plaza, 4th Floor, Hackensack, NJ 07601-7076
Contact details are copied from each office’s official page and were checked against it on October 13, 2026.
Off-grid gear
Going off-grid in Village of Ridgewood means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Ridgewood, NJ?
Yes. Building permits are required for construction inside the Village of Ridgewood and are administered under the New Jersey Uniform Construction Code2. A statewide rule says a permit is needed for new construction and for work on existing buildings, with ordinary maintenance excepted10.
Ridgewood adds local conditions. A grading and stormwater plan is required before a permit for development that increases impervious surface by 200 square feet or more, and flood-hazard-area or site-plan approvals may have to come first2. No permit issues until all required state, county and local approvals are in place11.
A new building needs a certificate of occupancy before anyone uses it12.
Who issues building permits in Ridgewood, and how do you reach them?
The Village of Ridgewood runs its own State Uniform Construction Code enforcing agency, the Department of Building and Inspections, with a Construction Official and subcode officials1. The Building Department says it enforces the Uniform Construction Code and local zoning regulations13.
The office is at 131 N Maple Avenue, Ridgewood, NJ 07450, and its listed phone is 201-670-5500 Ext. 550613. Bergen County does not issue Ridgewood's building permits; the county's role is limited to planning review of subdivisions and site plans that touch county roads or drainage14.
Does Ridgewood have zoning, and what does it mean for lot size and setbacks?
Yes. Ridgewood's land use chapter allows land and buildings to be used only for purposes the code permits in the zone district where they sit3. Bergen County does not zone; New Jersey leaves zoning to municipalities4.
Lot size, setbacks, height and lot coverage are set district by district under state law1516. We could not confirm the numbers for Ridgewood's residential districts, so ask the Ridgewood Building Department for the zone district and its dimensional standards before you buy13.
A zoning permit application needs the Village form, the fee set in the fee chapter, and plans; the Zoning Officer issues or denies it within 10 business days of receipt6. A new lot may not create a yard that fails the zone's requirements17.
How do septic permits work in Ridgewood?
New Jersey requires the board of health with jurisdiction to certify the sewerage facilities before any building permit issues5. A septic system also cannot be covered until a board of health representative inspects it and gives permission18.
Bergen County Health Services serves approximately 30 contracting towns, not every municipality19. We could not confirm which health department handles Ridgewood septic plans, or what the village's septic permit rules say, so ask the Ridgewood Building Department first and the county health department second1320.
Can you live in an RV or tiny home in Ridgewood?
We could not confirm. Ridgewood's code regulates storage of camping trailers and recreation vehicles, but we found no passage that settles whether anyone may live in one on a lot. We also found no Ridgewood rule that addresses tiny homes or accessory dwellings. Ask the Ridgewood Building Department's zoning staff in writing before you plan on either13.
Building a home in Ridgewood: the steps, in order
- Ask the Building Department which zone district the lot is in and what it allows13.
- Confirm zoning compliance; the Zoning Officer decides a zoning permit within 10 business days6.
- Get any site-plan, subdivision or flood-hazard approvals that must come first2.
- If the home uses septic, get board of health certification of the plan before the building permit5.
- File for the construction permit with the Building Department2.
- Build with the required inspections, including footing trenches and rough plumbing and electrical before framing is covered21.
- Obtain the certificate of occupancy; an owner who built the home must file an affidavit with the construction official8.
What stays with Bergen County, and what to check before you buy
Outside Ridgewood's rules, the county's role is narrow: subdivisions go to the County Planning Board for review, with approval needed only when a county road or drainage facility is involved14. A driveway onto a county road carries a $250 road-access permit fee22. Land outside the village is covered on the Bergen County page.
Check flood status first: development in a flood hazard area needs an application to the Floodplain Administrator, possibly in addition to a building permit9. Bergen County's typical home value is about $791,116 and its effective property tax rate is 1.7%2324.
Watch-outs
- Ridgewood's septic rules and the health department that serves the village could not be confirmed; ask before you rely on a septic plan5.
- Living in an RV or tiny home, accessory dwellings and minimum home size inside Ridgewood are unconfirmed; ask the Building Department13.
- Being an owner-builder exempts you from builder registration, not from building permits or inspections7.
Sources
- Chapter 125 Construction Codes, Uniform (Village of Ridgewood), quoted and re-checked
- ecode360.com (Village of Ridgewood), quoted and re-checked
- Chapter 190 Land Use and Development (Village of Ridgewood), quoted and re-checked
- Bergen County Standards for Sustainable Land Development—Site Plans, quoted and re-checked
- New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
- Article X Zoning (Village of Ridgewood), quoted and re-checked
- Builder Registration and New Home Warranty for Builders (New Jersey statewide rule), quoted and re-checked
- N.J.A.C. 5:23, Uniform Construction Code (New Jersey statewide rule), quoted and re-checked
- Article IV Permits, Floodplain Management (Village of Ridgewood), quoted and re-checked
- The New Jersey State Uniform Construction Code, quoted and re-checked
- New Jersey Uniform Construction Code, N.J.A.C. 5:23 (New Jersey statewide rule), quoted and re-checked
- N.J.A.C. 5:23, Uniform Construction Code (New Jersey statewide rule), quoted and re-checked
- Village of Ridgewood Building Department (ridgewoodnj.net)
- Bergen County Standards for Sustainable Land Development—Subdivisions, quoted and re-checked
- P.L. 2013, c.106 (Municipal Land Use Law amendments) (New Jersey statewide rule), quoted and re-checked
- P.L. 2013, c.106 (Municipal Land Use Law amendments) (New Jersey statewide rule), quoted and re-checked
- Article X Zoning (Village of Ridgewood), quoted and re-checked
- New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
- bergencountynj.gov, quoted and re-checked
- Bergen County Department of Health Services (bergencountynj.gov)
- New Jersey Department of Community Affairs, New Home Warranty—Consumer Information (New Jersey statewide rule), quoted and re-checked
- Fee Schedule for Site Plan Application, quoted and re-checked
- Typical home value (Zillow): Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
Written October 13, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.