The Village of Centerburg, Ohio (Knox County) runs its own zoning, with districts set by the village code and approvals handled by the village zoning administrator12. Whether the village issues its own building permits is not confirmed, so ask Village Hall before you plan a build. Septic systems must meet local and state Board of Health rules, and the Knox County Health Department handles septic and well permits in unincorporated Knox County34.
At a glance
- Zoning
- Village zoning code with named districts (R-1, R-2, CC, VC and others)5
- Zoning office
- Village of Centerburg zoning administrator2
- Building permit
- Fee schedule exists; general permit rule not confirmed. Ask Village Hall6
- Permit fee (new home)
- $0.40 per square foot, $100 minimum6
- Septic
- Must meet local and state Board of Health rules where sewer is unavailable3
- Public sewer
- Connection required once sewer is within 200 feet7
- R-1 minimum lot
- 10,000 square feet8
- Travel trailers / mobile homes
- Do not qualify as permanently sited manufactured homes9
Who to call
Zoning
Village of Centerburg Zoning Administrator
Zoning approvals, zoning inspections and zoning maps inside Centerburg village limits
49 1/2 East Main Street, Centerburg, OH 43011
Septic permits
Knox County Health Department (Knox Public Health), Environmental Health Division
Site evaluations, septic permits and well permits for unincorporated Knox County; ask whether a village lot follows the same steps
11660 Upper Gilchrist Road, Mount Vernon, OH 43050
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in Village of Centerburg means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Centerburg, Ohio have zoning, and what does it mean for your lot?
Yes. The Village of Centerburg adopted its own zoning code, which establishes zoning districts for land inside village limits1. The districts include ER, R-1, R-2, R-3, CC, VC, RO, ID, P-I and PD5. Rules differ by district, so find your parcel's district first; the village zoning administrator can tell you2.
In the R-1 Single-Family Residential District, the minimum lot area is 10,000 square feet, with a minimum width of 100 feet on a corner lot and 80 feet on other lots, and a minimum depth of 125 feet8. Setbacks are also set district by district and cannot be reduced below the district dimensions except for nonconforming structures or variances10.
We could not confirm Centerburg's rules for tiny homes, minimum dwelling size, lot coverage or building height. Ask the zoning administrator before you buy.
Do you need a building permit in Centerburg, and who issues it?
Centerburg publishes a fee schedule for building and zoning permits inside village limits, so permits of some kind are part of building here6. We could not confirm the village's general rule on which projects need a building permit, or whether the village runs its own certified building department. Call Village Hall to ask2.
Under Ohio law, an owner must submit plans to the municipal, township or county building department that has jurisdiction before starting construction on covered buildings11. The zoning administrator handles zoning approvals regardless: the village's own page says to contact the zoning office for proper approval of a project2.
Knox County's 'Steps Required to Build a Home' checklist covers unincorporated Knox County only, so its township zoning and county steps do not describe a lot inside Centerburg12.
What does a building permit cost in Centerburg?
Centerburg charges $0.40 per square foot for residential new construction and additions, counting living space and roofed porches, with a minimum permit fee of $1006. The schedule was adopted by Ordinance 2023-26 in October 2023, and commercial applicants also pay legal and engineering fees6. Confirm the current amount with the village office before you budget.
How do septic permits and sewer connection work in Centerburg?
Where public sanitary sewer is not available, a Centerburg building sewer may connect to a private system that complies with the local and state Boards of Health3. The owner must keep a private system running in a sanitary manner at no expense to the village13.
Where the village sewer is available, connection is required: sewer counts as accessible when it lies within 200 feet of the dwelling, and connection is generally due within 2 years of accessibility7.
Ohio requires a board of health permit to install a sewage treatment system, after a site review that includes a soil evaluation and a system design14. In unincorporated Knox County, the Knox County Health Department issues septic and well permits4. The village code does not say which office issues septic permits for a lot inside Centerburg, so call the health department to confirm15. Knox County soils rarely rate as well suited to a conventional drain field, so expect a site evaluation and possibly an engineered system16.
Can you live in an RV or tiny home in Centerburg?
We could not confirm a Centerburg rule on living in an RV, camping on private land, or occupying a tiny home. Ask the zoning administrator before parking an RV on a lot2.
One rule is clear for manufactured housing: a home must meet Ohio's definition of a permanently sited manufactured home and comply with the single-family zoning requirements of its district. Travel trailers, park trailers and mobile homes do not qualify and are prohibited as permanently sited manufactured homes9. Ohio's campground rules for licensed campgrounds do not answer whether you can live in an RV on your own lot17.
Building a home in Centerburg: the steps, in order
- Ask the village zoning administrator which district your parcel is in and what approvals your project needs2.
- Confirm with Village Hall whether the village issues the building permit, and what the fee will be6.
- Check whether public sewer is within 200 feet; if so, plan to connect7.
- If sewer is unavailable, contact the Knox County Health Department for a site evaluation and septic and well permits15.
- If the lot is in a mapped flood hazard area, the Floodplain Administrator must approve or disapprove a complete application within 30 days18.
- Ask Village Hall about driveway and curb-cut rules, which we could not confirm.
What stays with Knox County, and what to check before you buy
Knox County rules for unincorporated land do not apply inside Centerburg. For land outside village limits, see the Knox County page19.
County-level numbers: Knox County's effective property tax rate is 1.1%20, with a median property tax bill of $2,345 a year21. Farmland averages $7,956 an acre22. The nearest city of 100,000 or more is about 42 miles from the county center23.
Before you buy, confirm the parcel's zoning district, sewer availability, flood status, and which office issues septic and well permits for the lot.
Watch-outs
- We could not confirm whether the Village of Centerburg runs its own building department or what triggers a building permit; call Village Hall at the zoning office before you buy or build6.
- Public sewer within 200 feet of a dwelling is treated as accessible, and connection is generally due within 2 years7.
- Travel trailers and mobile homes cannot qualify as permanently sited manufactured homes inside village limits9.
- Fee amounts come from a schedule adopted in October 2023, so confirm current fees with the village6.
Sources
- 1105.02 Establishment of Zoning Districts (Village of Centerburg), quoted and re-checked
- Village of Centerburg Zoning Administrator (centerburgoh.org)
- 921.03 Private Sewage Disposal Systems and Required Connection to Public System (Village of Centerburg), quoted and re-checked
- Steps Required to Build a Home, quoted and re-checked
- 1105.02 Establishment of Zoning Districts (Village of Centerburg), quoted and re-checked
- 1307.01 Schedule of Fees (Village of Centerburg), quoted and re-checked
- 921.03 Private Sewage Disposal Systems and Required Connection to Public System (Village of Centerburg), quoted and re-checked
- 1111.01 Lot and Principal Building Regulations (Village of Centerburg), quoted and re-checked
- codelibrary.amlegal.com (Village of Centerburg), quoted and re-checked
- codelibrary.amlegal.com (Village of Centerburg), quoted and re-checked
- Section 3791.04 | Submission of plan - approvals - prohibition - fine (Ohio statewide rule), quoted and re-checked
- Steps Required to Build a Home, quoted and re-checked
- 921.03 Private Sewage Disposal Systems and Required Connection to Public System (Village of Centerburg), quoted and re-checked
- Rule 3701-29-09 | Site review and permits for STS installation and operation (Ohio statewide rule), quoted and re-checked
- Knox County Health Department (Knox Public Health), Environmental Health Division (co.knox.oh.us)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Rule 3701-26-04 | Campground requirements (Ohio statewide rule), quoted and re-checked
- codelibrary.amlegal.com (Village of Centerburg), quoted and re-checked
- STEPS REQUIRED TO BUILD A HOME, quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- Farmland value per acre (USDA census): Bolthole Index county data
- Straight-line distance from the county center to the nearest city of 100,000+ people: Bolthole Index county data
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.