Building permits, zoning and septic in the Town of Marbletown, New York

The Town of Marbletown, New York requires a building permit for any work that must meet the state Uniform Code or Energy Code, and the Code Enforcement Officer must issue it before work starts1. The town also has its own zoning, Chapter 200 of the Town Code2. Septic permits for Ulster County, town or not, come from the Ulster County Department of Health3.

At a glance

Building permit
Required for work covered by the Uniform Code or Energy Code, with listed exemptions1
Who issues it
Marbletown Code Enforcement Officer14
Zoning
Yes, set by the Town Board in Chapter 200 of the Town Code2
Certificate of occupancy
Required for work done under a building permit5
Septic
Ulster County Department of Health, Environmental Health Division3
Mobile-home parks
Need a Town permit and county health approval6

Who to call

Building permits

Town of Marbletown Building & Code Enforcement

Building permits, inspections and certificates of occupancy inside the Town of Marbletown

(845) 687-7500

building@marbletown.gov

1925 Lucas Ave. Cottekill, NY 12419

Septic permits

Ulster County Department of Health, Environmental Health Division

Septic (onsite wastewater) plan review, permits and construction inspection countywide

(845) 340-3010

239 Golden Hill Lane, Kingston, NY 12401

Contact details are copied from each office’s official page and were checked against it on October 24, 2026.

Off-grid gear

Going off-grid in Town of Marbletown means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Marbletown, New York?

Yes, for most construction. The Town of Marbletown requires a building permit for any work that must conform to the Uniform Code or Energy Code, including construction, enlargement, alteration, removal, relocation and demolition1. A short list of exemptions in the town's building chapter applies unless zoning or another Town Code section still requires a permit1.

Work may not begin until the Code Enforcement Officer has issued the permit7. Applications are made in writing on a form the Code Enforcement Officer provides or accepts, signed by the owner or an authorized agent7. Permit and inspection fees are set by Town Board resolution rather than a fixed schedule in the code8. Ask the building office for the current fee list.

We could not find an owner-builder exemption in Marbletown's building chapter, so assume an owner building their own house still needs the permit.

Who issues building permits in Marbletown, and how do you reach them?

The Town of Marbletown issues its own building permits through its Building & Code Enforcement office, led by the Code Enforcement Officer4. The office can be reached at (845) 687-7500 or building@marbletown.gov, and the Town Hall address is 1925 Lucas Ave., Cottekill, NY 124194.

Ulster County's building-code law lets the county Department of Health enforce the Uniform Code only in towns that have formally opted out of running their own code enforcement9. Marbletown runs its own Code Enforcement Officer, so the town office is the right first call.

Does Marbletown have zoning, and what does it mean for RVs, tiny homes and setbacks?

Yes. Marbletown adopted its zoning as Chapter 200 of the Town Code, and Chapter 200 sets up zoning districts, a zoning map and use and bulk controls210. Zoning is a town matter in New York, because the state gives counties no authority to zone unincorporated land11.

The lot-size, setback and dwelling-size figures sit in the town's Density Control Schedule, and we could not read those district figures. Ask the Code Enforcement Officer which district a parcel is in, then request that district's schedule before you buy. We also could not confirm a Marbletown rule on living in an RV, a tiny home or an accessory dwelling, so get an answer in writing from the building office first.

Subdividing land goes through the town's Chapter 169 preliminary- and final-plat process12.

How do septic permits work in Marbletown?

Ulster County's Department of Health, not the town, handles septic: the county Environmental Health Division regulates residential onsite wastewater systems and requires a permit to construct one313. Construction of an approved system is also inspected by the county14.

The county notes that most towns want approved septic plans before issuing a building permit, and that the process can take up to 6 months on smaller residential properties15. Start the septic design early, and schedule the soil-profile test pit with the county15.

Soils make this matter. USDA rates essentially none of Ulster County's soils as not limited for a conventional drain field16, so expect a site evaluation and possibly an engineered system. We could not confirm a separate Marbletown septic rule beyond the county's.

Can you live in an RV or tiny home on your land in Marbletown?

We could not confirm a Marbletown rule on RV occupancy, temporary camping or tiny-home living. New York's tiny-house guidance treats a tiny house as a single dwelling unit under the state Uniform Code, which points to the same permit and inspection path as any house17. Ask the Code Enforcement Officer at (845) 687-7500 before parking or placing anything you plan to sleep in4.

Mobile-home parks are the one manufactured-housing use the town code addresses: a park needs a Town permit, and the application must show Ulster County Department of Health approval6.

Building a home in Marbletown: the steps, in order

  1. Ask the Code Enforcement Officer which zoning district the parcel is in and what that district allows4.
  2. Contact the Ulster County Department of Health to schedule the soil test and get septic plans approved15.
  3. Apply in writing for a building permit with the Code Enforcement Officer; work cannot start until it is issued7.
  4. Leave work exposed and accessible until the inspector has accepted it, and notify the Code Enforcement Officer when listed work is ready18.
  5. Get a certificate of occupancy, which is required for any work done under a building permit5.

New applications must meet the 2025 New York State Uniform Code, effective December 31, 202519.

What to check before you buy land in Marbletown

Check the zoning district and its Density Control Schedule with the town, the septic feasibility with Ulster County Health, and driveway access: a residence on a New York state highway needs a state driveway permit before the driveway is built or changed20. For floodplain land, development in FEMA-mapped flood hazard areas needs a local permit21.

Taxes matter too. Ulster County's effective property tax rate is 1.9% and the median bill is $6,124 a year2223. The county's typical home value is $450,80624. For land outside Marbletown, see the Ulster County page.

Watch-outs

  • Marbletown's building permit exemptions are listed in the town code and do not override zoning or other Town Code permit requirements1.
  • We could not confirm Marbletown's rules on RV occupancy, tiny homes, accessory dwellings, setbacks, private wells or driveway permits; ask the Code Enforcement Officer at (845) 687-7500 before you buy4.
  • Septic design can take up to 6 months on smaller residential properties, so start it before applying for the building permit15.

Sources

  1. Chapter 99: Building Construction - Town of Marbletown, NY (Town of Marbletown), quoted and re-checked
  2. Chapter 200: Zoning - Town of Marbletown, NY (Town of Marbletown), quoted and re-checked
  3. Water & Wastewater Regulation - Ulster County, quoted and re-checked
  4. Town of Marbletown Building & Code Enforcement (marbletown.gov)
  5. Chapter 99: Building Construction - Town of Marbletown, NY (Town of Marbletown), quoted and re-checked
  6. Chapter 135: Mobile Homes and Mobile Home Parks - Town of Marbletown, NY (Town of Marbletown), quoted and re-checked
  7. Chapter 99: Building Construction - Town of Marbletown, NY (Town of Marbletown), quoted and re-checked
  8. Chapter A205: Fees - Town of Marbletown, NY (Town of Marbletown), quoted and re-checked
  9. Local Law No. 1 of 2023 - Amending the Code of Ulster County for Administration and Enforcement of Building Code, quoted and re-checked
  10. Chapter 200: Zoning - Town of Marbletown, NY (Town of Marbletown), quoted and re-checked
  11. documents.dps.ny.gov (New York statewide rule), quoted and re-checked
  12. Chapter 169: Subdivision of Land - Town of Marbletown, NY (Town of Marbletown), quoted and re-checked
  13. Sewage Disposal System Application - Ulster County, quoted and re-checked
  14. Sewage Disposal System Application - Ulster County, quoted and re-checked
  15. Ulster County Department of Health, Environmental Health Division (ulstercountyny.gov)
  16. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  17. Notice of Adoption, quoted and re-checked
  18. Chapter 99: Building Construction - Town of Marbletown, NY (Town of Marbletown), quoted and re-checked
  19. Notice of Adoption - New York State Uniform Code, quoted and re-checked
  20. Residential Driveway Permits (New York statewide rule), quoted and re-checked
  21. Floodplain Management - NYSDEC (New York statewide rule), quoted and re-checked
  22. Effective property tax rate: Bolthole Index county data
  23. Median property tax bill: Bolthole Index county data
  24. Typical home value (Zillow): Bolthole Index county data

Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Town of Marbletown

Town of Marbletown’s own rules

  • Building permitRequired

    Work in Marbletown that must conform to the Uniform Code or Energy Code, including construction, enlargement, alteration, improvement, removal, relocation, demolition, and listed solid-fuel equipment work.

    • The listed § 99-4B exemptions apply unless a permit is required under zoning or another Town Code section.
    • Work may not commence until the Code Enforcement Officer has issued the permit.
    “Except as otherwise provided in Subsection B of this section, a building permit shall be required for any work which must conform to the Uniform Code and/or the Energy Code”
  • InspectionsRequired

    Permitted construction in Marbletown where listed inspection elements apply.

    • Work must remain accessible and exposed until inspected and accepted.
    • Permit holder must notify the Code Enforcement Officer when listed work is ready.
    • Inspection fees under the Town Board fee schedule are due before or at each inspection.
    “Work shall remain accessible and exposed until inspected and accepted by the Code Enforcement Officer or by an inspector authorized by the Code Enforcement Officer.”
  • Certificate of occupancyRequired

    Any work subject to a building permit and structures or portions converted to another use or occupancy classification in Marbletown.

    • The Code Enforcement Officer or authorized inspector must inspect before issuance.
    • The work and any conversion must comply with applicable Uniform Code and Energy Code provisions.
    “A certificate of occupancy shall be required for any work which is the subject of a building permit and for all structures, buildings, or portions thereof, which are converted from one use or occupancy classification or subclassification to another.”
  • Local zoningPresent (with conditions)

    Land inside the Town of Marbletown.

    • Chapter 200 was adopted by the Town Board; amendments are noted where applicable.
    “[HISTORY: Adopted by the Town Board of the Town of Marbletown 5-24-1989 by L.L. No. 1-1989. Amendments noted where applicable.]”
  • Zoning districtsPublished (with conditions)

    Zoning districts inside Marbletown.

    • District boundaries are addressed in Chapter 200 Article II and zoning use and bulk controls are addressed in subsequent articles.
    “Article II Establishment of Districts [...] § 200-4 Establishment and intent of zoning districts. [...] § 200-5 Zoning Map. [...] § 200-6 Interpretation of district boundaries.”
  • Manufactured homesLimited

    Mobile-home parks inside Marbletown.

    • A mobile-home park requires a Town permit.
    • The application must include evidence of Ulster County Department of Health approval and compliance with applicable state health requirements.
    “No person, firm or corporation, being the owner or occupant of any land or premises within the Town of Marbletown, shall use or permit the use of said land or premises as a mobile home park without obtaining a permit therefor as hereinafter provided.”
  • Subdividing landRegulated (with conditions)

    Subdivision applications inside Marbletown.

    • The chapter provides preliminary-plat and final-plat procedures.
    • The specific submission, approval, and agency-endorsement conditions must be met under Chapter 169.
    “Article III Procedure for Filing Applications [...] § 169-20 Application for consideration of preliminary plat. [...] § 169-27 Submission of final plat.”
  • Permit feesVariable (with conditions)

    Town services and permits, including building, fire-safety, zoning, and planning permits in Marbletown.

    • Fees are established by Town Board resolution at its annual organization meeting or another time the Board deems appropriate.
    “All fees for services and permits provided by the Town, including but not limited to building permits, fire safety inspections, Zoning and Planning permits and dog licensing, identification and control, shall be established by resolution of the Town Board at its annual organization meeting or at such other time deemed appropriate by the Board.”
  • Permit processPublished (with conditions)

    Building-permit applications inside Marbletown.

    • Application must be in writing, on a form provided by or acceptable to the Code Enforcement Officer.
    • It must be signed by the owner or authorized agent and include information sufficient to evaluate code compliance.
    • Work cannot start until a building permit is issued.
    “Applications for a building permit shall be made in writing on a form provided by or otherwise acceptable to the Code Enforcement Officer.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Marbletown or Ulster County directly.

  • Owner-builder exemption — Owner-builder work inside Marbletown.
  • Minimum dwelling size — Dwellings inside Marbletown zoning districts.
  • Minimum lot size — Lots inside Marbletown zoning districts.
  • Setbacks — Lots inside Marbletown zoning districts.
  • Lot coverage — Lots inside Marbletown zoning districts.
15 more unanswered
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Marbletown publishes no rule on the point, not that none exists. Ulster County’s page lists the county offices to call.

← All of Ulster County: county rules, score and offices