The Village of Head of the Harbor, in Suffolk County, New York, requires a village building permit for new construction1. The village adopts and enforces its own zoning, with residential districts A, A-1, B and B-1 plus a parkland district2. Septic permits for new homes come from the Suffolk County Department of Health Services, not the village3. Suffolk County itself has no zoning of its own4.
At a glance
- Building permit
- Required from the Village Building Department for work that must meet the state Uniform Code1
- Zoning
- Village zoning with residential districts A, A-1, B and B-1 and a parkland district D5
- Minimum lot size
- 2 acres in A and A-1, 1 acre in B, 20,000 square feet in B-16
- Minimum home size
- 2,250 square feet for a one-story main building in all four residential districts7
- Septic
- Suffolk County Department of Health Services, Office of Wastewater Management8
- Certificate of occupancy
- Required for work covered by a village building permit9
Who to call
Building permits
Village of Head of the Harbor Building Department
Village building permits, inspections and certificates of occupancy or compliance; the starting point for village board applications
500 N. Country Road, Saint James, NY 11780
Septic permits
Suffolk County Department of Health Services, Office of Wastewater Management
Septic and water-supply approvals for new homes in Suffolk County, including inside villages
360 Yaphank Avenue Suite 2C Yaphank, New York 11980
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in Village of Head of the Harbor means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Head of the Harbor, NY?
Yes. The Village of Head of the Harbor requires a building permit for any work that must conform to the New York State Uniform Code or Energy Code, which covers residential construction1. The Village Building Department says permits are required for structures such as additions, garages, decks, pools, fences, walls and driveways10. One-story detached sheds and playhouses of 144 square feet or less tied to a one-family home can be exempt1.
After the permit, the work must stay exposed until the Village inspects it11. A certificate of occupancy is required for any work covered by a building permit9. A permit is valid for one year, and it must be renewed if no certificate of occupancy has been issued10.
Who issues building permits in Head of the Harbor, and how do you reach them?
The Village Building Department issues building permits inside the Village; Suffolk County does not12. Reach the Building Department at 631-584-5602, or at Village Hall, 500 N. Country Road, Saint James10. The department says its applications are not accepted electronically, so plan to deliver paper forms10.
A building permit application is also the starting point for the Village's board reviews, and complete applications are due to the department by the second Monday of each month to make the next board agenda10. Applications must show proposed well and septic locations where applicable13.
Does Head of the Harbor have zoning, and what does it mean for lot size, home size and setbacks?
Yes. The Village is divided into residential Districts A, A-1, B and B-1 and an undeveloped parkland District D5. Suffolk County has no direct zoning power, so the Village decides4.
Minimum lot area is 2 acres in Districts A and A-1, 1 acre in District B and 20,000 square feet in District B-16. A one-story main building must have at least 2,250 square feet in all four residential districts, and a main building of more than one story needs 2,750 square feet in total with 1,750 on the ground floor7. Main buildings may be up to 34 feet tall14.
Front yards for a main building run 100 feet in District A, 75 in A-1, 100 in B and 40 in B-1; lots on Stony Brook Harbor face extra 100-foot setbacks from the high-water line and bluff edge15. Subdivision of land has its own village procedure16.
How do septic permits work in Head of the Harbor?
Septic approval for a new home comes from the Suffolk County Department of Health Services' Office of Wastewater Management, and the permit is required before building317. Sewage-disposal construction must be inspected before use18. New or expanded single-family homes may need an innovative or alternative septic system under Article 6 of the county sanitary code19.
Where an individual system is allowed, the county's lot-size rule generally calls for parcels of at least 20,000 square feet, with listed exceptions20. The Village's own minimum lot areas in Districts A, A-1 and B are larger, so the zoning minimum will usually control6.
We could not confirm any Village-specific septic or well rule; ask the Building Department what it needs from the county before it will issue a certificate of occupancy.
Can you live in an RV or tiny home in Head of the Harbor?
We could not confirm a Village rule on RV living, temporary camping or tiny homes. Suffolk County's RV occupancy limits apply to county campgrounds and do not set rules for private land21. Because every building in the Village must have a certificate of occupancy where it is subject to a building permit9, and main buildings must meet the minimum floor areas for the district7, a tiny home as a main residence looks unlikely to fit. Confirm with the Village Building Department before buying10.
Building a home in Head of the Harbor: the steps, in order
- Confirm your lot's zoning district and that it meets the minimum lot area and setbacks615.
- Ask the Suffolk County Office of Wastewater Management about septic approval for the lot317.
- Submit a complete building permit application to the Village Building Department, which also starts any board review10.
- Hold the work open for the stage inspections the Village requires11.
- Obtain a certificate of occupancy before using the building9.
If the lot fronts a county road, a County Highway Work Permit is required for driveway work in the county right-of-way22.
What stays with Suffolk County, and what to check before you buy
Septic and private-well matters stay with Suffolk County Department of Health Services rather than the Village8. New-construction well testing there costs $35023. Only about 1.2% of soils in Suffolk County rate as not limited for a conventional drain field, so expect a site evaluation and likely an engineered system24.
Suffolk County's effective property tax rate is 1.9%25, and the median property tax bill is about $10,001 a year26. The county's own page covers land outside village limits: Suffolk County.
Watch-outs
- The Village's minimum home sizes are large: 2,250 square feet for one story7.
- A village building permit is only one step; the Building Department says you may also need Suffolk County Board of Health and DEC approval10.
- We could not confirm Village rules on owner-performed construction, accessory dwellings, short-term rentals or flood-zone development; ask the Building Department before you commit10.
- Homeowner-as-contractor filing on the statewide BP-1 form is not available when you build your own new primary or secondary residence27.
Sources
- Village of Head-of-the-Harbor, NY, Chapter 65, Article I: Administration and Enforcement of Uniform Fire Prevention and Building Code (Village of Head of the Harbor), quoted and re-checked
- Village of Head-of-the-Harbor, NY, Chapter 165, Article III: Establishment of Districts (Village of Head of the Harbor), quoted and re-checked
- Wastewater Management, quoted and re-checked
- Suffolk County Planning Commission Minutes: November 5, 2003, quoted and re-checked
- Village of Head-of-the-Harbor, NY, Chapter 165, Article III: Establishment of Districts (Village of Head of the Harbor), quoted and re-checked
- ecode360.com (Village of Head of the Harbor), quoted and re-checked
- Village of Head-of-the-Harbor, NY, Chapter 165, Article VII: Permitted Uses and Bulk Regulations (Village of Head of the Harbor), quoted and re-checked
- Wastewater Management, quoted and re-checked
- Village of Head-of-the-Harbor, NY, Chapter 65, Article I: Administration and Enforcement of Uniform Fire Prevention and Building Code (Village of Head of the Harbor), quoted and re-checked
- Village of Head of the Harbor Building Department (headoftheharborny.gov)
- Village of Head-of-the-Harbor, NY, Chapter 65, Article I: Administration and Enforcement of Uniform Fire Prevention and Building Code (Village of Head of the Harbor), quoted and re-checked
- Village of Head-of-the-Harbor, NY, Chapter 65, Article I: Administration and Enforcement of Uniform Fire Prevention and Building Code (Village of Head of the Harbor), quoted and re-checked
- Village of Head-of-the-Harbor, NY, Chapter 65, Article I: Administration and Enforcement of Uniform Fire Prevention and Building Code (Village of Head of the Harbor), quoted and re-checked
- Village of Head-of-the-Harbor, NY, Chapter 165, Article VII: Permitted Uses and Bulk Regulations (Village of Head of the Harbor), quoted and re-checked
- Village of Head-of-the-Harbor, NY, Chapter 165, Article VII: Permitted Uses and Bulk Regulations (Village of Head of the Harbor), quoted and re-checked
- Village of Head-of-the-Harbor, NY, Chapter 143: Subdivision of Land (Village of Head of the Harbor), quoted and re-checked
- Suffolk County Department of Health Services, Office of Wastewater Management (suffolkcountyny.gov)
- Wastewater Management, quoted and re-checked
- Suffolk County Sanitary Code Article 6, quoted and re-checked
- Suffolk County Sanitary Code – Article 6, quoted and re-checked
- Campground Rules and Regulations, quoted and re-checked
- Non-Utility Highway Work Permit, quoted and re-checked
- Private Well Water Testing Program, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- STATE & MUNICIPAL, quoted and re-checked
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.