Genesee County, New York requires a building permit for work covered by the state Uniform Code, but the city, town or village where the property lies issues that permit and conducts building inspections123. Zoning is also local, while the county Environmental Health Division issues residential septic construction permits throughout Genesee County45.
At a glance
- Building permit
- Required for work covered by the state codes; the city, town or village issues it13
- Zoning
- Set locally by the city, town or village; the county reviews certain referrals46
- Septic permits
- County Environmental Health issues residential septic construction permits countywide5
- Owner-builder
- A narrow certification path exists for an owner installing a manufactured home they will occupy7
- Septic permit fee
- $175 for a residential onsite wastewater construction-permit application5
- County planning referral fee
- None; the county has warned of a fee-demand phishing scam6
- Septic transfer inspection
- The county performs inspections during property transfers8
Who to call
Building permits
Building permits, inspections, zoning enforcement and property-maintenance code for the City of Batavia; every other town and village in Genesee County has its own separate Code Enforcement Officer
One Batavia City Centre, Batavia, NY 14020
Planning & zoning
Genesee County Planning Department
County-level planning services, GIS/flood maps and County Planning Board review of certain local zoning and subdivision referrals under NYS General Municipal Law sections 239-l, m and n; does not set or enforce local zoning
3837 West Main Street Road, Batavia, NY 14020
Septic permits
Genesee & Orleans County Health Departments (GOHealth), Environmental Health Division
Design review and permitting of onsite wastewater treatment (septic) systems, private water wells, and septic/well inspections at property transfer, for Genesee County
3837 W. Main St. Rd, Batavia, NY 14020
Contact details are copied from each office’s official page and were checked against it on October 10, 2026.
Off-grid gear
Going off-grid in Genesee County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Genesee County, New York?
Yes. The current New York State Uniform Code took effect on December 31, 2025, and applies statewide outside New York City910. A building permit is required for work that must conform to the Uniform Code or Energy Code, although each local enforcement program may keep or omit the state's listed exceptions1. Genesee County does not issue one countywide building permit: the Code Enforcement Officer for the city, town or village containing the parcel handles the building-permit decision and local fee schedule3. Zoning approval is separate and also local, while a residential septic construction permit stays with Genesee County Environmental Health45.
Who issues building permits in Genesee County, and how do you reach them?
Contact the Code Enforcement Officer for the city, town or village where the Genesee County parcel lies3. A building-permit application must give the local code official enough information to determine compliance, including the location, scope, tax-map number, street address, occupancy classification and acceptable construction documents11. As an example only, the City of Batavia Bureau of Inspection handles building permits, building inspections and zoning enforcement inside the city, at One Batavia City Centre, Batavia, NY 14020, 585-345-634512. Do not use that city office for land elsewhere in Genesee County. County Environmental Health still handles residential septic construction permits for addresses throughout Genesee County5. Permit holders must notify the local authority when work is ready and keep it accessible until accepted2.
Does Genesee County have zoning?
Genesee County does not adopt county-level zoning; towns and villages exercise zoning, and the County Planning Board reviews certain local planning actions referred under state law46. The City of Batavia also administers zoning inside the city12. Ask the city, town or village containing the parcel about zoning approval, the zoning district, allowed uses, setbacks, lot size, building height and subdivision review before relying on a purchase or site plan. Genesee County Planning provides municipal planning support and referral review, but it does not replace the municipality's zoning decision64. Septic construction permits remain countywide through Genesee County Environmental Health even when a municipality controls zoning5. The County Planning Board charges no referral-review fee, so verify any payment demand directly with the Planning Department6.
How do septic permits work in Genesee County?
The Genesee & Orleans County Health Departments' Environmental Health Division oversees septic design and permitting throughout Genesee County, including new systems, repairs and replacements1314. A residential onsite wastewater treatment system requires a county septic construction permit, and the application must include a $175 check or money order payable to the Genesee County Health Department5. Environmental Health also performs septic inspections during property transfers8. Only about 12% of Genesee County soils are rated without severe limits for a conventional drain field, so arrange the site evaluation before committing to a house location or system budget15. This county role does not move to the city, town or village that issues the building permit or zoning approval534. Reach Environmental Health at (585) 344-2580 or health@geneseeny.gov14.
Can you live in an RV or tiny home on your land in Genesee County?
We could not confirm a countywide rule allowing long-term RV occupancy, temporary camping or tiny-home occupancy in Genesee County. Ask the city, town or village that controls the parcel about allowed uses, placement and occupancy before buying or moving a unit onto the land4. For work requiring a building permit, the local authority must inspect the completed work and issue a certificate of occupancy or compliance before occupancy; a use or occupancy-classification change also requires a certificate16. A person who will own and occupy a manufactured home may apply for installer certification, but homeowner-performed installation components must be supervised and certified by a certified installer17. That narrow installer path does not replace a municipal building permit, local zoning approval or a county septic construction permit345.
Building a home in Genesee County: the steps, in order
- Identify the city, town or village containing the parcel and ask its Code Enforcement Officer about zoning approval, building-permit documents and local fees34.
- Confirm the allowed use and dimensional rules, then determine which project work requires a building permit1.
- Contact County Environmental Health at (585) 344-2580 before fixing the house and septic locations1314.
- Submit the local building-permit application with enough information for code review, and submit the separate county septic construction-permit application with its $175 payment115.
- Notify the municipality when work is ready and keep it accessible for required building inspections2.
- Obtain the municipality's certificate of occupancy or compliance before occupying completed permitted work18.
What to check before you buy land in Genesee County
Only about 12% of Genesee County soils are rated without severe limits for a conventional septic drain field, so obtain Environmental Health's site guidance before assuming a standard system will fit1514. Check public-water eligibility early: development inside a Smart Growth Development Area has access, Agricultural District land may face lateral restrictions, and new development outside the boundary is not automatically eligible for a hookup but can receive case-by-case review19. Agricultural District enrollment can provide protection from nuisance claims and certain local regulations, but it does not create a blanket building-permit exemption20. Ask the municipality about zoning approval; we could not confirm countywide driveway-access or floodplain-development permit rules, so also ask which road authority and floodplain official cover the parcel4. The median property-tax bill is about $3,958 per year, with an effective rate near 2.5%2122.
Watch-outs
- Genesee County warns that scammers have emailed Planning Board applicants demanding review or approval fees; the county does not charge for Planning Board referrals, so confirm any demand with the Planning Department at (585) 815-79016.
- Building permits, building inspections and zoning approval depend on the city, town or village, but residential septic construction permits remain with Genesee County Environmental Health345.
- Only about 12% of Genesee County's soils are rated without severe limits for a conventional septic drain field; budget for a site evaluation and a possible engineered system before you count on a standard drain field1514.
Sources
- Administration and Enforcement of the Uniform Code, quoted and re-checked
- Administration and Enforcement of the Uniform Code, quoted and re-checked
- City of Batavia (Genesee County, NY) Code - Building Permits (2026 county census)
- Genesee County, New York - Planning (2026 county census)
- Application for Residential Onsite Wastewater Treatment System Construction Permit, quoted and re-checked
- Genesee County Planning Department (geneseeny.gov)
- dos.ny.gov, quoted and re-checked
- Environmental Health, quoted and re-checked
- Legal Memorandum LG03: NYS Uniform Fire Prevention and Building Code, quoted and re-checked
- NYS Uniform Fire Prevention and Building Code: What Elected and Other Government Officials Need to Know, quoted and re-checked
- Administration and Enforcement of the Uniform Code, quoted and re-checked
- City of Batavia Bureau of Inspection (example municipality; contact your own town, village or city instead) (batavianewyork.com)
- Environmental Health, quoted and re-checked
- Genesee & Orleans County Health Departments (GOHealth), Environmental Health Division (geneseeny.gov)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Administration and Enforcement of the Uniform Code, quoted and re-checked
- dos.ny.gov, quoted and re-checked
- Administration and Enforcement of the Uniform Code, quoted and re-checked
- Smart Growth Plan, quoted and re-checked
- Agricultural and Farmland Protection, quoted and re-checked
- Median property tax bill: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.