The City of Lovington, New Mexico (Lea County) runs its own zoning and requires permits to construct, alter or move a building inside city limits1. Zoning approval comes first, and state building permits cover plumbing, electrical and structural work1. Septic systems are permitted by the New Mexico Environment Department, not the city2.
At a glance
- Zoning
- Yes. The city has four zones: single-family, multi-family, commercial and industrial3
- Building permit
- Required inside city limits; zoning approval comes first1
- Minimum home size
- 800 sq ft for a single-family home in zone A4
- Mobile and manufactured homes
- Not permitted by right outside mobile home parks; city approval required5
- RV living
- RV parks only, in zone C on a platted tract6
- Septic
- Permitted by the New Mexico Environment Department2
- Owner-builder
- Homeowner permit available statewide, with conditions7
Who to call
Zoning
City of Lovington Planning and Zoning
Zoning, subdivision, mobile home and RV park applications and development permits inside Lovington city limits
Septic permits
New Mexico Environment Department — Hobbs Field Office
Local liquid-waste (septic) permitting questions and permit searches
2120 N Alto, Hobbs, NM 88240
Contact details are copied from each office’s official page and were checked against it on October 14, 2026.
Off-grid gear
Going off-grid in Lovington means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Lovington, NM have zoning, and what does it mean for homes and RVs?
Yes. The City of Lovington divides land inside city limits into four zones: single-family residential, multi-family residential, commercial and industrial3. The first step in developing a lot is to identify its zone, because the zone decides what you may build8.
A single-family home in zone A must be at least 800 square feet4. Mobile and manufactured homes are not permitted by right in any zone except mobile home parks; siting one elsewhere takes city approval5. Recreational vehicle parks are permitted in zone C, and the tract must be platted under the multi-family residential rules6. The city's materials describe RV parks, not living in a single RV on a private lot, so ask the planning office before you plan on that.
Do you need a building permit in Lovington, and who issues it?
Yes. Permits are generally required to construct, alter, repair, remove, demolish or move any building or structure inside Lovington1. City zoning and subdivision approval is required before you submit development permits1.
For a site-built or modular home, state building permits cover the plumbing, electrical and structural work1. State permit applications are handled by the New Mexico Construction Industries Division, which also requires inspections including foundation, frame and final9. A homeowner building their own primary residence can use a homeowner's permit, but must sign and notarize the Homeowner's Responsibilities Form7. We could not confirm which building code or inspection office the city itself applies; ask the City of Lovington Planning and Zoning office10.
How do septic permits work in Lovington?
The New Mexico Environment Department Onsite Wastewater Bureau administers the statewide septic program for Lea County2. Septic and holding tanks must be permitted by the state, and new tanks need county pre-approval before state approval11.
We could not confirm whether the city requires a sewer connection for a given lot. Ask the city planning office whether your address is on city sewer, and the NMED Hobbs field office about any septic permit1012.
Building a home in Lovington: the steps, in order
- Identify the lot's zone and confirm your use is allowed there; the city encourages a pre-application meeting13.
- Submit the planning and zoning application at least three weeks before the meeting where it will be heard13.
- If you are dividing land, plat or re-plat it first; subdivisions of up to three lots may use the alternate summary process14.
- Obtain the state building permit once zoning is approved1.
- Request required inspections, then a certificate of occupancy before anyone moves in15.
What stays with Lea County, and what to check before you buy near Lovington
Outside city limits the rules change. Land within one mile of the city boundary falls under the Lovington-Lea County Extraterritorial Zoning Ordinance, administered through the county16. County driveway permits, floodplain permits and RV-park approvals are county matters for unincorporated land17. For land outside the city, use Lea County's page.
County-level context: farmland averages about $979 per acre18, the effective property tax rate in Lea County is 0.5%19, and drought has been severe in about 37% of years20.
Watch-outs
- City code details such as setbacks, lot sizes, fees and accessory dwellings inside Lovington were not confirmed; ask the City of Lovington Planning and Zoning office at (575) 396-9301 before you buy10.
- A mobile or manufactured home needs city approval to be sited outside a mobile home park, and each home in a park needs a placement permit5.
- Zoning approval is required before the city will accept development permit applications1.
Sources
- City of Lovington Planning and Zoning Application (Lovington), quoted and re-checked
- Onsite Wastewater Program, quoted and re-checked
- City of Lovington Planning and Zoning Application (Lovington), quoted and re-checked
- City of Lovington Planning and Zoning Application (Lovington), quoted and re-checked
- City of Lovington Planning and Zoning Application (Lovington), quoted and re-checked
- City of Lovington Planning and Zoning Application (Lovington), quoted and re-checked
- Building Permit Guide for Residential Construction, quoted and re-checked
- City of Lovington Planning and Zoning Application (Lovington), quoted and re-checked
- Building Permit Guide for Residential Construction, quoted and re-checked
- City of Lovington Planning and Zoning (lovington.org)
- Liquid Waste, quoted and re-checked
- New Mexico Environment Department — Hobbs Field Office (env.nm.gov)
- City of Lovington Planning and Zoning Application (Lovington), quoted and re-checked
- City of Lovington Planning and Zoning Application (Lovington), quoted and re-checked
- Building Permit Guide for Residential Construction, quoted and re-checked
- Lovington-Lea County Extraterritorial Zoning Ordinance, quoted and re-checked
- 2026 Lea County Permit Application, quoted and re-checked
- Farmland value per acre (USDA census): Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
- Share of years in severe drought: Bolthole Index county data
Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.