Building permits, zoning and septic rules in the Town of Stony Point, New York

The Town of Stony Point, New York requires a building permit for new residential construction, issued by the Town's Building Department1. The Town also adopts its own zoning, so Rockland County does not23. Septic plans for any address in Rockland County are approved by the county Commissioner of Health4.

At a glance

Building permit
Required from the Town for work covered by the NYS Uniform Code, including new homes1
Zoning
Town zoning with a Use Table and Bulk Table by district25
Septic
Plan approval from the Rockland County Commissioner of Health; no new septic where public sewer is available46
Certificate of occupancy
Required after a Town inspection of permitted work7
RV, tiny home, ADU
Not confirmed; depends on the district Use Table, so ask the Town Zoning Department5
Property tax (county)
Rockland County's effective rate is 1.8%8

Who to call

Building permits

Town of Stony Point Building Department

Building permits, inspections and certificates of occupancy inside the Town of Stony Point

(845) 786-2716

74 East Main Street Stony Point, NY 10980

Zoning

Town of Stony Point Zoning Department (Zoning Board of Appeals)

Zoning Board of Appeals applications and the zoning map for the Town of Stony Point

845-786-2716

zoning@townofstonypoint.org

Septic permits

Rockland County Department of Health, Environmental Health

Septic system plan review and approval, installation inspections and realty subdivision review countywide

845-364-2656

Contact details are copied from each office’s official page and were checked against it on October 24, 2026.

Off-grid gear

Going off-grid in Town of Stony Point means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Stony Point, NY?

Yes. The Town of Stony Point requires a building permit before work starts on anything that must meet the New York State Uniform Code or Energy Code, including new residential construction1. The Town code lists its exempt categories, and state rules allow a town to exempt small items such as a one-story detached shed of 144 square feet or less9. An exemption never excuses work that violates the code.

The application is made in writing on a form from the Code Enforcement Officer and signed by the owner or the owner's agent10. Since August 2026 the Town adds administrative fees on top of the standard fee when work starts without a permit11. Major changes to a building with a septic system may also need Health Department approval, and site-plan approval or a zoning variance may come first1.

Who issues building permits in Stony Point, and how do you reach them?

The Town of Stony Point Building Department issues building permits, runs inspections and issues certificates of occupancy for land inside the Town111. Town Hall is at 74 East Main Street, Stony Point, NY 10980, phone (845) 786-271611. Rockland County does not issue building permits for Stony Point land; the Town enforces the state Uniform Code itself1.

Permitted work must stay exposed until the Code Enforcement Officer or an authorized inspector accepts it, and the permit holder must call for each inspection12. A certificate of occupancy is required once the work is finished, after a Town inspection, and new buildings and major additions also need an as-built map7.

Does Stony Point have zoning, and what does it mean for RVs, tiny homes, lot size and setbacks?

Yes. The Town of Stony Point has its own zoning chapter with a Use Table and a Bulk Table, and every use must comply with both2. New York counties have no power to adopt conventional zoning, so Rockland County does not zone Stony Point land; the Town does3.

Uses are sorted by district: some need Planning Board approval, some need a Town Board special permit, and special and conditional uses also need site-development-plan approval5. Minimum lot size, setbacks and lot coverage all depend on the district and use group in the Bulk Table, so no single number applies town-wide131415. New manufactured homes are limited to the Town's MHC District and need Planning Board site-plan approval16.

We could not confirm Stony Point's rules on RV occupancy, tiny homes, accessory dwellings or minimum house size. Ask the Zoning Department before buying17.

How do septic permits work in Stony Point?

Septic approval comes from the county, not the Town. In Rockland County, a plan for a new or altered private sewage-disposal system must be approved by the Commissioner of Health before work begins, and the system cannot be used until it is inspected and a certificate of approval is issued4. The Rockland County Department of Health reviews system plans and inspects installations18.

Where a public sewer is available and accessible, the county code bars a new subsurface system4, and Stony Point's own code makes it unlawful to build or repair a septic tank, cesspool or leach field when public sewers are available6. Check sewer availability first.

Soil is a further hurdle: only about 4.3% of soils in Rockland County rate as not limited for a conventional drain field, so expect a site evaluation and possibly an engineered system19. We could not confirm a Town-level rule for private wells.

Can you live in an RV or tiny home on your land in Stony Point?

We could not confirm it. Stony Point's zoning Use Table decides which dwelling types are allowed in each district, and the table was not available for us to read, so the answers for long-term RV living, temporary camping, tiny homes and accessory dwellings are open5. The state's rule on camping covers DEC campgrounds, not private land20.

Call the Town Zoning Department at 845-786-2716 and ask about your specific parcel and district before you plan to live in anything other than a permitted, code-compliant house17. The one dwelling type the Town code addresses is manufactured housing, which is confined to the MHC District16.

Building a home in Stony Point: the steps, in order

  1. Ask the Zoning Department which district your parcel is in and whether the use you want is allowed or needs Planning Board or Town Board approval517.
  2. Confirm whether public sewer reaches the lot; if it does, a new septic system is not allowed6.
  3. If no sewer, file septic plans with the Rockland County Department of Health418.
  4. Get any site-plan approval or variance, then apply in writing to the Building Department for a building permit101.
  5. Call for inspections as the work reaches each stage, and keep it exposed until accepted12.
  6. Obtain the certificate of occupancy before moving in7.

What stays with Rockland County, and what to check before you buy in Stony Point

Rockland County handles septic approval, subdivision review of three or more lots, and stream and floodplain permits1821. Work in or near a county-regulated stream needs a Stream Control Act permit, and development in a FEMA flood hazard area needs a floodplain permit2223. For land outside the Town, see the Rockland County page.

County-level numbers frame the cost: Rockland County's effective property tax rate is 1.8% and the median bill is $10,001 a year824.

Watch-outs

  • We could not confirm Stony Point's rules on RV living, tiny homes, accessory dwellings, driveway permits, short-term rentals or owner-builder work; call the Town Building and Zoning Departments before you commit1117.
  • A parcel with public sewer available cannot get a new septic system, so confirm sewer availability before planning a septic design6.
  • Starting work without a permit triggers administrative fees on top of the standard permit fee11.

Sources

  1. Chapter 77: Building Code Administration and Enforcement (Town of Stony Point), quoted and re-checked
  2. Article IV: Use Requirements (Town of Stony Point), quoted and re-checked
  3. documents.dps.ny.gov (New York statewide rule), quoted and re-checked
  4. Rockland County Sanitary Code, Article IV – Waste Facilities and Disposal, quoted and re-checked
  5. Article IV: Use Requirements (Town of Stony Point), quoted and re-checked
  6. Article II: Disposal of Wastes; Connection to Public Sewer (Town of Stony Point), quoted and re-checked
  7. Chapter 77: Building Code Administration and Enforcement (Town of Stony Point), quoted and re-checked
  8. Effective property tax rate: Bolthole Index county data
  9. Part 1203 Uniform Code and the Energy Code: Minimum Standards for Administration and Enforcement (New York statewide rule), quoted and re-checked
  10. Chapter 77: Building Code Administration and Enforcement (Town of Stony Point), quoted and re-checked
  11. Town of Stony Point Building Department (stonypointny.gov)
  12. Chapter 77: Building Code Administration and Enforcement (Town of Stony Point), quoted and re-checked
  13. Article V: Bulk Requirements (Town of Stony Point), quoted and re-checked
  14. Article V: Bulk Requirements (Town of Stony Point), quoted and re-checked
  15. Article V: Bulk Requirements (Town of Stony Point), quoted and re-checked
  16. Article V: Bulk Requirements (Town of Stony Point), quoted and re-checked
  17. Town of Stony Point Zoning Department (Zoning Board of Appeals) (stonypointny.gov)
  18. Rockland County Department of Health, Environmental Health (rocklandcountyny.gov)
  19. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  20. Campground Rules and Regulations (New York statewide rule), quoted and re-checked
  21. Rockland County Sanitary Code, Article VII — Realty Subdivisions, quoted and re-checked
  22. Stream Control Act Permit Application, quoted and re-checked
  23. Floodplain Management, quoted and re-checked
  24. Median property tax bill: Bolthole Index county data

Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Town of Stony Point

Town of Stony Point’s own rules

  • Building permitRequired

    Work in Stony Point that must conform to the Uniform Code or Energy Code, including new residential construction.

    • Exempt work categories are listed in § 77-4B.
    • A permit must be obtained from the Town before work begins.
    • Major changes or additions to buildings with septic systems may require Health Department approval.
    • Site-plan approval or zoning variances may be required before Building Department review.
    “Building permits required. Except as otherwise provided in Subsection B of this section, a building permit shall be required for any work which must conform to the Uniform Code and/or the Energy Code, including, but not limited to, the construction, enlargement, alteration, improvement, removal, relocation or demolition of any building or structure or any portion thereof, and the installation of a solid-fuel-burning heating appliance, chimney or flue in any dwelling unit.”
  • InspectionsRequired

    Permitted construction in the Town of Stony Point.

    • Work must remain accessible and exposed until inspected and accepted.
    • Inspections apply where applicable.
    • A remote inspection may substitute only at the authorized official's discretion and if it provides equivalent information and quality.
    “Work shall remain accessible and exposed until inspected and accepted by the Code Enforcement Officer or by an inspector authorized by the Code Enforcement Officer. The permit holder shall notify the Code Enforcement Officer when any element of work described in Subsection B of this section is ready for inspection.”
  • Certificate of occupancyRequired

    Work subject to a building permit and structures converted to another use or occupancy classification in Stony Point.

    • A Town inspection occurs before issuance.
    • The completed work must comply with applicable Uniform Code and Energy Code provisions.
    • For new buildings and major additions, an as-built map is required before a certificate is issued.
    “A certificate of occupancy/certificate of compliance shall be required”
  • Local zoningPresent (with conditions)

    Land inside the Town of Stony Point, New York.

    • Uses must comply with the Town zoning chapter, including its Use Table and Bulk Table.
    “requirements affecting the use of buildings”
  • Zoning districtsPublished (with conditions)

    Town of Stony Point zoning districts and their use requirements.

    • District-specific uses are governed by the Use Table.
    • Uses in Column C require Planning Board approval; Column D uses require Town Board special-permit approval; site-development-plan approval is also required for special and conditional uses.
    “The Use Table is divided into columns, with each column headed by a capital letter for reference. Horizontal lines divide the requirements for one district from those of another.”
  • Minimum lot sizeDistrict specific (with conditions)

    Lots in Stony Point zoning districts; exact values depend on the applicable use group and district.

    • The Bulk Table applies by use group.
    • For cluster development, the Planning Board may modify minimum lot area but cannot reduce lot size below the area required for adequate septic sewage disposal where such systems are provided.
    “The accompanying table entitled "Table of Bulk Requirements," which shall be a part of this chapter, is referred to herein as the "Bulk Table" and sets forth the minimum bulk requirements of this chapter.”
  • SetbacksDistrict specific (with conditions)

    Lots in Stony Point zoning districts; exact values depend on the applicable use group and district.

    • Other zoning articles contain supplemental setback requirements.
    • The Planning Board may modify front, side, and rear yards and setbacks through the average-density procedure when approving a subdivision plat, but not building-height requirements.
    “Other articles herein contain supplemental requirements applying to bulk, setback and coverage of specified uses.”
  • Lot coverageDistrict specific (with conditions)

    Lots in Stony Point zoning districts; exact values depend on the applicable use group and district.

    • Supplemental coverage requirements may apply to specified uses.
    “Other articles herein contain supplemental requirements applying to bulk, setback and coverage of specified uses.”
  • Manufactured homesLimited

    New manufactured-home units in the Town's MHC District.

    • For new, nonreplacement units, all MHC District requirements apply and Planning Board site-plan approval is necessary.
    • Replacement units meeting MHC requirements except specified lot and setback requirements need only a building permit.
    • Other cases require Zoning Board of Appeals variances.
    “For new (not replacement) units, all requirements of the MHC District shall apply, and Planning Board approval of the site plan is necessary.”
  • Off-grid sanitationLimited

    Private sewage-disposal facilities inside Stony Point.

    • A privy, septic tank, cesspool, leach field, seepage facility, or other sewage-disposal facility cannot be constructed or repaired if public sewers are available.
    “It shall be unlawful for any person to construct or repair any privy, privy vault, septic tank, cesspool, leach field, seepage, or other facility intended for the disposal of sewage if public sewers are available.”
  • Subdividing landRegulated (with conditions)

    Subdivision plats inside the Town of Stony Point.

    • Average-density modifications are considered simultaneously with Planning Board subdivision-plat approval.
    • The Planning Board may impose conditions on ownership, use, and maintenance of land reserved for park, recreation, open space, or other municipal purposes.
    “Application Procedure and Approval Process”
  • Permit processPublished (with conditions)

    Building-permit applications in Stony Point.

    • The application must be in writing on an acceptable form and signed by the owner or authorized agent.
    • The application must contain information sufficient to determine compliance with the Uniform Code and Energy Code.
    • Work cannot start until a permit is issued.
    “Applications for a building permit shall be made in writing on a form provided by or otherwise acceptable to the Code Enforcement Officer. The application shall be signed by the owner of the property where the work is to be performed or by an authorized agent of the owner.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Stony Point or Rockland County directly.

  • Owner-builder exemption — Owner-builder work on residential property in Stony Point.
  • Minimum dwelling size — Single-family dwelling units in Stony Point zoning districts.
  • Living in an RV — Long-term occupancy of a recreational vehicle on private land in Stony Point.
  • Camping on your land — Temporary camping on private land in Stony Point.
  • Tiny homes — Tiny-home occupancy in Stony Point.
9 more unanswered
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Stony Point publishes no rule on the point, not that none exists. Rockland County’s page lists the county offices to call.

← All of Rockland County: county rules, score and offices