The Borough of Bloomingdale, in Passaic County, New Jersey, runs its own zoning under Chapter 92 of the borough code1. Construction permits are required under the statewide Uniform Construction Code2, and the borough Building Department is the office to call3. Septic systems need board of health certification before a building permit can issue4. Passaic County does not zone land5.
At a glance
- Building permit
- Required under New Jersey's Uniform Construction Code; apply to the borough Building Department23
- Zoning
- Borough zoning (Chapter 92), not county zoning15
- Largest-lot district
- R-130: 3 acres minimum, 250 feet of frontage6
- Main single-family district
- R-10: 10,000 square feet minimum lot7
- Septic
- Board of health certification required; banned within 100 feet of a public sewer48
- Owner-builder
- Owner may prepare own plans by affidavit; permit and inspections still required9
Who to call
Building permits
Bloomingdale Building Department
Construction, zoning and subcode officials for the borough, the office to ask about building permits and zoning approval
101 Hamburg Turnpike, Bloomingdale, NJ 07403
Health department
Borough health department; ask here about septic certification and well permits
101 Hamburg Turnpike, Bloomingdale, NJ 07403
Contact details are copied from each office’s official page and were checked against it on October 23, 2026.
Off-grid gear
Going off-grid in Borough of Bloomingdale means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Bloomingdale, NJ have zoning?
Yes. The Borough of Bloomingdale zones its own land under Chapter 92 of the borough code1. Passaic County has no zoning authority of its own, so the borough, not the county, decides what can be built on a lot5.
The one-family districts include R-130, R-40, R-20, R-20U, R-10 and R-40-TH10. The borough has no separate agricultural or rural-residential zone6. In R-130, the largest-lot district, a lot needs at least three acres, 250 feet of frontage and 350 feet of depth6. In R-10, the lot needs at least 10,000 square feet, 75 feet of frontage and 100 feet of depth7.
Setbacks and coverage differ by district. R-130 principal structures need a 50-foot front yard and 50-foot rear yard11, and total lot coverage is capped at 12 percent12. R-10 requires a 25-foot front yard and 25-foot rear yard13, with lot coverage capped at 45 percent14. Principal buildings in both districts top out at 35 feet1516. Check the borough zoning map for your parcel's district.
Can you live in an RV, tiny home or accessory building in Bloomingdale?
We could not confirm Bloomingdale's rules on long-term RV living, camping or tiny homes, so ask the Building Department before you plan on any of them3. One rule is clear: accessory structures such as detached garages and sheds may not be used as a dwelling17. A residential lot may hold one principal dwelling and no more than two accessory structures17. Manufactured HUD homes statewide are limited to use group R-5, single-family dwellings18; whether Bloomingdale's zoning allows one on a given lot is unconfirmed.
Do you need a building permit in Bloomingdale, and who issues it?
Yes. New Jersey law makes it unlawful to construct, enlarge, alter or demolish a structure without first filing an application with the construction official and obtaining the permit2. In Bloomingdale that is the borough Building Department, which lists a construction and zoning official and building, electrical, plumbing and fire subcode officials3. Ordinary maintenance does not need a permit, and minor work is treated separately2.
An owner building a single-family home for personal use may prepare the plans personally and file an affidavit to waive the sealed-plan requirement, but the construction permit and inspections still apply9. Fee amounts are set by borough ordinance, and we have not confirmed Bloomingdale's current schedule19. Statewide, the plan-review fee runs from five percent to 25 percent of the construction-permit fee20.
How do septic permits work in Bloomingdale?
Septic approval comes from the board of health, not the Building Department. State law bars any municipality from issuing a building permit until the board of health certifies that the proposed sewerage facilities comply with state and local standards4. The board's authorized representative must also inspect a septic tank or tile field before it is covered21. Bloomingdale's health office is reached through the board of health secretary22.
Sewer comes first where it is available. Septic tanks and cesspools are unlawful where a public sewer lies within 100 feet of the property line8, and the borough requires connection within 120 days of official notice23. Where no sewer is available, private systems are allowed at the owner's expense under state health standards8. Soil is a real constraint: about 11.4 percent of Passaic County soils rate as not limited for a conventional drain field, so most rural lots need a site evaluation24. Private wells need a state drilling permit plus a municipal or county health official's construction permit25.
Building a home in Bloomingdale: the steps, in order
- Confirm the lot's zoning district and check minimum lot size, setbacks and coverage against your plans with the Building Department3.
- Ask whether a public sewer is within 100 feet of the property line; if so, plan to connect rather than install septic8.
- If no sewer is available, get board of health certification of your septic and water plans before applying for the building permit4.
- Subdividing a lot goes through borough Chapter 69 site plan and subdivision rules26, and subdivisions that touch county roads also go to the Passaic County Planning Board27.
- File the construction permit application with the construction official; no permit issues until all required state, county and local approvals are in place28.
- Stop work for inspections at the footing, rough plumbing and electrical, and framing stages29.
- Obtain the certificate of occupancy after final inspection30. An owner-built home also needs an affidavit filed with the construction official31.
What stays with Passaic County and the state, and what to check before you buy?
The county's role is limited. Passaic County reviews subdivisions through its Planning Board27 but does not zone land32. A driveway onto a state highway needs a state access permit33. For land outside Bloomingdale, see the Passaic County page.
County-level numbers frame the cost: the typical home value is about $604,08334, and the effective property tax rate is 2.3 percent35. Passaic County is dense, with about 2,760 people per square mile36.
Watch-outs
- We could not confirm who issues septic permits in Bloomingdale or what its board of health ordinance requires, so call the board of health secretary before you buy a lot that is not on sewer22.
- Rules on RVs, camping, tiny homes and minimum house size inside Bloomingdale were not confirmed; ask the Building Department before you rely on any of them3.
- The borough's rules apply only inside Bloomingdale; land across the line in a neighboring town follows that town's zoning5.
Sources
- Chapter 92 Zoning, Article XII Schedule of Regulations (eCode360) (Borough of Bloomingdale), quoted and re-checked
- N.J.A.C. 5:23-2.14, Construction permits—when required (New Jersey statewide rule), quoted and re-checked
- Bloomingdale Building Department (bloomingdalenj.net)
- New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
- P.L. 2013, c.106 — Municipal Land Use Law amendments (New Jersey statewide rule), quoted and re-checked
- Chapter 92 Zoning, Article XII Schedule of Regulations (eCode360) (Borough of Bloomingdale), quoted and re-checked
- Chapter 92 Zoning, Article XII Schedule of Regulations (eCode360) (Borough of Bloomingdale), quoted and re-checked
- Chapter 18 Sewers (eCode360) (Borough of Bloomingdale), quoted and re-checked
- N.J.A.C. 5:23-2.15A Construction permit for a single-family residence, quoted and re-checked
- Chapter 92 Zoning, Article XII Schedule of Regulations (eCode360) (Borough of Bloomingdale), quoted and re-checked
- Chapter 92 Zoning, Article XII Schedule of Regulations (eCode360) (Borough of Bloomingdale), quoted and re-checked
- Chapter 92 Zoning, Article XII Schedule of Regulations (eCode360) (Borough of Bloomingdale), quoted and re-checked
- Chapter 92 Zoning, Article XII Schedule of Regulations (eCode360) (Borough of Bloomingdale), quoted and re-checked
- Chapter 92 Zoning, Article XII Schedule of Regulations (eCode360) (Borough of Bloomingdale), quoted and re-checked
- Chapter 92 Zoning, Article XII Schedule of Regulations (eCode360) (Borough of Bloomingdale), quoted and re-checked
- Chapter 92 Zoning, Article XII Schedule of Regulations (eCode360) (Borough of Bloomingdale), quoted and re-checked
- Chapter 92 Zoning, Article IV Supplementary Lot, Height and Yard Regulations (eCode360) (Borough of Bloomingdale), quoted and re-checked
- Manufactured/Modular Buildings Program (New Jersey statewide rule), quoted and re-checked
- ecode360.com (Borough of Bloomingdale), quoted and re-checked
- New Jersey Uniform Construction Code, N.J.A.C. 5:23 (New Jersey statewide rule), quoted and re-checked
- New Jersey Statutes, R.S. 58:11-23 through 58:11-43 (New Jersey statewide rule), quoted and re-checked
- Bloomingdale Board of Health (bloomingdalenj.net)
- Chapter 18 Sewers (eCode360) (Borough of Bloomingdale), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Bulletin 88-10: Private On-Site Water Supply Systems (New Jersey statewide rule), quoted and re-checked
- Borough of Bloomingdale, NJ code table of contents (eCode360) (Borough of Bloomingdale), quoted and re-checked
- Passaic County Subdivision Resolution, quoted and re-checked
- New Jersey Uniform Construction Code, N.J.A.C. 5:23 (New Jersey statewide rule), quoted and re-checked
- New Jersey Department of Community Affairs, New Home Warranty—Consumer Information (New Jersey statewide rule), quoted and re-checked
- N.J.A.C. 5:23, Uniform Construction Code (New Jersey statewide rule), quoted and re-checked
- N.J.A.C. 5:23, Uniform Construction Code (New Jersey statewide rule), quoted and re-checked
- Passaic County NJ State Plan Cross-Acceptance Response, quoted and re-checked
- Major Access Permits (New Jersey statewide rule), quoted and re-checked
- Typical home value (Zillow): Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
- Population density: Bolthole Index county data
Written October 23, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.