Unincorporated Licking County, Ohio requires building permits for new homes, additions and specified residential alterations from the county Building Code Department, which covers most but not necessarily all of the county12. Zoning is set by each township: 19 of 25 are zoned and 6 are not3. Septic and well permits come from the Licking County Health Department45.
At a glance
- Building permit
- Required for new homes, additions and specified residential alterations in the county department's jurisdiction16
- Zoning
- Varies by township — 19 of 25 townships are zoned and 6 are un-zoned7
- Septic permits
- Installation and operating permits required from the Licking County Health Department4
- Owner-builder
- May do the work, but must submit plans and obtain approval before construction8
- Private water
- Health Department permit required before installing or altering a well or other private water system5
- Ag buildings
- Exempt from state building-code review once a township or county zoning inspector certifies agricultural use9
- Road frontage
- Classified collectors and arterials require future right-of-way reservations; township building setbacks also apply1011
Who to call
Building permits
Licking County Building Code Department
Building permits and construction-document review for the certified residential and commercial jurisdiction of Licking County
675 Price Road, Newark, OH 43055
Planning & zoning
Licking County Planning and Development
Directs landowners to the correct township zoning inspector; zoning in Licking County is prepared and enforced by each township, not by the county
20 South Second Street, Newark, OH 43055
Septic permits
Licking County Health Department (Sewage Treatment Program)
Household sewage treatment system permits, inspections and lot-split site review for areas not served by public water and sewer
675 Price Road, Newark, OH 43055
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Licking County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Licking County, Ohio?
In the Licking County Building Code Department's jurisdiction, new dwellings and additions need permits; detached garages, sheds and carports over 200 square feet also need permits1. A deck needs a permit when it is attached, exceeds 200 square feet, rises more than 30 inches above grade or serves the main entry1. The county department covers most, but not necessarily all, of Licking County, so confirm which building department serves the parcel and whether the specific work needs approval26. Before county submission, obtain a zoning certificate from the local zoning inspector, or Health Department approval where the township has no zoning12. An owner-builder may perform the work, but must submit plans and obtain approval before construction begins8. A regulated residential building cannot be used or occupied until the building official issues a certificate of occupancy or completion13.
Who issues building permits in Licking County, and how do you reach them?
The Licking County Building Code Department at 675 Price Road in Newark handles building permits and construction-document review in its jurisdiction12. A submission requires the completed application, a zoning certificate or Health Department approval where there is no zoning, and two complete sets of plans and specifications14. The county publishes applications, checklists, procedures and a fee schedule online15. The published residential schedule lists a $41.25 structural base fee plus $22 per 100 square feet for new construction, additions and accessory structures, plus applicable charges, but its date is old; request a current calculation before paying16. The department reviews documents for code compliance12. Building permits come from the county department, but zoning approval comes from the township and septic and well permits from the Licking County Health Department1718. Planning and Development can direct a landowner to the correct township zoning inspector, but the township handles its own zoning documents and enforcement19.
Does Licking County have zoning, and what does it mean for setbacks and lot size?
In unincorporated Licking County, 19 of 25 townships are zoned and 6 are un-zoned; each township prepares and enforces its own zoning documents73. The county publishes township zoning categories online, but the map service does not replace township resolutions and maps2021. Eden, Fallsbury, Hanover, Hopewell, Mary Ann and Perry are listed as un-zoned21. Reynoldsburg, mainly in Franklin County but extending into Licking County, administers its own city zoning; household septic remains with the Licking County Health Department2218.
Licking Township's Residential District requires at least 1,000 square feet of gross ground-floor dwelling area and a minimum 20-foot smaller dimension23. Single-family lots generally need 1.6 acres with individual sewer or water facilities, or 20,000 square feet with qualifying community sewer and water service; certain older lots have an exception24. Licking Township residential setbacks generally require 30 feet from the road right-of-way sideline, 10 feet on each side and 15 feet at the rear; corner-lot side-street clearance is at least 20 feet, and accessory structures must be at least 20 feet from a dwelling11. Confirm exceptions and the right-of-way boundary with the township inspector; these dimensions do not apply throughout Licking County11.
Who issues septic permits in Licking County, and how do they work?
The Licking County Health Department administers permitting and inspections for household and small-flow sewage treatment systems in Licking County25. Septic permits for Licking County come from the Health Department, not the township or the Building Code Department26. Obtain both an installation permit and an operating permit before installing a system, and note that the permit is valid for 1 year from the date issued4. The installer must schedule an inspection before backfilling, and noncompliant items require reinspection for system approval2728. New systems receive a follow-up inspection 12 months after completion; off-lot discharging and drip-irrigation systems are inspected annually, while soil-absorption systems are inspected every 5 years2729. Start with a site evaluation because not every lot can support an on-lot system30. Only 3.6% of county soils are rated without severe limits for a conventional drain field, so do not assume a conventional layout will pass31. A Health Department permit is also required before installing or altering a well, cistern, hauled-water tank or drinking-water pond5.
Can you live in an RV or tiny home on your land in Licking County?
We could not confirm one countywide rule allowing RV or tiny-home occupancy on a private parcel. The practical answer begins with the parcel's township zoning inspector because township zoning varies, and a city or village may have separate municipal zoning3. Ask specifically about using an RV during construction, time limits, utility connections, minimum dwelling size and whether a tiny home is treated as a dwelling, accessory structure or vehicle. Ohio's campground rule regulates vehicle placement, density and sanitation in licensed campgrounds, but it does not answer residential RV occupancy on an individually owned parcel32. A manufactured home generally cannot be occupied until an inspector issues its installation seal, subject to the temporary-occupancy exception33. Any private septic or water system still needs the applicable Health Department permits45.
What are the steps to build a home in Licking County, in order?
- Identify the township and ask Planning and Development which zoning inspector serves the parcel19.
- Obtain the township zoning certificate, or Health Department approval where there is no zoning14.
- Arrange the sewage site review early because not every lot can support an on-lot system34.
- Obtain sewage installation and operating permits, plus a private-water permit if the project needs a well or another private supply3435.
- Submit the building application, prior approval and two complete plan sets to the Building Code Department14.
- Confirm the current local fee and inspection schedule before work begins; Ohio requires inspections of regulated work after plan approval3637.
- Keep the sewage system open for inspection before backfilling, complete later maintenance inspections and obtain final residential occupancy or completion approval before moving in2913.
What should you check before you buy land in Licking County?
Confirm the parcel's township and incorporated status because zoning jurisdiction changes by location3. Make an offer contingent on acceptable sewage and water results when those systems matter: only 3.6% of county soils are rated without severe limits for a conventional drain field, and the Health Department warns that not every lot can support an on-lot system3130. Ask whether public sewer is accessible; Ohio can require connection when capacity and distance conditions are met38. Verify legal road access and ask the road authority whether driveway approval applies, because we could not confirm a general county-road rule. Licking County regulates subdivisions and other parcel-creating land divisions in unincorporated areas, with separate procedures for qualifying minor divisions3940. Planning and Development administers the county subdivision rules, and the Health Department reviews proposed lots without public water and sewer for sewage feasibility4142. For properties abutting classified collectors and arterials, Licking County also reserves future road right-of-way: 6 feet per side for minor collectors, 20 for major collectors and 30 for arterials, based on an existing 60-foot right-of-way; a narrower or absent right-of-way requires additional reservation10. These reservations differ from township building-yard setbacks; ask Planning and Development to identify the road classification and applicable reservation before choosing a home site10.
Watch-outs
- The published county fee schedule is dated 2013 and may not be current; ask the Building Code Department for the current total before submitting payment43.
- An owner-builder still must submit plans and obtain approval before beginning regulated construction8.
- We could not confirm a parcel-wide answer for RV or tiny-home occupancy; ask the township zoning inspector or the applicable city or village zoning office3.
Sources
- Summary of residential work that does or does not require approval, quoted and re-checked
- Building Code, quoted and re-checked
- Township & Zoning Info, quoted and re-checked
- Sewage Treatment Program, quoted and re-checked
- lickingcohealth.org, quoted and re-checked
- Building Code, quoted and re-checked
- Township & Zoning Info, quoted and re-checked
- Section 3791.04 | Submission of plan - approvals - prohibition - fine (2026 county census)
- Section 3781.06 | Public buildings to be safe and sanitary - definitions (Ohio statewide rule), quoted and re-checked
- Licking County Access Management Regulations, quoted and re-checked
- Licking Township Zoning Resolution, quoted and re-checked
- Licking County Building Code Department (lickingcounty.gov)
- Ohio Residential Code, Section 111, quoted and re-checked
- Licking County Planning Commission, quoted and re-checked
- Licking County Planning Commission, quoted and re-checked
- Building Permit Fee Schedule, quoted and re-checked
- Township & Zoning Info, quoted and re-checked
- Sewage Treatment Program, quoted and re-checked
- Licking County Planning and Development (lickingcounty.gov)
- Planning/Zoning MapServer, quoted and re-checked
- Planning/Zoning Feature Service, quoted and re-checked
- Reynoldsburg: Development Department | Reynoldsburg, OH (Licking County), quoted and re-checked
- Licking Township Zoning Resolution, quoted and re-checked
- Licking Township Zoning Resolution, quoted and re-checked
- Sewage Treatment Program, quoted and re-checked
- Sewage Treatment Program, quoted and re-checked
- Sewage Treatment Program, quoted and re-checked
- Sewage Treatment System Permit Administrative Summary, quoted and re-checked
- Sewage Treatment Program, quoted and re-checked
- Licking County Health Department (Sewage Treatment Program) (lickingcohealth.org)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Rule 3701-26-04 | Campground requirements (Ohio statewide rule), quoted and re-checked
- Chapter 4781-7 | Manufactured home inspections (Ohio statewide rule), quoted and re-checked
- Sewage Treatment Program, quoted and re-checked
- lickingcohealth.org, quoted and re-checked
- Chapter 4101:7-7 | Fees (Ohio statewide rule), quoted and re-checked
- Rule 4101:7-3-02 | Building department personnel duties and responsibilities (Ohio statewide rule), quoted and re-checked
- Rule 3745-42-07 | Best available technology for connection into sanitary sewers and centralized collection and treatment (Ohio statewide rule), quoted and re-checked
- Licking County Subdivision Regulations, quoted and re-checked
- Licking County Planning Commission, quoted and re-checked
- Planning & Development, quoted and re-checked
- Planning & Development, quoted and re-checked
- Applications, Forms, and Handouts, quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.