Building permits, zoning and land rules in San Miguel County, New Mexico

52Index Score / 100
#6 of 33 in New Mexico

Building permits are required in unincorporated San Miguel County, New Mexico, and come from the state Construction Industries Division because the county has no local building department1. San Miguel County separately administers zoning-development permits in unincorporated areas2. Septic permits and installation inspections go through the New Mexico Environment Department34.

At a glance

Building permit
Required for covered work; issued by New Mexico CID15
Zoning
County Zoning Development Permits apply in unincorporated areas2
Septic
NMED permit and inspection through the Las Vegas field office346
RV living
County rules not confirmed; ask Planning and Zoning before relying on RV occupancy7
Tiny home
State code recognizes permanent-foundation tiny houses; county zoning still applies89
Owner-builder
A qualified owner may use a homeowner permit for a primary residence10
Minimum home size
No county minimum confirmed; ask Planning and Zoning for the parcel7

Who to call

Building permits

New Mexico Construction Industries Division — Santa Fe Office

State building permits, plan review, and inspections for unincorporated San Miguel County

505-476-4700

2550 Cerrillos Road - 3rd Floor, Santa Fe, NM 87505

Online permits →

Planning & zoning

San Miguel County Planning and Zoning Department

Zoning development permits, land-use and code enforcement, and floodplain development regulation in unincorporated San Miguel County

(505) 454-1074

500 W. National Ave. Suite 110, Las Vegas, NM 87701

Septic permits

New Mexico Environment Department — Las Vegas Field Office

Onsite wastewater and septic permit questions and permit searches for San Miguel County

505-454-2801

lasvegas.ehb@env.nm.gov

2538 Ridgerunner Road, Las Vegas, NM 87701

Contact details are copied from each office’s official page and were checked against it on October 10, 2026.

Off-grid gear

Going off-grid in San Miguel County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in San Miguel County, New Mexico?

Yes. Covered construction in unincorporated San Miguel County requires a permit from the New Mexico Construction Industries Division, because the county has no local building department1. State rules require a permit before regulated buildings are erected, enlarged, altered, repaired, moved, improved, removed, converted, or demolished5. One-story detached tool sheds, storage sheds, playhouses, and similar accessory buildings no larger than 120 square feet are among the limited residential exemptions5. Fences no higher than 6 feet and qualifying detached decks no larger than 200 square feet are also exempt from the building permit, but separate electrical, plumbing, or mechanical permits may still apply5. Construction under CID is governed by New Mexico's adopted building codes1112.

Who issues San Miguel County building permits, and how do you reach them?

The New Mexico Construction Industries Division issues state building permits for unincorporated San Miguel County1. The CID Santa Fe office is at 2550 Cerrillos Road - 3rd Floor, Santa Fe, NM 87505, and its phone number is 505-476-470013. For a homeowner permit, CID lists county planning and zoning approval, complete plans, a Multi-Purpose State Building Application, and the permit fee among the submission requirements14. CID building permit fees vary with construction type, square footage, materials, and construction cost, so contact CID for the project-specific amount15. New Mexico's homeowner permit allows a qualifying owner to build or alter the owner's primary residence without a contractor license; the permit remains required, and the owner must perform the major portion of the work10.

Does San Miguel County, New Mexico have zoning?

San Miguel County administers land-use and zoning-development permitting in unincorporated areas2. Standards depend on the parcel's district. In the El Valle–Tecolote subarea, A1 calls for a 1-acre minimum lot, a 20-foot front setback, and 10-foot side yards1617. The same subarea's A2 district calls for a 2-acre minimum lot, one dwelling per parcel, a 20-foot front setback, and 10-foot side yards1819. Its TC district has a half-acre minimum lot, while RH has a 5-acre minimum2021. These subarea standards are not a countywide schedule; ask Planning and Zoning to identify the parcel's district and current controls7. Incorporated municipalities may administer separate rules, so county answers should not be carried into the City of Las Vegas or another incorporated place22.

How do septic permits work in San Miguel County?

The New Mexico Environment Department administers onsite liquid-waste permits and inspections in San Miguel County3. Submit a complete application and supporting documents to the local NMED field office; NMED may approve, condition, or deny it, and payment follows approval or conditional approval2324. The Las Vegas field office is at 2538 Ridgerunner Road, Las Vegas, NM 87701; call 505-454-2801 or email lasvegas.ehb@env.nm.gov about septic permits and permit searches6. Request the installation inspection at least 48 hours, or two business days, in advance, and do not cover the system before inspection; an approved inspection leads to a Permit to Operate4. A qualified homeowner may install a conventional system only for the homeowner's personal residence, and every homeowner installation requires an NMED final inspection25. Only about 10.7% of county soils are rated without severe limitations for a conventional drain field, so evaluate the site early26.

Can you live in an RV or tiny home in San Miguel County?

We could not confirm a San Miguel County rule allowing full-time RV occupancy or temporary camping on private land, so ask Planning and Zoning about the parcel and proposed duration before moving an RV onsite7. New Mexico's residential code recognizes a tiny house as a dwelling unit on a permanent foundation with no more than 400 square feet of floor area excluding lofts8. A tiny house remaining on a chassis with a permanent axle is treated as a recreational vehicle rather than a code-compliant permanent-foundation tiny house8. State recognition does not settle county zoning, and we could not confirm county rules for tiny homes, manufactured homes, accessory dwellings, minimum dwelling size, or setbacks; ask Planning and Zoning before purchase or placement97. A manufactured home separately requires a state installation permit, but that permit does not grant local zoning approval27.

What are the steps to build a home in San Miguel County?

  1. Confirm that the parcel is in unincorporated San Miguel County, then ask Planning and Zoning for the zoning district, development permit, setbacks, access, floodplain requirements, and any subdivision review2287.
  1. Evaluate the site for wastewater and submit the septic application and supporting documents to NMED's Las Vegas field office246.
  1. Obtain county planning and zoning approval, prepare complete plans, complete the state building application, and ask CID for the project-specific building permit fee1415.
  1. Obtain approval before connecting a regulated building or system to a utility, energy, fuel, or power source29.
  1. Schedule the required building inspections, and request the NMED septic inspection before covering the system304.

What should you check before buying land in San Miguel County?

Check legal access, the zoning map, floodplain status, water supply, septic feasibility, and whether the parcel came from a regulated subdivision before making the purchase nonrefundable3128724. San Miguel County experiences severe drought in about 43.9% of years, while annual precipitation averages 16.6 inches, so confirm the lawful and practical water source rather than assuming a well will be adequate3233. We could not confirm the precise well-permit rule; ask the New Mexico Office of the State Engineer before drilling. Only about 10.7% of county soils avoid severe limitations for a conventional septic drain field, making a professional site evaluation especially valuable26. About 13.9% of the county is federal land, so compare the legal description with ownership maps and recorded access34.

Watch-outs

  • A state building permit does not replace San Miguel County zoning approval for unincorporated land12.
  • Do not assume that an RV, wheeled tiny home, or manufactured home may be occupied on a parcel merely because the structure meets a state standard; ask Planning and Zoning about the proposed use and location8277.
  • Do not cover a septic installation before NMED inspection; request the inspection at least 48 hours, or two business days, ahead4.

Sources

  1. New Mexico Regulation & Licensing Department - Construction Industries Division (2026 county census)
  2. Planning and Zoning, quoted and re-checked
  3. Apply for a Permit, quoted and re-checked
  4. Apply for a Permit, quoted and re-checked
  5. Building Permit Guide for Residential Construction (New Mexico statewide rule), quoted and re-checked
  6. New Mexico Environment Department — Las Vegas Field Office (env.nm.gov)
  7. San Miguel County Planning and Zoning Department (co.sanmiguel.nm.us)
  8. 14.7.3 NMAC — 2021 New Mexico Residential Building Code (New Mexico statewide rule), quoted and re-checked
  9. Planning and Zoning, quoted and re-checked
  10. 14.5.2 NMAC — Permits, quoted and re-checked
  11. 2021 New Mexico Residential Building Code, quoted and re-checked
  12. Rules, Laws, and Building Codes (New Mexico statewide rule), quoted and re-checked
  13. New Mexico Construction Industries Division — Santa Fe Office (rld.nm.gov)
  14. Construction Industry Frequently Asked Questions, quoted and re-checked
  15. Construction Industries Forms and Applications Fees, quoted and re-checked
  16. El Valle-Tecolote Sub-Area Plan, quoted and re-checked
  17. El Valle-Tecolote Sub-Area Plan, quoted and re-checked
  18. El Valle-Tecolote Sub-Area Plan, quoted and re-checked
  19. El Valle-Tecolote Sub-Area Plan, quoted and re-checked
  20. El Valle-Tecolote Sub-Area Plan, quoted and re-checked
  21. El Valle-Tecolote Sub-Area Plan, quoted and re-checked
  22. Planning and Zoning (2026 county census)
  23. Construction Industry Frequently Asked Questions, quoted and re-checked
  24. Apply for a Permit, quoted and re-checked
  25. Homeowners Information, quoted and re-checked
  26. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  27. 14.12.9 NMAC — Inspections (New Mexico statewide rule), quoted and re-checked
  28. San Miguel County Document Center, quoted and re-checked
  29. 14.5.2 NMAC Permits, quoted and re-checked
  30. Building Permit Guide for Residential Construction (New Mexico statewide rule), quoted and re-checked
  31. San Miguel County Document Center, quoted and re-checked
  32. Share of years in severe drought: Bolthole Index county data
  33. Annual precipitation: Bolthole Index county data
  34. Federal land share: Bolthole Index county data

Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, San Miguel County requires a building permit for a home.

RuleSan Miguel CountyMora CountyGuadalupe CountyHarding CountySanta Fe CountyColfax CountyQuay County
Building permitRequiredRequiredRequiredRequiredRequiredRequiredRequired
County zoningYesYesNot publishedNot publishedYesYesNo
Septic permitsNM Env. Dept.NM Env. Dept.NM Env. Dept.NM Env. Dept.NM Env. Dept.NM Env. Dept.NM Env. Dept.

County locator

San Miguel County in New Mexico

52
County map
San Miguel County highlighted among the New Mexico counties · colored by Index score

How San Miguel County scores

Seclusion89100% ev.
Self-Sufficiency36100% ev.
Admin Boringness45100% ev.
Durability32100% ev.
Property Autonomy38100% ev.
Carry Cost83100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$259kTypical home
0.6%Property tax
$836Land / acre
16.6"Annual rain
43.9% of yrsSevere drought
9.9 / yr (+8.3)Mid-century 100°F days
31.3 daysMid-century dry spell
1.07" (+2.3%)Mid-century 1-day rain
1.25×Wildfire change factor
100%Forward climate coverage
$2,195Home insurance / yr
-1.1% / yrInsurance growth
1.34%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
321Radius comparison (15 mi)
5.6People / sq mi
13.9%Federal land
64.2%Land at 15% slope or less
10.7%Soils rated "not limited" for septic (strict USDA rating)
314,477 acWorkable land screen
26%Wooded land
13.9 tonsBiomass / forest ac
53.5°FAvg temp

Scout San Miguel County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for San Miguel County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in San Miguel County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Not yet researched: Village of Pecos

Answers from the rulebook for San Miguel County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

San Miguel County rules

  • County-wide zoningPresent (with conditions)

    Land-use and zoning-development permitting in unincorporated San Miguel County.

    • The county page limits the stated mission to unincorporated areas.
    • Specific dimensional standards and district controls were not established from the opened pages.
    “To serve in the best interest of the public's health, safety and general welfare of the residents within the unincorporated areas of San Miguel County by assuring for the orderly, harmonious and planned development of the lands. [...] Zoning Development Permits: Administering development regulations.”
    One more reviewed finding on this topic
    • Present — County land-use and zoning-development regulation in unincorporated San Miguel County.
      “To serve in the best interest of the public's health, safety and general welfare of the residents within the unincorporated areas of San Miguel County by assuring for the orderly, harmonious and planned development of the lands. [...] Zoning Development Permits: Administering development regulations.”
  • Local zoningPresent (with conditions)

    San Miguel County land-use planning, code enforcement, floodplain development regulation, and zoning development permits in unincorporated areas.

    • This claim does not represent municipal zoning within incorporated places.
    “Zoning Development Permits: Administering development regulations.”
  • Zoning districtsPublished (with conditions)

    County zoning and land-development district materials for unincorporated San Miguel County.

    • The county document center lists a Zoning Map and Land Development Standards Ordinance; the map and ordinance text were not opened to determine district names or dimensional controls.
    “Land Development Standards Ordinance 86-2 [...] Zoning Map”
  • Minimum lot sizeSpecified

    A2 subarea zoning district identified in San Miguel County’s El Valle-Tecolote land-use plan.

    • The plan states one dwelling unit per parcel and one mobile home for a family member up to four years.
    • The New Mexico Environment Department generally requires a minimum of three-fourths acre for septic systems, according to the plan.

    minimum lot size: 2 acres · dwelling units: 1 per parcel · mobile home duration for family member: <= 4 years

    “A2: purpose to preserve the scenic and recreational values, safeguard water supply, open and spacious development in areas remote from available public services, 2-acre minimum lot size, 1 dwelling unit per parcel and 1 MH for family member up to 4 years, 20 foot front setback, 10 foot side yards”
    3 more reviewed findings on this topic
    • Specified — A1 subarea zoning district identified in San Miguel County’s El Valle-Tecolote land-use plan.
      “A1:1-acre minimum lot size, can have mobile home for family member in addition to a site-built house or mobile home, 20 foot front setback, 10 foot side yards”
    • Specified — TC subarea zoning district identified in San Miguel County’s El Valle-Tecolote land-use plan.
      “TC: purpose to encourage adequate planning without negating traditional life styles, cultural historic districts - potential for historic preservation, half acre minimum lot size”
    • Specified — RH subarea zoning district identified in San Miguel County’s El Valle-Tecolote land-use plan.
      “RH: purpose to permit lower density in residential agricultural areas and maintain large farms and ranches, 5-acre minimum lot size”
  • SetbacksDistrict specific (with conditions)

    A2 subarea zoning district identified in San Miguel County’s El Valle-Tecolote land-use plan.

    • The plan describes A2 as preserving scenic and recreational values, safeguarding water supply, and providing open and spacious development in areas remote from available public services.
    • The plan states one dwelling unit per parcel and one mobile home for a family member up to four years.
    • The stated setback is a 20-foot front setback and 10-foot side yards.

    front setback: 20 feet · side yard setback: 10 feet · mobile home duration for family member: <= 4 years

    “A2: purpose to preserve the scenic and recreational values, safeguard water supply, open and spacious development in areas remote from available public services, 2-acre minimum lot size, 1 dwelling unit per parcel and 1 MH for family member up to 4 years, 20 foot front setback, 10 foot side yards”
    One more reviewed finding on this topic
    • District specific (with conditions) — A1 subarea zoning district identified in San Miguel County’s El Valle-Tecolote land-use plan.
      “A1:1-acre minimum lot size, can have mobile home for family member in addition to a site-built house or mobile home, 20 foot front setback, 10 foot side yards”
  • Subdividing landRegulated (with conditions)

    Subdivision regulation in unincorporated San Miguel County.

    • The county document center lists a Subdivision Regulations Ordinance; the specific substantive standards and exceptions were not verified because the ordinance PDF could not be opened.
    “Subdivision Regulations Ordinance SMC-06-25-96-ORD”
    One more reviewed finding on this topic
    • Regulated (with conditions) — Subdivision regulation in San Miguel County's planning and zoning document set.
      “Subdivision Regulations Ordinance SMC-06-25-96-ORD”

New Mexico rules that apply here

  • Building permitRequired

    Buildings and structures regulated by the New Mexico Residential Code, including residential construction, alterations, repairs, additions, moves, improvements, removals, conversions, and demolitions, and state-administered commercial construction.

    • A permit must be obtained before covered work begins.
    • Residential exceptions include one-story detached accessory buildings used as tool or storage sheds, playhouses, and similar uses not exceeding 120 square feet; fences not over 6 feet high; specified retaining walls; certain water tanks, sidewalks, driveways, finish work, shallow prefabricated pools, playground equipment, window awnings, and detached decks.
    • Unless otherwise exempted, separate plumbing, electrical, and mechanical permits may still be required for otherwise exempted residential work.
    • Commercial applicants must be validly licensed with the appropriate license classification, submit the state building permit application, obtain any required city or county zoning approval, and pay the valuation-based fee before permit issuance.

    residential accessory-building exemption floor area: <= 120 square feet (One-story detached accessory buildings used as tool and storage sheds, playhouses, and similar uses.) · fence exemption height: <= 6 feet · water-tank exemption capacity: <= 5000 gallons (Height-to-diameter or width ratio must not exceed 2:1.) · detached-deck exemption area: <= 200 square feet (Deck must not be more than 30 inches above grade, must not be attached to a dwelling, and must not serve the required exit door.)

    “Except as specified in Section 105.2 IRC, no building or structure regulated by this code shall be erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted, or demolished unless a permit has first been obtained from the building official.”
  • Owner-builder exemptionConditional

    A New Mexico property owner constructing or altering the owner’s single-family primary residence, including permitted appurtenant structures, under a homeowner’s permit.

    • The exemption is limited to construction or alteration of the owner’s primary residence; other use cancels the current permit and can result in denial of later homeowner permits.
    • The homeowner must comply with CILA, NMAC rules, applicable standards and codes, and may act as the general contractor only when the major portion of the work, based on dollar amount, is completed by the homeowner.
    • A permit is required for all construction-related work for which a permit is required by statute or rule; the rule does not exempt the owner-builder from state permitting or inspections.
    • Homeowner permits are limited to single-family dwellings and appurtenant structures such as private garages, carports and sheds, require proof of ownership, and are subject to AHJ approval.
    • The application requires an AHJ-approved application, signed and notarized responsibility sheet, acknowledgement of the homeowner-permit instructions, local zoning approval, floodplain determination, proof of identity and ownership, and payment of required fees.
    • Separate homeowner permits may be issued for general building construction, mechanical/plumbing and electrical work; each is limited to the primary residence and does not apply to rental property, other owned property, or commercial work or property.
    • The homeowner is responsible for requesting inspections, correcting code violations, and requesting re-inspections for a certificate of occupancy or final inspection. Subcontractors remain responsible for permits, inspections and corrections for plumbing, mechanical and electrical work they perform.
    • The homeowner may perform authorized work personally or with W-2 employees, or subcontract part of the work while self-performing a significant portion. Subcontracted work must be performed by licensed contractors who obtain their own permits and pass required inspections.
    • A homeowner permit is invalid for a project managed, supervised or acted on as general contractor by a GB-2 or GB-98 contractor; that contractor must obtain the appropriate permits and assumes responsibility for the site work.
    • Single-scope projects such as roofing or window installation are ineligible when subcontracted and not performed by the homeowner or valid W-2 employees.
    • Plumbing requires sufficient knowledge as determined by the TBC or CBO; a written examination with a minimum passing score of 75% may be required, failed examinations may not be repeated sooner than 30 days, and permitted plumbing work must be performed by the permittee.
    • Electrical work requires approved plans or drawings and a CID homeowner electrical exam with a minimum passing score of 75%; failed examinations may not be repeated sooner than 30 days, and permitted electrical work must be performed by the permittee.
    • A homeowner permit may not be issued for HVAC, natural gas or LP gas installations. HVAC and natural-gas work requires a properly licensed contractor and AHJ permitting and inspection; LP-gas work requires a properly licensed contractor and permitting and inspection through the LP gas trade bureau.
    • A homeowner-permit project may not be placed on the market for sale while under construction; doing so automatically voids the permit and may lead to unlicensed-contracting charges.
    • No more than one homeowner permit for a single-family dwelling may be issued to the same property owner within any 12-month period.
    • The cited rule section states an adoption/replacement date of March 10, 2022.

    homeowner electrical exam minimum passing score: >= 75 percent (Required after plan approval for issuance of a homeowner electrical permit.) · homeowner plumbing exam minimum passing score: >= 75 percent (The TBC or CBO may require the written examination.) · failed homeowner exam retest interval: >= 30 days (Failed plumbing and electrical examinations may not be repeated sooner.) · homeowner permits per single-family dwelling and property owner: <= 1 per 12 months

    “A homeowner permit allows homeowners to obtain permits for constructing or altering their primary residence without becoming a licensed contractor is strictly limited to construction and alteration of their primary residence. Any other use of a homeowner’s permit shall result in cancellation of the current homeowner permit and denial of any subsequent request for a homeowner permit. The homeowner licensing exemption requires conformity with CILA, its rules, standards and codes. This includes a homeowner acting as a general contractor for the project. The homeowner’s permit authorizes the homeowner to physically perform the work, alone or with legal employees, or act as a general contractor and subcontract portions of the work to licensed contractors. In order to qualify for the homeowner permit the major portion of the work to be performed, based on dollar amount, must be completed by the homeowner. A homeowner’s permit may only be issued to a property owner and only for the property owner’s primary residence occupied or intended to be occupied by the homeowner.”
    One more reviewed finding on this topic
    • Available (with conditions) — A homeowner building or altering the homeowner’s primary residence in San Miguel County under New Mexico’s statewide permitting rules.
      “A homeowner permit allows homeowners to obtain permits for constructing or altering their primary residence without becoming a licensed contractor is strictly limited to construction and alteration of their primary residence.”
  • Building code adoptedAdopted (with conditions)

    Commercial construction, alteration, relocation, enlargement, replacement, repair, equipment, use and occupancy, location, removal, and demolition of buildings or structures in New Mexico subject to the jurisdiction of the Construction Industries Division.

    • The 2021 New Mexico Commercial Building Code applies on or after July 14, 2023.
    • The rule does not apply when performed pursuant to a permit for which an application was received by CID before July 14, 2023.
    • Detached one- and two-family dwellings and multiple single-family dwellings (townhouses) not more than three stories high with separate means of egress, and their accessory structures, must comply with the 2021 New Mexico Residential Building Code instead.
    • Existing buildings not subject to the residential code undergoing a change of occupancy, repair, alteration, or addition must comply with either the commercial building code or the existing building code, as applicable.
    • The rule adopts the 2021 International Building Code by reference, as amended by the rule.

    effective date: 2023-07-14 (unless a later date is cited at the end of a section) · adopted reference code: 2021 International Building Code (as amended by 14.7.2 NMAC)

    “14.7.2.5 EFFECTIVE DATE: July, 14, 2023, unless a later date is cited at the end of a section. [...] 14.7.2.8 ADOPTION OF THE 2021 INTERNATIONAL BUILDING CODE: A. This rule adopts by reference the 2021 International Building Code, as amended by this rule.”
    3 more reviewed findings on this topic
    • Adopted (with conditions) — Construction subject to the New Mexico Construction Industries Division, including residential and commercial construction in San Miguel County.
      “This code shall be known as the 2021 New Mexico Commercial Building Code (NMCBC).”
    • Adopted (with conditions) — Detached one- and two-family dwellings, multiple single-family dwellings (townhouses) not more than three stories high with separate means of egress, and their accessory structures in New Mexico subject to the jurisdiction of the Construction Industries Division.
      “14.7.3.5 EFFECTIVE DATE: July 14, 2023, unless a later date is cited at the end of a section. From the date of publication of this rule in the New Mexico register, until December 14, 2023, permits may be issued under either the previously adopted rule, or this rule. After December 14, 2023, permits may be issued only under this rule. [...] A. This rule adopts by reference the 2021 International Residential Code, as amended by this rule.”
    • Adopted — Residential construction in New Mexico subject to the jurisdiction of the Construction Industries Division, including detached one- and two-family dwellings, qualifying townhouses, and their accessory structures.
      “This rule adopts by reference the 2021 International Residential Code, as amended by this rule.”
  • InspectionsRequired

    State-administered residential and commercial construction requiring building permits.

    • Residential inspections include foundation, concrete slab or under-floor, frame, weather-resistive barrier, and final inspection.
    • Final electrical, plumbing, and mechanical inspections must occur before the final general construction inspection.
    • The building official or Construction Inspector may require additional inspections to establish compliance with the New Mexico Building Code and other enforced laws.
    • Inspection requests require the permit number, inspection type, requestor contact information, and confirmation that work is complete and the permit is affixed near the front exterior door.
    “REQUIRED INSPECTIONS To request an inspection e-mail us at CID.lnspection@state.nm.us or call 505-222-9813 or 877-243-0979”
  • Building heightSpecified

    Detached one- and two-family dwellings, multiple single-family dwellings (townhouses) with separate means of egress, and their accessory structures subject to the New Mexico Construction Industries Division residential code.

    • The cited residential code applies to construction performed in New Mexico on or after December 14, 2023.
    • The construction must be subject to the jurisdiction of the Construction Industries Division.
    • The code scope is limited to dwellings and townhouses not more than three stories high; construction outside the NMRBC scope may be subject to the New Mexico Commercial Building Code.
    • The rule states an effective date of July 14, 2023, with permits issuable under either rule until December 14, 2023, and only under the new rule after December 14, 2023.

    maximum stories within NMRBC scope: <= 3 stories (The provision describes the scope of the residential code and is not a general zoning-height limit for every land use.)

    “dwellings and multiple single-family dwellings (townhouses) not more than three stories high with separate means of egress”
  • Tiny homesAllowed (with conditions)

    Tiny houses used as single dwelling units with complete independent living facilities and placed on a permanent foundation statewide in New Mexico.

    • The unit must provide permanent provisions for living, sleeping, eating, cooking, and sanitation.
    • The tiny house must comply with the New Mexico Residential Code and Appendix AQ.
    • Tiny houses constructed in New Mexico or transported into New Mexico must be inspected for compliance with New Mexico Residential Code requirements.
    • A tiny house on a chassis with a permanent axle is treated as a recreational vehicle and must meet recreational-vehicle codes and licensing requirements while the axle remains in place.
    • If axles are removed and the unit is placed on supports or a foundation, it must comply with the code requirements for tiny houses on a permanent foundation.
    • The rule applies to construction, use, and occupancy subject to the jurisdiction of the Construction Industries Division; construction not addressed in the residential code must comply with the New Mexico Commercial Building Code.

    maximum floor area excluding lofts: <= 400 square feet (The definition excludes loft area and excludes recreational vehicles.) · minimum habitable-space and hallway ceiling height: >= 6 feet 8 inches (Loft ceiling heights may be lower.) · minimum bathroom, toilet-room, and kitchen ceiling height: >= 6 feet 4 inches (None stated in the cited passage.)

    “This appendix shall be applicable to tiny houses used as single dwelling units providing complete independent living facilities for one or more persons”
  • Manufactured homesAllowed (with conditions)

    Installation and resulting residential use and occupancy of new or pre-owned manufactured homes statewide in New Mexico, subject to the Manufactured Housing Division's permitting and inspection rules.

    • An installation permit or combined installation and permanent-foundation inspection permit must be obtained before installation.
    • The permit must identify the licensees performing installation work and the consumer's name and address; a map is required when the address is a post-office box or rural route.
    • An unlicensed homeowner working on the homeowner's own principal residential property must perform the work personally or use division-approved licensees, execute the required acknowledgment, and assume responsibility for applicable federal, state, local, code, and inspection requirements.
    • Final inspection must certify that the manufactured home meets the minimum standards for use and occupancy under the act and regulations.
    • Permits are valid for 180 days, subject to possible time extension for weather or re-manufacturing or permanent-foundation inspections.
    • Each new or pre-owned manufactured home installed in New Mexico requires an installation permit.
    • Failure to obtain a permit subjects the homeowner, dealer, or installer to a fine of double the permit fee.
    • Local requirements, codes, and inspections still apply; the cited state rule does not establish local land-use placement or zoning permission.

    installation permit validity: 180 days (A time extension may be granted for weather-related delay or inspections involving a home being re-manufactured or installed on a permanent foundation.) · permit for certain alteration, modification, or repair: 15 USD (Available upon written request and excludes warranty work performed under a previous permit and installation.) · fine for installation without permit: double the permit fee (Applies to the homeowner, dealer, or installer.)

    “inspectors shall certify on the permit, or upon any inspection report, that the manufactured home meets the minimum standards for use and occupancy”
  • Who permits septicState

    On-site liquid waste systems and effluent receiving 5,000 gallons or less per day and not requiring a discharge plan or NPDES permit.

    • 20.7.3 NMAC identifies the New Mexico Environmental Improvement Board as the issuing agency and defines the department as the New Mexico Environment Department.
    • More stringent city or county requirements may also apply.

    maximum regulated flow: <= 5000 gallons per day (Systems requiring a discharge plan under 20.6.2 NMAC or an NPDES permit are outside this part.)

    “20.7.3.1 ISSUING AGENCY: New Mexico Environmental Improvement Board.”
    2 more reviewed findings on this topic
    • State — Onsite liquid-waste permitting, inspection, and fee administration applicable in San Miguel County.
      “liquid waste, including exclusive authority to establish on-site liquid waste system fees and to implement and administer an inspection and permitting program for on-site liquid waste systems;”
    • State (with conditions) — On-site liquid-waste systems in San Miguel County.
      “Submit to Local NMED Field Office for review [...] NMED will notify applicant of actions taken on the permit application. [...] Request Inspection by NMED 48 hours (2 business days) in advance (DO NOT COVER BEFORE INSPECTION)”
  • Septic permitRequired

    Installation or modification of a new or existing on-site liquid waste system, including residential or commercial units on lots for which such a system is required.

    • A permit issued by the New Mexico Environment Department, including payment of the permit fee, is required before construction or modification.
    • A permit is not required for graywater discharges or systems meeting 20.7.3.810 NMAC.
    • A dwelling may not be constructed, modified, or transported onto a lot requiring an on-site liquid waste system unless the department has issued the permit beforehand.
    • Other state, city, county, or federal approvals may also be required.
    • The department generally acts within 10 working days after a completed conventional-system application, subject to the rule's extension for potentially more stringent requirements.

    maximum regulated flow: <= 5000 gallons per day (20.7.3.2 NMAC scope limitation) · permit application completeness determination: 5 working days (Conventional systems) · conventional permit decision: 10 working days (After receipt of a completed application; review may extend to 20 working days when more stringent requirements may be necessary)

    “No person shall install or have installed a new on-site liquid waste system or modify or have modified an existing on-site liquid waste system, unless that person obtains a permit issued by the department, including payment of the permit fee, prior to construction of such installation or modification.”
    2 more reviewed findings on this topic
    • Required — Onsite liquid-waste systems in San Miguel County.
      “Request Inspection by NMED 48 hours (2 business days) in advance (DO NOT COVER BEFORE INSPECTION)”
    • Required — Installation, registration, or modification of an onsite liquid-waste system serving property in San Miguel County.
      “Application – Print and fill out an Application for Liquid Waste Permit, Section 20.7.3.401 NMAC [...] Pay for Permit only after you are contacted by NMED to inform you that your permit was approved or approved with conditions. DO NOT SUBMIT PAYMENT BEFORE NOTICE OF APPROVAL.”
  • Septic inspectionRequired

    Homeowner installation of a conventional on-site liquid waste system at the homeowner's personal residence in San Miguel County and elsewhere in New Mexico.

    • The permit to construct may require multiple inspections, including inspections before setting the tank, when setting the tank, before placing gravel or product in the disposal system, and before placing pipe in the trench.
    • A final inspection is required before covering the system.
    • All homeowner installations require an NMED final inspection.
    • Inspection times must be scheduled with the local NMED field office two or three days in advance.
    • A qualified homeowner cannot install or modify a system serving a rental unit or other property that is not the homeowner's personal residence.
    • A qualified homeowner may install no more than one liquid waste system during a twelve-month period.
    • The homeowner must qualify by passing the department's exam; qualification is valid for twelve months, and the permit to construct is issued after approval and payment of the applicable fees.

    homeowner qualification exam passing score: >= 75 percent · homeowner qualification validity: 12 months (the page states the period expires on the anniversary month's last day) · homeowner installation inspection scheduling lead time: two or three days · homeowner liquid waste permit or registration fee: 395 USD (the page states this total includes a $170 homeowner qualification application and a $225 permit or registration application for systems of 1,000 gpd or less)

    “All Homeowner installations require an NMED final inspection.”
    2 more reviewed findings on this topic
    • Required — NMED inspection of onsite liquid-waste system installation in San Miguel County.
      “Request Inspection by NMED 48 hours (2 business days) in advance (DO NOT COVER BEFORE INSPECTION) [...] After Approved Inspection you will receive a copy of the Permit to Operate”
    • Limited — Property transfers involving property with an established on-site liquid waste system, subject to the applicable local exception for unincorporated Bernalillo County.
      “Prior to the transfer of a property with an established on-site liquid waste system, the transferor of the property shall have the system evaluated. Liquid waste systems shall be evaluated by an evaluator qualified in accordance with Subsection B of 20.7.3.904 NMAC utilizing a department approved form.”
  • Off-grid sanitationLimited

    Privies, permitted on-site liquid waste systems, and qualifying private residential graywater discharges statewide.

    • A privy may dispose of human excreta and toilet paper but not other liquid wastes.
    • Untreated liquid waste must go to a permitted and approved enclosed system, permitted and approved treatment unit, or public sewer, except qualifying graywater.
    • Graywater under 250 gallons per day may be used for household gardening, composting, or landscaping irrigation only if all listed conditions are met, including no runoff, no spraying, no watercourse discharge, floodway exclusion, five-foot groundwater separation, local ordinance compliance, 24-hour storage limit, and specified well setbacks.
    • Graywater use for purposes other than irrigation or composting requires a department permit.

    private residential graywater discharge: < 250 gallons per day (Qualifying graywater discharge under 20.7.3.810 NMAC) · graywater setback from private domestic well: >= 100 feet · graywater setback from public water supply well: >= 200 feet · graywater storage before discharge: <= 24 hours

    “A privy may be used for the disposal of human excreta and toilet paper, but not for the disposal of other liquid wastes.”
  • Mandatory utility hookupConditional

    Residential and commercial units using an on-site liquid waste system when a public sewer is available and connection is required by the local authority with jurisdiction.

    • A public sewer is deemed available when it has capacity and is located in a thoroughfare, right-of-way, or easement abutting the lot.
    • The on-site system must be properly abandoned within 30 days after connection.
    • The state rule does not itself identify which local authority will require connection.

    abandonment deadline after sewer connection: 30 days

    “All residential and commercial units utilizing an on-site liquid waste system shall connect to a public sewer upon availability and if required in accordance with the local authority that has jurisdiction.”
    One more reviewed finding on this topic
    • Conditional — Connections of utilities or energy, fuel, or power to buildings or systems regulated by New Mexico construction codes.
      “No person shall make connections from a utility, source of energy, fuel or power to any building or system that is regulated by the New Mexico construction codes until approved by the appropriate AHJ.”
  • Agricultural exemptionConditional

    Statewide agricultural exemption from the New Mexico Subdivision Act for the sale, lease, or other conveyance of a parcel of at least 35 acres.

    • The parcel must be thirty-five acres or larger.
    • The conveyance must occur within a twelve-month period covered by the statutory exception.
    • The land must have been used primarily and continuously for agricultural purposes, in accordance with Section 7-36-20 NMSA 1978, for the preceding three years.

    minimum parcel size: >= 35 acres · agricultural use duration: >= 3 years (land must have been used primarily and continuously for agricultural purposes in accordance with Section 7-36-20 NMSA 1978) · conveyance period: 12 months (within any twelve-month period)

    “the sale, lease or other conveyance of any parcel that is thirty-five acres or larger in size within any twelve-month period; provided that the land has been used primarily and continuously for agricultural purposes, in accordance with Section 7-36-20 NMSA 1978, for the preceding three years;”
    2 more reviewed findings on this topic
    • Conditional — New Mexico contractor licensing requirements for earthmoving, excavating, and ditching activities used in preparation or production of agriculture or maintenance of livestock on a farm or ranch.
      “earthmoving, excavating and ditching activities applicable to the preparation and production of agriculture or maintenance of livestock on a farm or ranch are exempt from licensing requirements.”
    • Conditional — Agricultural land divisions and conveyances that would otherwise fall within the New Mexico Subdivision Act definition.
      “provided that the land has been used primarily and continuously for agricultural purposes, in accordance with Section 7-36-20 NMSA 1978”
  • Driveway accessRequired

    Permanent or temporary direct vehicular access from property in close proximity to or adjoining a New Mexico state highway.

    • An access permit must be issued by the New Mexico Department of Transportation before constructing or modifying covered access.
    • Access permits are issued only when the application complies with 18.31.6 NMAC.
    • The department or an approved issuing authority may impose terms and conditions.
    • The rule concerns state highways under the jurisdiction of the state transportation commission; it does not establish a universal permit requirement for every non-state roadway.
    • For additional traffic from expansion or redevelopment, the property owner must contact the department to determine whether a new application or access modification is required; no new application is required if the department determines modifications are unnecessary.
    “no person shall construct or modify any permanent or temporary access [...] without an access permit issued by the New Mexico department of transportation.”
  • Building in a floodplainRequired

    Construction or development within a FEMA Special Flood Hazard Area in a New Mexico community, and proposed construction or other development in communities where FEMA has not defined a Special Flood Hazard Area.

    • Approval by the local community Floodplain Administrator is required before construction or development within any Special Flood Hazard Area.
    • Where FEMA has not defined the Special Flood Hazard Area, the community must require permits for all proposed construction or other development, including manufactured homes, to determine whether the activity is in a flood-prone area.
    • Approval is intended to ensure compliance with the National Flood Insurance Program and the community’s floodplain management ordinance.
    • The source identifies 104 New Mexico communities participating in the National Flood Insurance Program; the administering official is the applicable local community Floodplain Administrator, not the state agency.
    “Approval by the local community Floodplain Administrator is required before construction or development begins within any Special Flood Hazard Area.”
  • Permit feesVariable (with conditions)

    General building permit fees administered by the New Mexico Construction Industries Division, including applicable projects in San Miguel County outside incorporated municipalities.

    • Fees vary according to type of construction, square footage, type of materials, and construction costs.
    • Applicants should contact a CID office to obtain the applicable permitting fee.

    fee basis: type of construction, square footage, type of materials, and construction costs

    “Permitting Fees are based upon type of construction, square footage, type of materials and construction costs. The best method of obtaining permitting fees is to contact any of CID’s three offices at:”
    One more reviewed finding on this topic
    • Variable (with conditions) — New Mexico Construction Industries Division permitting fees for covered construction work statewide.
      “Permitting Fees are based upon type of construction, square footage, type of materials and construction costs.”
  • Permit processPublished (with conditions)

    CID homeowner building-permit process applicable in San Miguel County where CID is the permitting authority.

    • Planning and zoning approval, two complete sets of plans, a completed Multi-Purpose State Building Application, and payment of the fee are listed as submittal requirements.
    • Residential permits were stated to be processed in three to four working days; commercial permits in five to ten working days.

    residential processing time: 3 to 4 working days · commercial processing time: 5 to 10 working days

    “Obtain planning and zoning approval from the county and submit the approval letter with you permit request. [...] Two (2) complete sets of plans at a recommended minimum scale of ¼ inch = 1 foot, and provide the required information listed on the Permit Guide for Residential Construction. [...] Submit the completed Multi-Purpose State Building Application. [...] Submit the building permit fee, which CID will provide as soon as you let us know what the total cost of the project is going to be.”
    2 more reviewed findings on this topic
    • Published (with conditions) — New Mexico CID building-permit submissions and NMED onsite liquid-waste permitting affecting San Miguel County.
      “NMED will notify applicant of actions taken on the permit application. Actions may included granting the permit, granting with conditions, or denial.”
    • Published (with conditions) — Construction Industries Division permit applications in New Mexico.
      “Permits can also be completed using our online permitting portal.”
  • county zoning authorityGeneral

    New Mexico counties adopting zoning for all or part of unincorporated territory outside municipal zoning jurisdiction.

    • A county zoning ordinance may apply only to territory not within the zoning jurisdiction of a municipality.
    • Municipalities may have concurrent extraterritorial zoning authority in specified areas, including areas near municipalities meeting statutory population thresholds and additional contiguous territory placed under municipal extraterritorial jurisdiction by county-municipal agreement.
    • Concurrent extraterritorial authority is exercised under an extraterritorial zoning authority or joint powers agreement and may be exercised regardless of whether the county has enacted a comprehensive zoning ordinance.
    • If no county zoning ordinance exists, qualified electors may petition for adoption; the petition must equal at least twenty-five percent of the votes cast for governor at the last preceding general election, and the board of county commissioners must adopt a county zoning ordinance within one year.

    minimum petition threshold: >= 25 percent of votes cast for governor at the last preceding general election · county ordinance adoption deadline after qualifying petition: 1 year

    “a county zoning authority may adopt a zoning ordinance applicable to all or any portion of the territory within the county that is not within the zoning jurisdiction of a municipality;”
    One more reviewed finding on this topic
    • General — New Mexico counties may adopt zoning ordinances for all or any portion of county territory that is not within a municipality's zoning jurisdiction.
      “A.  a county zoning authority may adopt a zoning ordinance applicable to all or any portion of the territory within the county that is not within the zoning jurisdiction of a municipality;”
  • county building authorityGeneral

    New Mexico counties that establish and maintain a building department for permitting and inspections of general construction, mechanical-plumbing, and electrical work, including residential construction in unincorporated areas.

    • CID retains statewide permitting and inspection authority unless a county, municipality, or political subdivision has a current building department providing permitting and inspections.
    • To establish and maintain a building department, the county must establish a full-service building department covering general construction, mechanical-plumbing, and electrical trades; employ a full-time certified building official; and employ sufficient CID-certified inspectors for each trade.
    • The county authority does not include liquefied petroleum work, over which CID has exclusive authority.
    • CID conducts all inspections if the county lacks a certified building official.
    • If the certified building official leaves, plan review, permitting, and inspections transfer to the state unless the county replaces the official within 60 days or a longer period approved by the division, or enters a memorandum of understanding with another county, municipality, or political subdivision.

    replacement period for certified building official: 60 days (A longer period may be approved by the division.)

    “In order to establish and maintain a building department allowing permitting and inspections the county, municipality or political subdivision must establish a full-service building department including general construction, mechanical-plumbing and electrical trades, must employ a full-time certified building official and employ sufficient CID certified inspectors to inspect for each trade.”
    One more reviewed finding on this topic
    • Limited — New Mexico counties that qualify as an authority having jurisdiction may administer permitting, inspection, and enforcement for residential construction in unincorporated areas and enforce applicable New Mexico construction codes.
      ““Authority having jurisdiction” “AHJ” means the state or a municipality, county or other political subdivision that has a full-service building department employing a full-time certified building official and has permitting, inspection and enforcement authority over the general construction, electrical and mechanical-plumbing trades within its jurisdiction.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Certificate of occupancy — Certificates of occupancy for buildings in unincorporated San Miguel County.
  • Minimum dwelling size — Minimum dwelling size in unincorporated San Miguel County.
  • Lot coverage — Lot coverage in unincorporated San Miguel County.
  • Living in an RV — Long-term RV occupancy on private land in unincorporated San Miguel County.
  • Camping on your land — Temporary camping on private land in unincorporated San Miguel County.
3 more unanswered
  • Accessory dwellings
  • Well permit
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Water rights & wells in San Miguel County

Whether a new home can legally get its own water here — the sub-state groundwater regime, from New Mexico’s water agency.

Over-appropriated / declining

The aquifer here is over-appropriated and declining. A domestic well is usually still permit-exempt, but long-term supply is a genuine risk.

Household wellPermit required (issued by right)

Nearly all developed New Mexico lies inside an OSE 'declared' underground water basin, but a household 72-12-1.1 domestic well is a by-right permit the State Engineer issues even in closed/over-appropriated basins (metering can be required). The by-right amount is cut to 0.25 acre-ft/yr in a declared Domestic Well Management Area, and a few basin-specific orders cap it further (Gallup Order 197, Zuni Order 199) or stop issuing new domestic permits entirely (Hot Springs Order 198).

Limit: 1 acre-ft/yr by right (NMSA 72-12-1.1); 0.25 acre-ft/yr in a declared Domestic Well Management Area

NM OSE domestic well rules, 19.27.5 NMAC ↗
  • Estancia Basinpartial of county

    Valley-fill declines up to ~5 ft/yr with multiple Critical Management Areas; new non-domestic appropriations are rejected and rights cannot be moved into a CMA. A 72-12-1.1 household domestic well is still issued under the statewide rules and basin drawdown limits.

    NM OSE Estancia Basin Guidelines (2021) ↗
  • Tucumcari Underground Water Basinpartial of county

    OSE-declared Article-7 groundwater basin; new non-domestic (72-12-3) appropriations require an OSE permit showing unappropriated water. The 72-12-1.1 household domestic well remains by-right — no Domestic Well Management Area is declared in New Mexico. OSE-declared basin centered on Quay County (Order 155, 1998).

    NM OSE Article 7 (Declared Underground Water Basins) ↗
  • Upper Pecos Underground Water Basinpartial of county

    OSE-declared Article-7 groundwater basin; new non-domestic (72-12-3) appropriations require an OSE permit showing unappropriated water. The 72-12-1.1 household domestic well remains by-right — no Domestic Well Management Area is declared in New Mexico. Upper Pecos drainage, administered under the Pecos River Compact.

    NM OSE Article 7 (Declared Underground Water Basins) ↗
  • Canadian River Underground Water Basinpartial of county

    OSE-declared Article-7 groundwater basin; new non-domestic (72-12-3) appropriations require an OSE permit showing unappropriated water. The 72-12-1.1 household domestic well remains by-right — no Domestic Well Management Area is declared in New Mexico. Canadian River drainage in NE NM (Order 161, 2005), administered under the Canadian River Compact.

    NM OSE Article 7 (Declared Underground Water Basins) ↗

Prior-appropriation state (first in time, first in right). Groundwater rules change and basin boundaries follow the aquifer, not the county line — confirm current well and appropriation rules with the New Mexico state water agency before you buy or drill.Groundwater governance as of Jul 2026, cited to each administering agency.

Living off-grid in San Miguel County, New Mexico

Is San Miguel County a good place to live off-grid or homestead?

San Miguel County scores 52/100 on the Bolthole Index, a solid county profile. Its strengths: deep seclusion — about 321 people within 15 miles and manageable long-term carry cost. Watch-outs: elevated current hazard exposure and thin water margin (16.6″/yr rainfall).

Do you need a building permit in San Miguel County, New Mexico?

San Miguel County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by New Mexico Environment Department (Onsite Wastewater / Liquid Waste Program). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in San Miguel County, New Mexico?

Land in San Miguel County runs about $836 per acre, based on the latest county data.

What is the water situation in San Miguel County?

San Miguel County gets about 16.6" of rain a year, with severe drought in roughly 43.9% of years. On water rights, San Miguel County lies in the Estancia Basin — Valley-fill declines up to ~5 ft/yr with multiple Critical Management Areas; new non-domestic appropriations are rejected and rights cannot be moved into a CMA. A 72-12-1.1 household domestic well is still issued under the statewide rules and basin drawdown limits..

How remote is San Miguel County?

A typical private-land location has about 321 people within 15 miles and 381,470 within 100 miles. These radius catchments are the published fallback where road routing is unavailable.

How San Miguel compares in New Mexico

Compare side-by-side →See all 33 New Mexico counties ranked →