The Borough of Laurel Springs in Camden County, New Jersey writes and enforces its own zoning ordinance1. Construction work needs a construction permit2, though the borough has voted to hand code enforcement to the state Department of Community Affairs, with the transfer pending3. Septic reviews run through the Camden County Septic and Wells Unit4.
At a glance
- Zoning
- Borough zoning ordinance (Chapter 270); the county does not zone15
- Building permit
- Construction permit required; enforcement moving to the state23
- Septic
- Camden County Septic and Wells Unit reviews individual systems4
- R-1 minimum lot
- 9,000 square feet and 60 feet wide6
- Tiny home (R-1)
- Only if it qualifies as a single detached one-family house7
- Second dwelling (R-1)
- Not allowed on an R-1 lot8
- Minimum construction permit fee
- $859
Who to call
Building permits
Borough of Laurel Springs (Borough Hall)
Main borough line; ask for the Construction Code Office and the zoning officer
723 West Atlantic Avenue, Laurel Springs, NJ 08021
Septic permits
Camden County Septic and Wells Unit
Reviews plans, inspects installation and repair, and issues compliance certificates for individual sewage disposal systems
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in Borough of Laurel Springs means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Laurel Springs, NJ have zoning, and what does it mean for lot size and setbacks?
Yes. The Borough of Laurel Springs adopts and administers its own zoning ordinance, Chapter 270 of the borough code1. Camden County itself does not zone land10.
The borough's districts are R-1 Residential, P/O Professional Office/Residential, BC Business Commercial and an Age-Restricted Housing Overlay11. In the R-1 zone, a single detached one-family dwelling needs a lot of at least 9,000 square feet and 60 feet of width at the building line6. R-1 front yards must be at least 25 feet, or the greater of the neighbors' setbacks12. Side yards must total at least 20 feet with 10 feet on each side, and rear yards must be at least 25 feet12. All structures together may cover no more than 50% of the lot13, and a principal dwelling may not exceed 2 1/2 stories or 35 feet14.
Detached garages and garden-tool buildings in R-1 are capped at 450 square feet and 24 feet tall15. We did not capture the P/O and BC district tables, so ask the zoning officer at Borough Hall.
Do you need a building permit in Laurel Springs, and who issues it?
Yes. Construction work inside the borough needs a construction permit, and the fee is due before the permit issues2. New Jersey's statewide Uniform Construction Code sets the rules, and ordinary maintenance is the main exception16.
One change matters for timing: the borough has adopted an ordinance relinquishing its code enforcement to the state Department of Community Affairs, effective 120 calendar days after a certified copy goes to the department, or sooner if the department takes over3. Until then the borough's Construction Code Office rules stay on the books, so confirm the transfer date and where to file with Borough Hall before applying3.
Fees under the borough's current schedule start at an $85 minimum construction permit fee, and new one-family construction building subcode fees run $0.045 per cubic foot with a $250 minimum9. Fees may change with the state transfer9.
How do septic permits work in Laurel Springs?
Camden County's Septic and Wells Unit oversees individual sewage disposal system reviews, including plan review, installation, repair and compliance certificates4. New Jersey law bars any building permit until the board of health having jurisdiction certifies the water supply and sewerage plans17. A system must also be inspected by the board of health's representative before it is covered18.
We could not confirm whether a given Laurel Springs lot is on public sewer or must connect to it, so ask Borough Hall before planning a septic system. Where a lot does need a septic system, conventional drain fields rate poorly across Camden County, so expect a site evaluation and possibly an engineered design19. Call the Camden County Septic and Wells Unit at (856) 374-606420.
Can you live in an RV or tiny home in Laurel Springs?
We could not confirm whether the borough allows living in a recreational vehicle or camping on private land; ask the Borough Hall zoning officer. For tiny homes, the R-1 zone permits only a single detached one-family house, and the code does not name tiny homes, so a tiny home qualifies only if it is a single detached one-family house on its own lot7. A manufactured home is allowed in R-1 only if the zoning definitions treat it as such a house21. A second dwelling on an R-1 lot is not allowed under the R-1 use rule8.
New Jersey's construction rules do not replace local approval: municipal zoning, septic and other site approvals still apply to a tiny home22.
Building a home in Laurel Springs: the steps, in order
- Confirm the zoning district and its lot, setback and coverage limits with the borough zoning officer11.
- Get septic or sewer answers: the Camden County Septic and Wells Unit certifies sewerage plans before a building permit can issue17.
- Apply for the construction permit with the borough, after confirming where to file during the state transfer3.
- Stop work for required inspections of footing trenches, rough plumbing and electrical, and framing23.
- Obtain a certificate of occupancy before moving in24. An owner who builds their own home must file an owner affidavit with the construction official first25.
What stays with Camden County, and what to check before you buy
Camden County does not zone, but its Planning Board reviews all subdivisions within the county, and a municipality may not issue building permits for resulting structures until required county approval is obtained26. County Public Works publishes access permits for county rights-of-way, with a private access fee of $10027; and a driveway onto a state highway needs a state access permit28. Borough floodplain rules require a floodplain development permit for development in flood hazard areas, but we could not confirm which parcels are mapped29.
For land outside the borough, see the Camden County page. County-wide, the effective property tax rate is 3.1%30 and the median property tax bill is $8,063 a year31.
Watch-outs
- Code enforcement is moving from the borough to the state Department of Community Affairs, so confirm who takes permit applications before you file3.
- We could not confirm RV occupancy, driveway rules or well permits inside the borough; ask Borough Hall at (856) 784-050032.
- New Jersey wells need a state drilling permit, with the well construction permit issued by municipal or county health officials33.
Sources
- Chapter 270 Zoning, Borough of Laurel Springs, NJ (eCode360) (Borough of Laurel Springs), quoted and re-checked
- Chapter 101 Construction Codes, Uniform, Borough of Laurel Springs, NJ (eCode360) (Borough of Laurel Springs), quoted and re-checked
- Chapter 101 Construction Codes, Uniform, Borough of Laurel Springs, NJ (eCode360) (Borough of Laurel Springs), quoted and re-checked
- Septic and Wells, quoted and re-checked
- P.L. 2013, c.106 — Municipal Land Use Law amendments (New Jersey statewide rule), quoted and re-checked
- Chapter 270 Article IV R-1 Residential Zone, Borough of Laurel Springs, NJ (eCode360) (Borough of Laurel Springs), quoted and re-checked
- Chapter 270 Article IV R-1 Residential Zone, Borough of Laurel Springs, NJ (eCode360) (Borough of Laurel Springs), quoted and re-checked
- Chapter 270 Article IV R-1 Residential Zone, Borough of Laurel Springs, NJ (eCode360) (Borough of Laurel Springs), quoted and re-checked
- Chapter 101 Construction Codes, Uniform, Borough of Laurel Springs, NJ (eCode360) (Borough of Laurel Springs), quoted and re-checked
- Camden County Development Regulations (2026 county census)
- Chapter 270 Zoning, Borough of Laurel Springs, NJ (eCode360) (Borough of Laurel Springs), quoted and re-checked
- Chapter 270 Article IV R-1 Residential Zone, Borough of Laurel Springs, NJ (eCode360) (Borough of Laurel Springs), quoted and re-checked
- Chapter 270 Article IV R-1 Residential Zone, Borough of Laurel Springs, NJ (eCode360) (Borough of Laurel Springs), quoted and re-checked
- Chapter 270 Article IV R-1 Residential Zone, Borough of Laurel Springs, NJ (eCode360) (Borough of Laurel Springs), quoted and re-checked
- Chapter 270 Article IV R-1 Residential Zone, Borough of Laurel Springs, NJ (eCode360) (Borough of Laurel Springs), quoted and re-checked
- N.J.A.C. 5:23-2.14, Construction permits—when required (New Jersey statewide rule), quoted and re-checked
- New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
- New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Camden County Septic and Wells Unit (camdencounty.com)
- Chapter 270 Article IV R-1 Residential Zone, Borough of Laurel Springs, NJ (eCode360) (Borough of Laurel Springs), quoted and re-checked
- The New Jersey State Uniform Construction Code: General Information, quoted and re-checked
- New Jersey Department of Community Affairs, New Home Warranty—Consumer Information (New Jersey statewide rule), quoted and re-checked
- N.J.A.C. 5:23, Uniform Construction Code (New Jersey statewide rule), quoted and re-checked
- N.J.A.C. 5:23, Uniform Construction Code (New Jersey statewide rule), quoted and re-checked
- Subdivision and Site Plan Review, quoted and re-checked
- Camden County Permit Book, quoted and re-checked
- Major Access Permits (New Jersey statewide rule), quoted and re-checked
- Chapter 141 Flood Damage Prevention Article I, Borough of Laurel Springs, NJ (eCode360) (Borough of Laurel Springs), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- Borough of Laurel Springs (Borough Hall) (laurelsprings-nj.com)
- Bulletin 88-10: Private On-Site Water Supply Systems (New Jersey statewide rule), quoted and re-checked
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.