The Borough of Mount Arlington, New Jersey, in Morris County, issues its own construction permits through its Construction Department, and nearly every improvement needs zoning review before work begins12. Zoning is the borough's, not Morris County's3. Septic permits come from the Mount Arlington Board of Health4.
At a glance
- Building permit
- Required; issued by the borough Construction Department25
- Zoning
- Borough zoning; review needed before work starts, even for permit-exempt projects1
- Septic permit
- Required; issued by the Borough Board of Health4
- New construction fee
- $0.43 per cubic foot, $70 minimum6
- Final inspection penalty
- $2,000 if cited for skipping final inspections7
- Owner-occupied work
- Owner may sign as exempt applicant on the state permit form8
Who to call
Building permits
Borough of Mount Arlington Construction Department
Construction permits, inspections and certificates of occupancy under the State Uniform Construction Code, plus zoning applications, inside Mount Arlington
419 Howard Boulevard Mount Arlington, NJ 07856
Septic permits
Borough of Mount Arlington Board of Health
Permits to locate, construct or alter individual sewage disposal systems inside Mount Arlington
Contact details are copied from each office’s official page and were checked against it on October 13, 2026.
Off-grid gear
Going off-grid in Borough of Mount Arlington means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Mount Arlington, NJ?
Yes. Inside Mount Arlington, construction permits are required for decks, swimming pools, kitchen and bathroom renovations, finished basements, water heaters, sheds, new electric, generators, transfer switches and new plumbing, and the borough says those are only examples29. New homes fall under New Jersey's Uniform Construction Code, which the borough enforces through its own Building Department5.
New construction is charged $0.43 per cubic foot with a $70 minimum, and plan review is 20% of the construction permit fee, credited toward it6. Payment must be cash or check; the borough does not take credit cards10.
If you are unsure whether a project needs a permit, the borough asks you to call the Construction Department before starting2.
Who issues building permits in Mount Arlington, and how do you reach them?
The Borough of Mount Arlington Construction Department issues building permits and runs inspections for addresses inside the borough9. Call 973-398-6832 ext 114 or visit 419 Howard Boulevard; inspections are scheduled by phone and need your permit number109.
Morris County does not issue building permits. Permit applications go to the local construction office in the municipality where the work happens11. Mount Arlington's Construction Department is the right counter, not a county or Morristown office.
Homeowners are responsible for calling for every inspection, and a cited failure to get final inspections carries a $2,000 penalty7.
Does Mount Arlington have zoning, and what does it mean for lot size, setbacks and RVs?
Yes. Mount Arlington zones through borough ordinance, and the borough publishes a Zoning Application & Procedures page, a Zoning Schedule 1 and a Zoning Map12. New Jersey counties have no zoning power, so Morris County sets none for the borough3.
In general, every improvement needs zoning review before work begins, even when it is exempt from a construction permit1. For an owner-occupied one- or two-family addition or alteration, zoning approval must be in place before plan review proceeds13.
Minimum lot size, setbacks, lot coverage and height are set district by district in the borough's zoning ordinance, and we could not confirm those figures1415. Ask the Zoning Officer at the Construction Department which district your parcel is in. We also could not confirm whether RV or tiny-home occupancy is allowed on a lot in Mount Arlington; ask the Zoning Officer before you plan on either.
How do septic permits work in Mount Arlington?
A permit from the Mount Arlington Board of Health is required before anyone locates, constructs or alters an individual sewage disposal system inside the borough4. The borough code sets application fees of $150 for new construction and $75 for alterations4.
New Jersey law also bars the building permit until the board of health certifies the proposed water supply and sewerage facilities, so septic approval comes before the construction permit16. The state requires inspection before a septic system is covered17.
We could not confirm the borough's rules for private wells or off-grid sanitation; ask the Board of Health through the borough.
Building a home in Mount Arlington: the steps, in order
- Call the Zoning Officer at the Construction Department to confirm your district and file a zoning application19.
- Get septic approval from the Board of Health, which must certify before a building permit issues416.
- If the lot is a one-family lot with slopes of 15% or less, submit a land-surveyor site plan showing a paved driveway at no more than 13% grade18.
- File the construction permit application with the borough Construction Department10.
- Call for each inspection with your permit number7.
- Obtain a certificate of occupancy; an owner-built home also needs an owner's affidavit filed with the construction official19.
What stays with Morris County, and what to check before you buy in Mount Arlington
Morris County's rules cover land outside the borough; see the Morris County page for unincorporated-area answers. Inside Mount Arlington, the county does not set zoning or issue building permits3.
A driveway onto a county road needs a county permit, and a driveway onto a state highway needs a state access permit2021. Subdivisions that front on county roads go to the county for review22.
Morris County's median property tax bill is $10,001 a year at an effective rate of 1.8%2324. Only 12.4% of county soils are rated not limited for a conventional septic drain field, so expect a site evaluation and possibly an engineered system25.
Watch-outs
- Zoning review applies to nearly every improvement, including fences, sheds and pools that are exempt from a construction permit1.
- Skipping final inspections can bring a $2,000 penalty, even on old permits that were never closed out, though the borough says no penalty is incurred if you call to get them done7.
- Mount Arlington's district lot sizes, setbacks, RV and tiny-home rules, and private-well rules are not confirmed here; the borough's Chapter 17 zoning schedule governs the first three, so ask the Zoning Officer and Construction Department before you buy12.
- The Construction Department takes cash or check only10.
Sources
- Construction - Borough of Mount Arlington (Borough of Mount Arlington), quoted and re-checked
- Construction - Borough of Mount Arlington (Borough of Mount Arlington), quoted and re-checked
- P.L. 2013, c.106 — Municipal Land Use Law amendments (New Jersey statewide rule), quoted and re-checked
- Chapter 204 Sewage Disposal Systems (Borough of Mount Arlington), quoted and re-checked
- Chapter 67 Construction Codes, Uniform (Borough of Mount Arlington), quoted and re-checked
- Chapter 67 Construction Codes, Uniform (Borough of Mount Arlington), quoted and re-checked
- Construction - Borough of Mount Arlington (Borough of Mount Arlington), quoted and re-checked
- nj.gov, quoted and re-checked
- Borough of Mount Arlington Construction Department (mountarlingtonnj.org)
- Construction - Borough of Mount Arlington (Borough of Mount Arlington), quoted and re-checked
- Construction Permit Application Packet & Related Forms, quoted and re-checked
- Construction - Borough of Mount Arlington (Borough of Mount Arlington), quoted and re-checked
- New Jersey Uniform Construction Code, N.J.A.C. 5:23 (New Jersey statewide rule), quoted and re-checked
- P.L. 2013, c.106 (Municipal Land Use Law amendments) (New Jersey statewide rule), quoted and re-checked
- P.L. 2013, c.106 (Municipal Land Use Law amendments) (New Jersey statewide rule), quoted and re-checked
- New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
- New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
- Chapter 67 Construction Codes, Uniform (Borough of Mount Arlington), quoted and re-checked
- N.J.A.C. 5:23, Uniform Construction Code (New Jersey statewide rule), quoted and re-checked
- Morris County Land Development Standards, quoted and re-checked
- Major Access Permits (New Jersey statewide rule), quoted and re-checked
- Land Development Review, quoted and re-checked
- Median property tax bill: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
Written October 13, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.