The Town of Hartland, New York, has its own zoning law and requires a building permit from its Code Enforcement Officer for work covered by the state Uniform Code12. Building a home also means a dwelling of at least 1,000 square feet3. Septic approval comes from the Niagara County Department of Health, not the town4.

At a glance

Building permit
Required from the town Code Enforcement Officer for work under the Uniform Code2
Zoning
Yes, Chapter 144 of the Town Code1
Septic
Niagara County Department of Health approval before work starts; the town's own septic role is unconfirmed45
Minimum home size
1,000 square feet, not counting basement, attic or attached garage3
Certificate of occupancy
Required for work done under a building permit6
Shed exemption
Small detached structures under 144 square feet, if no cellar or slab2

Who to call

Building permits

Town of Hartland Building, Zoning & Code Enforcement Office

Building permits, zoning, code enforcement, and planning board and zoning board of appeals applications inside the Town of Hartland

716-735-7778

8942 Ridge Road, Gasport, NY 14067

Septic permits

Niagara County Department of Health, Environmental Health Division

Septic plan approvals and pre-sale septic dye tests under the Niagara County Health District

(716) 439-7444

55 Stevens Street, Lockport, NY 14094

Septic permits

Niagara County Department of Health: Sewage Disposal program

Plan review for new septic systems on vacant lots, dye tests at property transfer

Contact details are copied from each office’s official page and were checked against it on October 24, 2026.

Off-grid gear

Going off-grid in Town of Hartland means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does the Town of Hartland, NY have zoning?

Yes. The Town of Hartland adopted its own zoning law, Chapter 144 of the Town Code, in 1982, and divides the town into use districts shown on an adopted zoning map17. Floodplain and wetland subuse districts sit on top of those districts7. Niagara County does not zone land itself; New York gives zoning power to cities, towns and villages, not counties8.

One rule applies to every dwelling: no building used as a dwelling may have less than 1,000 square feet of floor area, not counting a basement, attic or attached garage3. That floor means a typical tiny home would not qualify as a dwelling in the town9.

We could not confirm Hartland's rules on living in an RV, temporary camping, accessory dwellings or short-term rentals. Ask the Building, Zoning & Code Enforcement Office before you plan around any of them10.

Do you need a building permit in the Town of Hartland, and who issues it?

Yes. The Town of Hartland requires a building permit for any work that must conform to the New York Uniform Code or Energy Code, including building, enlarging, altering or removing a structure2. The Code Enforcement Officer issues it, and work may not start until the permit is issued2. The town's own office says permits are not required for re-roofing or siding10.

The town exempts small detached structures under 144 square feet, as long as no cellar or slab is built2. Exempt work must still meet the code11.

The application is a written form signed by the owner or an authorized agent, filed with at least 2 sets of construction documents12. The fee is due when you submit the application; we could not confirm the amounts, so ask the office13. We did not find a separate owner-builder exemption in the town code, so plan on a permit even when you build your own house.

Building permits, zoning and the planning and zoning boards all sit in the town's Building, Zoning & Code Enforcement Office at 8942 Ridge Road, Gasport, phone 716-735-777810.

What happens after the permit: inspections and certificate of occupancy?

Permitted work must stay accessible and exposed until the Code Enforcement Officer inspects and accepts it, and the permit holder must call when each element is ready14. Inspections end with a final inspection once the work is complete14.

You may not occupy the new building until the town issues a certificate of occupancy6. A temporary certificate can cover a safely occupiable area for up to 6 months6.

How do septic permits work in the Town of Hartland?

Septic approval for Hartland addresses is a county matter. The Niagara County Health District requires written approval from the Public Health Director before anyone constructs, installs, connects, alters or extends a sewage disposal system4. The Niagara County Department of Health, Environmental Health Division, in Lockport handles it15.

For a new house on a vacant lot, the county reviews plans that must be prepared by a licensed New York State professional engineer16. Design plan review costs $290, according to a county fee list dated January 1, 2018, so confirm the current amount17.

Soils make this step matter: only about 1.6% of the soils in Niagara County rate as not limited for a conventional drain field, so expect a site evaluation and possibly an engineered system18. We could not confirm any Hartland-specific septic rule or well-permit rule on top of the county's, so ask the town and the county before you buy.

Building a home in the Town of Hartland: the steps, in order

  1. Call the Building, Zoning & Code Enforcement Office to confirm the zoning district and that a dwelling of at least 1,000 square feet fits it310.
  2. Get septic plan approval from the Niagara County Department of Health before construction415.
  3. File the written building permit application, signed by the owner or agent, with the construction documents12.
  4. Pay the building permit fee when you submit the application13.
  5. Build, leaving each stage exposed until the Code Enforcement Officer inspects it14.
  6. Obtain a certificate of occupancy before moving in6.

A driveway onto a state highway needs a permit from the New York State Department of Transportation19. We could not confirm Hartland's own driveway rules.

What stays with Niagara County, and what to check before you buy?

Septic approval, pre-sale septic dye tests and the county health district's sanitary code stay with Niagara County520. Subdivision maps are filed with the Niagara County Clerk after review by the county Office of Real Property21. The county's own rules for land outside Hartland are on the Niagara County page.

Before buying, check flood hazard status, since private development in a mapped flood hazard area needs a local floodplain development permit22. Also ask whether the parcel is in an agricultural district, where farm operations get some protection from local restrictions23.

Niagara County's effective property tax rate is 2.3%, and the median tax bill is $4,052 a year2425. The nearest city of 100,000 or more is about 21 miles from the county's center26.

Watch-outs

  • We could not confirm whether Hartland allows living in an RV, temporary camping or accessory dwellings on a lot, so ask the Building, Zoning & Code Enforcement Office before you buy10.
  • The permit fee schedule is in Chapter 78 of the town code; we could not confirm the amounts, so ask the office for the current figure13.
  • Septic permits for Hartland come from Niagara County, not the town, so a town building permit does not cover them4.
  • Zoning districts decide what you can build on a given parcel; get the current zoning map and district rules from the town before you make an offer7.

Sources

  1. Town of Hartland, NY, Chapter 144: Zoning (Town of Hartland), quoted and re-checked
  2. Town of Hartland, NY, Chapter 78: Fire Prevention and Building Code Administration (Town of Hartland), quoted and re-checked
  3. Town of Hartland, NY, Chapter 144, Article V: Use Districts (Town of Hartland), quoted and re-checked
  4. Disposal - Sewage, quoted and re-checked
  5. Disposal - Sewage, quoted and re-checked
  6. Town of Hartland, NY, Chapter 78: Fire Prevention and Building Code Administration (Town of Hartland), quoted and re-checked
  7. Town of Hartland, NY, Chapter 144, Article V: Use Districts (Town of Hartland), quoted and re-checked
  8. documents.dps.ny.gov (New York statewide rule), quoted and re-checked
  9. Town of Hartland, NY, Chapter 144, Article V: Use Districts (Town of Hartland), quoted and re-checked
  10. Town of Hartland Building, Zoning & Code Enforcement Office (townofhartlandny.gov)
  11. Part 1203 Uniform Code and the Energy Code: Minimum Standards for Administration and Enforcement (New York statewide rule), quoted and re-checked
  12. Town of Hartland, NY, Chapter 78: Fire Prevention and Building Code Administration (Town of Hartland), quoted and re-checked
  13. Town of Hartland, NY, Chapter 78: Fire Prevention and Building Code Administration (Town of Hartland), quoted and re-checked
  14. Town of Hartland, NY, Chapter 78: Fire Prevention and Building Code Administration (Town of Hartland), quoted and re-checked
  15. Niagara County Department of Health, Environmental Health Division (niagaracounty.gov)
  16. Disposal - Sewage, quoted and re-checked
  17. Disposal - Sewage, quoted and re-checked
  18. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  19. Residential Driveway Permits (New York statewide rule), quoted and re-checked
  20. Disposal - Sewage, quoted and re-checked
  21. Real Property FAQs, quoted and re-checked
  22. Floodplain Management - NYSDEC (New York statewide rule), quoted and re-checked
  23. New York Agriculture and Markets Law § 305-a (New York statewide rule), quoted and re-checked
  24. Effective property tax rate: Bolthole Index county data
  25. Median property tax bill: Bolthole Index county data
  26. Straight-line distance from the county center to the nearest city of 100,000+ people: Bolthole Index county data

Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Town of Hartland

Town of Hartland’s own rules

  • Building permitRequired

    Work in Hartland town that must conform to the Uniform Code and/or Energy Code, including residential construction.

    • Exemptions in § 78-4B include specified small detached structures, certain equipment, finish work, and qualifying repairs.
    • Work may not commence until the Code Enforcement Officer has issued the permit.

    small detached-structure exemption threshold: < 144 square feet (No cellars or slabs may be erected.)

    “Building permits required. Except as otherwise provided in Subsection B of this section, a building permit shall be required for any work which must conform to the Uniform Code and/or the Energy Code, including, but not limited to, the construction, enlargement, alteration, improvement, removal, relocation or demolition of any building or structure or any portion thereof, and the installation of a solid-fuel-burning heating appliance, chimney or flue in any dwelling unit.”
  • InspectionsRequired

    Permitted construction in Hartland town where applicable.

    • Work must remain accessible and exposed until inspected and accepted.
    • The permit holder must notify the Code Enforcement Officer when an inspectable element is ready.
    • The listed inspections include a final inspection after permitted work is completed.
    “Work to remain accessible and exposed. Work shall remain accessible and exposed until inspected and accepted by the Code Enforcement Officer or by an inspector authorized by the Code Enforcement Officer. The permit holder shall notify the Code Enforcement Officer when any element of work described in Subsection B of this section is ready for inspection.”
  • Certificate of occupancyRequired

    Work subject to a building permit and structures or portions converted to another use or occupancy classification in Hartland town.

    • Use or occupancy after a building permit is granted only by certificate of occupancy.
    • The Code Enforcement Officer or authorized inspector must inspect before issuance.
    • A temporary certificate may be issued only if the covered area may be safely occupied and the stated fire-protection and egress conditions are met; it may not exceed six months.

    maximum temporary certificate period: <= 6 months (Period is determined by and specified by the Code Enforcement Officer.)

    “Certificates of occupancy required. A certificate of occupancy shall be required for any work which is the subject of a building permit and for all structures, buildings, or portions thereof which are converted from one use or occupancy classification or subclassification to another. Permission to use or occupy a building or structure, or portion thereof, for which a building permit was previously issued shall be granted only by issuance of a certificate of occupancy.”
  • Local zoningPresent (with conditions)

    Land inside the Town of Hartland, New York.

    • Chapter 144 was adopted by the Town Board on August 12, 1982; amendments are noted where applicable.
    “[HISTORY: Adopted by the Town Board of the Town of Hartland 8-12-1982. Amendments noted where applicable.]”
  • Zoning districtsPublished (with conditions)

    Zoning districts inside Hartland town.

    • The zoning map is adopted simultaneously with Chapter 144, certified by the Town Clerk, and accompanies the chapter.
    • Floodplain and wetland subuse districts are also established.
    “For the purpose of promoting the public health, safety and welfare of the residents of the Town of Hartland, the Town is hereby divided into the following use districts:”
  • Minimum dwelling sizeSpecified

    Every building utilized as a dwelling inside Hartland town.

    • Basement, attic, and attached-garage floor area is excluded.

    minimum dwelling floor area: >= 1000 square feet (Exclusive of any basement, attic or attached garage.)

    “No building utilized as a dwelling shall contain less than 1,000 square feet of floor area, exclusive of any basement, attic or attached garage.”
  • Tiny homesLimited

    A dwelling used as a tiny home inside Hartland town.

    • The minimum floor-area standard excludes a basement, attic, and attached garage.
    • The rule applies to a building utilized as a dwelling.

    minimum dwelling floor area: >= 1000 square feet (Exclusive of any basement, attic or attached garage.)

    “No building utilized as a dwelling shall contain less than 1,000 square feet of floor area, exclusive of any basement, attic or attached garage.”
  • Permit feesVariable (with conditions)

    Building permits, amended permits, renewals, inspections, and certificates of occupancy in Hartland town.

    • A building-permit fee must be paid when the application is submitted.
    • Inspection fees must be paid before or when each inspection is performed.
    • The exact fee schedule was not extracted from the available reviewed code material.
    “Fee. The fee specified in or determined in accordance with the provisions set forth in § 78-16, Fees, of this chapter must be paid at the time of submission of an application for a building permit, for an amended building permit, or for renewal of a building permit.”
  • Permit processPublished (with conditions)

    Building-permit applications in Hartland town.

    • Application must be written on a form provided by or acceptable to the Code Enforcement Officer.
    • It must be signed by the property owner or authorized agent.
    • The application must include sufficient information to determine compliance with the Uniform Code and Energy Code.
    • Work may not begin unless a permit is issued.

    construction-document sets: >= 2 sets (Required with the application, subject to § 78-4D(6).)

    “Applications for a building permit shall be made in writing on a form provided by or otherwise acceptable to the Code Enforcement Officer. The application shall be signed by the owner of the property where the work is to be performed or by an authorized agent of the owner.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Hartland or Niagara County directly.

  • Owner-builder exemption — Owner-built residential work in Hartland town.
  • Living in an RV — Long-term occupancy of recreational vehicles on private land inside Hartland town.
  • Camping on your land — Temporary camping on private land inside Hartland town.
  • Accessory dwellings — Accessory dwelling units inside Hartland town.
  • Who permits septic — On-site wastewater systems inside Hartland town.
10 more unanswered
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Hartland publishes no rule on the point, not that none exists. Niagara County’s page lists the county offices to call.