The Borough of Mountain Lakes, in Morris County, New Jersey, requires a construction permit from its Construction Official before a building or structure is erected, altered or demolished1. The borough adopts and administers its own zoning ordinance2, and a zoning permit must be issued before a building permit3. Septic permits come from the borough Board of Health4.
At a glance
- Building permit
- Required; issued by the borough Construction Official1
- Zoning
- Borough Land Use and Zoning Ordinance; zoning permit before a building permit23
- Septic permit
- Issued by the borough Board of Health4
- Certificate of occupancy
- Required before land or a structure is occupied or used5
- Accessory apartments
- Affordable accessory apartments allowed in residential zones, subject to Article XVIII6
Who to call
Building permits
Borough of Mountain Lakes Construction Office
Construction permits, code enforcement and zoning approvals inside Mountain Lakes
400 Boulevard
Septic permits
Borough of Mountain Lakes Health Office (Board of Health)
Borough health office; the Board of Health issues septic system permits inside Mountain Lakes
400 Boulevard
Contact details are copied from each office’s official page and were checked against it on October 13, 2026.
Off-grid gear
Going off-grid in Borough of Mountain Lakes means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Mountain Lakes, NJ have zoning, and what does it mean for RVs, tiny homes and lot size?
Yes. The Borough of Mountain Lakes adopts and administers its own Land Use and Zoning Ordinance, enforced by the Construction Official, Code Enforcement Official, Zoning Officer or another officer the Borough Manager designates2. Morris County does not zone; New Jersey gives zoning authority to municipalities7.
Lot size, setbacks, height and coverage are set district by district under state law, so the answer depends on the zoning district of the parcel89. We could not confirm a minimum dwelling size, and we could not confirm any rule on living in an RV, camping, tiny homes or manufactured homes inside the borough; ask the Construction Office at 973-334-3131 before you plan any of those10.
Affordable accessory apartments are listed as permitted accessory uses in the residential zones, subject to Article XVIII of the ordinance6.
Do you need a building permit in Mountain Lakes, and who issues it?
Yes. In Mountain Lakes, no building or structure may be erected, moved, extended, enlarged, altered or demolished until the Construction Official grants a permit1. The permit is conditional until a foundation survey is made once the foundation is in place1.
A zoning permit certifying that the request conforms to the zoning chapter is issued before the building permit3. The borough's Construction Office states that zoning approvals are required for additions, changes of use and some alterations10.
New Jersey's Uniform Construction Code applies statewide and is enforced locally by municipal construction officials11. Morris County does not issue building permits12. A homeowner may sign as the owner-occupant when doing the work on an owner-occupied home13; we could not confirm a borough-specific owner-builder rule, so ask the Construction Office.
How do septic permits work in Mountain Lakes?
Inside Mountain Lakes, no one may locate, construct or alter an individual sewage disposal system until the Board of Health issues a permit4. This is a borough permit, not a Morris County Division of Public Health permit.
The borough requires a final inspection by the Health Officer, to be made within 48 hours of notice, excluding weekends and holidays, and the applicant must give notice before any underground portions are covered14. Where no public or private sewer is available, a house connects to a septic tank or other individual facility; a direct sewer connection is required when one becomes available15.
State law bars a building permit until the board of health certifies the water supply and sewerage facilities16. About 12% of the soils in Morris County rate as not limited for a conventional drain field, so expect a site evaluation and possibly an engineered system17.
Building a home in Mountain Lakes: the steps, in order
- Confirm the zoning district and ask the Construction Office what applies to your parcel10.
- Get the septic or sewer approval from the borough Board of Health, because state law requires it before a building permit16.
- Obtain a zoning permit certifying conformity with the zoning chapter3.
- If you are subdividing or the project needs site-plan review, get Planning Board approval first; a single-family home has exceptions from site-plan review18.
- Apply for the construction permit from the Construction Official1.
- Have required inspections made at footing, rough plumbing and electrical, and framing stages19.
- Obtain the certificate of occupancy before using the structure5.
What stays with Morris County and the state, and what to check before you buy?
Morris County does not issue building permits or zoning inside the borough12. County-level items are subdivision applications that front on county roads20 and work in a county right-of-way, which needs a County Engineering Division permit21. A driveway onto a state highway needs a state access permit22.
For the rest of Morris County outside the borough, see the Morris County page.
Before you buy, check floodplain and drainage rules and driveway access with the Construction Office; we could not confirm a complete borough rule on either. Morris County's effective property tax rate is 1.8%23.
Watch-outs
- We could not confirm borough rules on RV living, temporary camping, tiny homes, manufactured homes, minimum dwelling size or short-term rentals; ask the Construction Office at 973-334-313110.
- The borough's well permit rule is unconfirmed; state law has municipal or county health officials issue well construction permits24.
- A new owner-built home still needs a certificate of occupancy, and the owner must file an affidavit with the construction official25.
Sources
- Article VII: Permits and Certificates (Borough of Mountain Lakes), quoted and re-checked
- ecode360.com (Borough of Mountain Lakes), quoted and re-checked
- Article VII: Permits and Certificates (Borough of Mountain Lakes), quoted and re-checked
- Chapter 290: Sewage Disposal Systems, Individual (Borough of Mountain Lakes), quoted and re-checked
- Article VII: Permits and Certificates (Borough of Mountain Lakes), quoted and re-checked
- Article X: Zoning District Regulations (Borough of Mountain Lakes), quoted and re-checked
- P.L. 2013, c.106 — Municipal Land Use Law amendments (New Jersey statewide rule), quoted and re-checked
- P.L. 2013, c.106 (Municipal Land Use Law amendments) (New Jersey statewide rule), quoted and re-checked
- P.L. 2013, c.106 (Municipal Land Use Law amendments) (New Jersey statewide rule), quoted and re-checked
- Borough of Mountain Lakes Construction Office (mountainlakes.gov)
- Bureau of Construction Project Review, quoted and re-checked
- Town of Morristown - Division of Building and Uniform Construction Code (2026 county census)
- nj.gov, quoted and re-checked
- ecode360.com (Borough of Mountain Lakes), quoted and re-checked
- Chapter 191: Sewers (Borough of Mountain Lakes), quoted and re-checked
- New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Article VIII: Subdivision of Land and Site Plan Review (Borough of Mountain Lakes), quoted and re-checked
- New Jersey Department of Community Affairs, New Home Warranty—Consumer Information (New Jersey statewide rule), quoted and re-checked
- Land Development Review, quoted and re-checked
- Morris County Land Development Standards, quoted and re-checked
- Major Access Permits (New Jersey statewide rule), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Bulletin 88-10: Private On-Site Water Supply Systems (New Jersey statewide rule), quoted and re-checked
- N.J.A.C. 5:23, Uniform Construction Code (New Jersey statewide rule), quoted and re-checked
Written October 13, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.