The Village of Akron, New York, in Erie County, requires a building permit from its code enforcement officer before construction, alteration or demolition begins1. The village administers its own zoning under Chapter 1652. Septic systems inside the village are unlawful unless the Erie County Department of Health and the state DEC allow them3.
At a glance
- Building permit
- Required from the village code enforcement officer before work starts1
- Zoning
- Village-run, with residential, business, industrial and land conservation districts24
- Septic
- Allowed only as Erie County Department of Health and DEC permit; county issues the construction permit35
- Public sewer
- New homes must connect where a public sewer is available6
- RV or trailer living
- Sleeping or dwelling in a parked trailer is unlawful in the village except for brief street stops7
- Owner-builder
- New York homeowners acting as their own contractor deal with form BP-1 or workers' compensation proof8
- Permit fees
- Set by the village board's fee schedule; dollar amounts not confirmed9
Who to call
Building permits
Village of Akron (village office)
Main village office; ask here for the code enforcement officer, building permit forms and zoning questions
21 Main Street, Akron, NY 14001
Septic permits
Erie County Department of Health — Division of Environmental Health
Septic (onsite wastewater) construction permits for every address in Erie County, including inside the village
ECDOH Building, 503 Kensington Avenue, Buffalo, NY 14214
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in Village of Akron means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in the Village of Akron, NY?
Yes. Inside the Village of Akron, no one may start work that needs a building permit without first getting one from the code enforcement officer1. The permit covers new construction, enlargement, alteration, removal, relocation and demolition of a building or structure, and installing a solid-fuel heating appliance, chimney or flue in a dwelling1.
The village enforces the New York State Uniform Fire Prevention and Building Code and the state Energy Code through Chapter 71 of its code10. A permit becomes invalid unless work starts within 6 months of issuance1. Statewide, local programs may exempt only listed small items, and a permit exemption never excuses work that violates the code11. Ask the village whether a specific shed or fence falls under an exemption.
New York also requires a certificate of occupancy for work done under a building permit12.
Who issues building permits in Akron, and how do you reach them?
The Village of Akron's own code enforcement officer issues building permits inside village limits, not Erie County1. Applications go to that officer on a form adopted by the village board, with construction documents; the application is not accepted without them13. Call the village office at 716-542-9636 or visit 21 Main Street, Akron, NY 14001 and ask for the code enforcement officer14.
Fees follow the fee schedule the village board adopts, and we could not confirm the dollar amounts, so ask the village office before you budget9. Erie County does not run building permits here: the state Uniform Code is enforced by each city, town and village15.
Does Akron have zoning, and what does it mean for lot use?
Yes. The Village of Akron administers its own zoning ordinance, Chapter 165 of the village code2. Land is divided into R-1 single-family, R-2 two-family, R-3 multifamily, B-1 local business, central business, I-1 limited industrial, I-2 general industrial and land conservation districts2. District lines are drawn on the village zoning map adopted in 19714.
We could not confirm minimum lot size, setbacks, minimum home size, accessory dwellings or tiny home rules for any district, so ask the village office which district your parcel sits in and what it allows before you buy14. Subdividing a lot is regulated under the village's Chapter 142, and we could not confirm its approval steps16. Counties in New York do not have general zoning power, so Erie County cannot answer these questions for you17.
How do septic permits work in the Village of Akron?
The village does not make septic rules. Akron's code makes it unlawful to build or keep a privy, septic tank, cesspool or similar wastewater facility except as the Erie County Department of Health and DEC allow3. For a new home, Erie County requires a licensed design professional to prepare an engineer's report and plans, submitted with an application and a $300 fee18. The Department of Health issues the construction permit once the plans meet its regulations5.
Before a property that uses septic or a private well changes hands in Erie County, a property-transfer certification is required19. Where a public sewer is available, a new home or building used for human occupancy must connect, and owners must connect within 90 days after official notice6. Call the Division of Environmental Health at 716-961-680020.
Can you live in an RV or tiny home in the Village of Akron?
Generally no. Akron's village code makes it unlawful to park or occupy a house trailer or other portable vehicle for dwelling or sleeping purposes, with limited exceptions7. Emergency or temporary stopping on a street, alley or highway is allowed for no more than 1 hour7. A single unoccupied trailer may be kept in a private garage or a rear or side yard in any district, and the village board can order it removed if it becomes objectionable7.
We could not confirm a tiny home or manufactured home rule in the zoning chapter; ask the village office before buying a lot for either14. Statewide, a manufactured home still needs a building permit and a certificate of occupancy21.
Building a home in the Village of Akron: the steps, in order
- Ask the village office which zoning district the parcel is in and what it allows14.
- Check whether a public sewer serves the lot; if so, plan to connect6. If not, start the Erie County Department of Health septic permit, which needs a design professional18.
- Get the building permit application and construction documents requirements from the code enforcement officer13.
- If you act as your own contractor, ask about form BP-1 or workers' compensation proof8.
- Begin work within 6 months of the permit issuing1; keep work exposed until inspected22.
- Obtain the certificate of occupancy before moving in12.
What stays with Erie County, and what to check before you buy in Akron
Septic permits, property-transfer inspections and private wells for addresses in the village stay with the Erie County Department of Health3. For land outside village limits, use the Erie County page instead, because the village's rules end at its boundary.
Before you buy, ask the village whether the lot is in a mapped flood hazard area: new or substantially improved structures there need a local floodplain development permit23. If the lot fronts a state highway, a driveway needs a New York State Department of Transportation permit24. Erie County's effective property tax rate is 2.1%, with a median bill of $4,525 a year2526.
Watch-outs
- We could not confirm the village's minimum lot size, setbacks, accessory dwelling or tiny home rules, so ask the Village of Akron office at 716-542-9636 before you buy14.
- A septic permit from the Erie County Department of Health does not replace the village building permit, and the building permit does not cover septic3.
- Building permit fee amounts are set by the village board's fee schedule and we could not confirm them9.
Sources
- Village of Akron Code, Chapter 71 Building Construction and Fire Prevention, Article I (eCode360) (Village of Akron), quoted and re-checked
- Village of Akron Code, Chapter 165 Zoning, Article VI Districts, § 165-24 Establishment (eCode360) (Village of Akron), quoted and re-checked
- Village of Akron Code, Chapter 122 Sewers, Article II Use of Public Sewer Required (eCode360) (Village of Akron), quoted and re-checked
- Village of Akron Code, Chapter 165 Zoning, table of contents (eCode360) (Village of Akron), quoted and re-checked
- Septic and Onsite Wastewater Systems, quoted and re-checked
- Village of Akron Code, Chapter 122 Sewers, Article II Use of Public Sewer Required (eCode360) (Village of Akron), quoted and re-checked
- Village of Akron Code, Chapter 71 Building Construction and Fire Prevention, Article I (eCode360) (Village of Akron), quoted and re-checked
- Workers’ Compensation Requirements for Government Issued Permits, Licenses and Contracts, quoted and re-checked
- Village of Akron Code, Chapter 71 Building Construction and Fire Prevention, Article I (eCode360) (Village of Akron), quoted and re-checked
- Village of Akron Code, Chapter 71 Building Construction and Fire Prevention, Article I (eCode360) (Village of Akron), quoted and re-checked
- Part 1203 Uniform Code and the Energy Code: Minimum Standards for Administration and Enforcement (New York statewide rule), quoted and re-checked
- Part 1203 Uniform Code and the Energy Code: Minimum Standards for Administration and Enforcement (New York statewide rule), quoted and re-checked
- Village of Akron Code, Chapter 71 Building Construction and Fire Prevention, Article I (eCode360) (Village of Akron), quoted and re-checked
- Village of Akron (village office) (www4.erie.gov)
- Legal Memorandum LG03: NYS Uniform Fire Prevention and Building Code: What Elected Officials Need to Know, quoted and re-checked
- Village of Akron, NY code of ordinances, table of contents (eCode360) (Village of Akron), quoted and re-checked
- documents.dps.ny.gov (New York statewide rule), quoted and re-checked
- Septic and Onsite Wastewater Systems, quoted and re-checked
- Septic and Onsite Wastewater Systems, quoted and re-checked
- Erie County Department of Health — Division of Environmental Health (www3.erie.gov)
- Division of Building Standards and Codes Frequently Asked Questions, quoted and re-checked
- Part 1203 Uniform Code and the Energy Code: Minimum Standards for Administration and Enforcement (New York statewide rule), quoted and re-checked
- Floodplain Management - NYSDEC (New York statewide rule), quoted and re-checked
- Residential Driveway Permits (New York statewide rule), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.