In the Village of Batavia, Ohio, you need village zoning approval and a building permit from Clermont County Building Inspection before you build a house12. Septic permits come from Clermont County Public Health, and one must be issued before the building permit if the lot has no sewer3. Rules for land outside the village limits differ; see the Clermont County page.
At a glance
- Zoning
- Village of Batavia gives zoning approval; a copy goes to County Building Inspection1
- Building permit
- Required for single-family dwellings, issued through Clermont County Building Inspection2
- Septic
- Clermont County Public Health permit first, if no sewer3
- Sewer connection
- Clermont County Sewer District permit where sanitary sewer exists4
- Driveway
- Curb-cut permit before the building permit5
- Occupancy
- Certificate of occupancy required for new homes6
- RV, tiny home, ADU
- Not confirmed; ask the Village zoning office7
Who to call
Zoning
Village of Batavia Planning & Zoning
Village zoning approvals, zoning permit applications and code enforcement inside Batavia village limits
Building permits
Clermont County Building Inspection Department (Permit Central)
Building permit plan review and inspections for construction in Batavia village
2275 Bauer Road, Batavia, OH 45103
Septic permits
Clermont County Public Health (New Construction Septic Permits)
Septic plan review for new homes
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in Village of Batavia means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does the Village of Batavia have zoning?
Yes. Construction inside Batavia village limits needs zoning approval from the Village itself, and a copy of the Village zoning certificate or approval must be filed with Clermont County Building Inspection1. The Village's planning and zoning department oversees building and zoning permits, zoning verification and code enforcement7. Zoning applications can be submitted through the Village's own site.
We could not confirm Batavia's district map or its rules on RV living, tiny homes, accessory dwellings, minimum lot size, setbacks or building height. Call the Village zoning office before you buy or plan a build, and ask for the zoning district of the exact parcel.
Do you need a building permit in Batavia, Ohio, and who issues it?
Yes. Single-family dwellings, additions, driveways, septic installations and sewer tap-ins are all on the list of projects that need a permit inside Batavia village2. Clermont County Building Inspection administers these permits, and the county says it regulates the Ohio Building Code and the Residential Code of Ohio in most incorporated areas8.
Zoning approval from the Village is required for structures in the Village, and the application needs a Village zoning permit or approval letter showing the parcel number and address9. Plan submittal is digital. The county's goal for residential plan review is 10 to 15 business days10.
An agricultural structure can avoid the building permit if the Village's zoning approval letter designates it for agricultural use and it is not primarily retail or commercial11.
How do septic permits work in Batavia?
Septic permits for every address in Clermont County, village or not, come from Clermont County Public Health12. If the lot will have on-site sewage disposal, the Health District permit must be issued before the building permit is granted or construction begins3. Public Health must review and approve plans before construction13.
Where sanitary sewer is available, the path differs: a sewer and water permit from the Clermont County Sewer District is required before the building permit can issue4. We did not find a Village-wide rule on how close sewer must be before connection is mandatory, so ask the Sewer District about the specific lot.
Driveways need a curb-cut permit before the building permit5.
Building a home in Batavia: the steps, in order
- Ask the Village zoning office (Planning & Zoning) which district the parcel is in and what it allows7.
- Get Village zoning approval or a zoning permit and keep the approval letter9.
- If there is no sewer, apply to Clermont County Public Health for the septic permit and a private water application313. If there is sewer, get the Sewer District's sewer and water permit4.
- Get the driveway curb-cut permit5.
- Submit plans to Clermont County Building Inspection and get the building permit2.
- Call for each inspection when its stage of construction is complete14.
- Pass the final inspections and receive the certificate of occupancy before anyone moves in6.
What stays with Clermont County, and what to check before you buy
Septic permits and plumbing inspections stay with Clermont County Public Health, and building permits run through the county's Building Inspection office32. For land outside village limits, the township or county rules apply, so read the Clermont County page instead.
Clermont County's effective property tax rate is about 1.3%15, and its median property tax bill is about $3,141 per year16. Special flood hazard areas in the county need floodplain approval for any work17; we could not confirm a Village-specific floodplain administrator, so ask the Village and County Building Inspection about the parcel.
Watch-outs
- We could not confirm whether the Village allows RVs, tiny homes, accessory dwellings or short-term rentals; ask the Village zoning office before relying on any of them.7
- We could not confirm Batavia's minimum lot size, setbacks or height limits; request the zoning district rules for your parcel from the Village zoning office.7
- The county says its Building Inspection Department covers most, not every, incorporated area of Clermont County, so confirm with Building Inspection that Batavia village is covered for your project8.
- Private wells inside the village: we could not confirm a current rule, so ask Clermont County Public Health.13
Sources
- Permit Central/Building Inspection - Zoning (Village of Batavia), quoted and re-checked
- Permit Central/Building Inspection - Frequently Asked Questions (Village of Batavia), quoted and re-checked
- Permit Central/Building Inspection - Frequently Asked Questions (Village of Batavia), quoted and re-checked
- Permit Central/Building Inspection - Frequently Asked Questions (Village of Batavia), quoted and re-checked
- Permit Central/Building Inspection - Frequently Asked Questions (Village of Batavia), quoted and re-checked
- Permit Central/Building Inspection - Frequently Asked Questions (Village of Batavia), quoted and re-checked
- Village of Batavia Planning & Zoning (bataviaoh.gov)
- Permit Central/Building Inspection - Building Activity Reports (Village of Batavia), quoted and re-checked
- Permit Central/Building Inspection - Frequently Asked Questions (Village of Batavia), quoted and re-checked
- Clermont County Building Inspection Department (Permit Central) (permit.clermontcountyohio.gov)
- Permit Central/Building Inspection - Frequently Asked Questions (Village of Batavia), quoted and re-checked
- Clermont County Public Health - Septic Systems, quoted and re-checked
- Clermont County Public Health (New Construction Septic Permits) (clermonthealthohio.gov)
- Permit Central/Building Inspection - Frequently Asked Questions (Village of Batavia), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- Flood Regulations, quoted and re-checked
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.