The Village of Paulding, Ohio requires a village building permit before work starts on a building or excavation inside village limits1. The village also sets its own zoning, with a residential schedule for lots, yards and dwelling size2. Septic permits are different: where public sewer is not available, the Paulding County Board of Health issues them3.
At a glance
- Building permit
- Required from the village Building Department before work starts1
- Zoning
- Village zoning with residential, mobile home, business, industrial and flood plain districts2
- Septic
- County Board of Health permit, only where public sewer is not within 125 feet3
- RV living
- Residential use limited to ten days in any six-month period4
- Minimum home size (R-1)
- 900 sq ft ground floor for a one-story home with a basement5
- R-1 lot
- 9,500 sq ft minimum, 70 ft wide6
- Certificate of occupancy
- Required before occupying a new or altered building7
Who to call
Building permits
Village of Paulding (zoning and building permits)
Zoning information, the zoning map and the building permit application for property inside the village
116 S. Main St Paulding, OH 45879
Septic permits
Paulding County Health Department
Site evaluation review and permits for household, small-flow and gray-water sewage treatment systems, including for addresses inside Paulding
800 East Perry St. Paulding, OH 45879
Contact details are copied from each office’s official page and were checked against it on October 23, 2026.
Off-grid gear
Going off-grid in Village of Paulding means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does the Village of Paulding, Ohio have zoning?
Yes. The Village of Paulding publishes zoning chapters for residential, mobile home, business, industrial and flood plain districts2. Rules differ by district, so the first step is to find your parcel's district on the village zoning map8.
In the R-1 single-family district, a one-family dwelling needs at least 9,500 square feet of lot area and a lot width of 70 feet6. Required yards in R-1 are 40 feet in front, 10 feet on the side and 30 feet in the rear, and the main building may rise two stories910. Accessory living accommodations are listed as an R-1 accessory use11, and rooms for tourists are listed in R-212.
Minimum dwelling size applies too: a one-story home with a basement needs 900 square feet of ground floor, and one without a basement needs 1,0005. We could not confirm a lot-coverage limit or any tiny-home rule; ask the village zoning office at (419) 399-40118.
Do you need a building permit in the Village of Paulding, and who issues it?
Inside Paulding village limits, excavation for buildings and the erection, alteration or moving of buildings requires a building permit applied for and issued by the village Building Department before work starts1. When a development plan is required, the Planning Commission approves it before the permit issues1.
The village zoning page links the building permit application and the zoning map8. Call the village office at (419) 399-4011 or visit 116 S. Main St8.
After the work, a certificate of occupancy is required before anyone occupies a new building or one that has been altered or moved7. It issues only after inspection finds the work conforms to the village zoning chapter and Building Code13. The village code also adopts the IPMC property maintenance code, which does not by itself establish a full construction code14.
How do septic permits work inside the Village of Paulding?
Where a public sanitary or combined sewer is not available within 125 feet of the property line, a building inside Paulding must use a private sewage system that meets Paulding County Board of Health rules15. Before construction, the owner must get a written permit from the County Board of Health, not from the village3.
The Paulding County Health Department handles household, small-flow and gray-water systems for the county16. It requires a site evaluation approved before an installation permit issues, and it does not perform soil evaluations itself17. Conventional drain fields can be a challenge: USDA rates 0% of Paulding County soils as not limited for them, so expect an engineered system or a careful site evaluation18.
If village sewer later reaches a property on a private system, the owner must connect within 90 days19. We could not confirm a village well permit rule; the county health department is the office to ask about private water systems20.
Can you live in an RV or camper in the Village of Paulding?
Only briefly. Village code does not permit a camper, motor home or recreational vehicle to be used for residential or dwelling purposes for more than ten days in any six-month period4. For any consecutive period of use, written notice must go to the village office within 72 hours after residence begins4.
The same ten-day limit covers tents, sheds and other outbuildings used as a residence21. Long-term RV living is therefore not an option on a lot inside the village. Land outside village limits follows township or county rules, so see the Paulding County page for those.
Building a home in the Village of Paulding: the steps, in order
- Confirm the parcel's zoning district with the village zoning office, (419) 399-40118.
- Check that lot area, width, yards and dwelling size meet the district schedule; R-1 requires 9,500 square feet of lot area6.
- If sewer is not within 125 feet of the property line, get the site evaluation and a written septic permit from the Paulding County Health Department317.
- Apply for the village building permit; plan approval by the Planning Commission comes first when a plan is required1.
- Request inspection and apply for the certificate of occupancy before moving in7.
If you are connecting to village sewer, a sewer permit and inspection fee of $15 is due when the application is filed, plus the applicable tap fee22.
What stays with Paulding County, and what to check before you buy
The county decides septic and private water systems for addresses inside the village1520. Ohio's state building code also applies statewide23. Land outside village limits is a different question: Paulding County's building permits are handled township by township and village by village24. See the Paulding County page for unincorporated land.
Before you buy inside Paulding, confirm the zoning district, whether public sewer is within 125 feet of the lot line3, and whether the village has any floodplain rules for the parcel; the village code lists flood plain districts2, but we could not confirm the operative flood rules. Paulding County's effective property tax rate is about 1.1%25.
Watch-outs
- Sewer availability decides everything about septic: a private system is allowed inside Paulding only where public sewer is not within 125 feet of the property line, and the owner must connect within 90 days once sewer arrives19.
- The ten-day RV limit means a camper cannot serve as a home while you build inside the village4.
- We could not confirm village rules for tiny homes, manufactured homes, lot coverage, driveways or floodplain development; ask the village office at (419) 399-4011 before you commit8.
- Village rules stop at the village limits; rules for land outside the village come from the township or county26.
Sources
- Paulding Code § 155.50 Administrative Procedures (Village of Paulding), quoted and re-checked
- Paulding, Ohio Code of Ordinances, Chapter 155: Zoning (Village of Paulding), quoted and re-checked
- Paulding Code § 52.24 Private Sewage Disposal (Village of Paulding), quoted and re-checked
- Paulding Code § 150.080 Prohibited (Village of Paulding), quoted and re-checked
- Paulding Code § 155.15 Residential Districts (Village of Paulding), quoted and re-checked
- Paulding Code § 155.15 Residential Districts (Village of Paulding), quoted and re-checked
- Paulding Code § 155.50 Administrative Procedures (Village of Paulding), quoted and re-checked
- Village of Paulding (zoning and building permits) (villageofpaulding.com)
- Paulding Code § 155.15 Residential Districts (Village of Paulding), quoted and re-checked
- Paulding Code § 155.15 Residential Districts (Village of Paulding), quoted and re-checked
- Paulding Code § 155.15 Residential Districts (Village of Paulding), quoted and re-checked
- Paulding Code § 155.15 Residential Districts (Village of Paulding), quoted and re-checked
- Paulding Code § 155.50 Administrative Procedures (Village of Paulding), quoted and re-checked
- Paulding Code of Ordinances, Chapter 150: Building Regulations (Village of Paulding), quoted and re-checked
- Paulding Code § 52.24 Private Sewage Disposal (Village of Paulding), quoted and re-checked
- Sewage Treatment Systems, quoted and re-checked
- Paulding County Health Department (pauldingcountyhealth.com)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Paulding Code § 52.24 Private Sewage Disposal (Village of Paulding), quoted and re-checked
- Private Water Systems, quoted and re-checked
- Paulding Code § 150.080 Prohibited (Village of Paulding), quoted and re-checked
- Paulding Code § 52.26 Building Sewers and Connections (Village of Paulding), quoted and re-checked
- Section 3781.10 | Board of building standards - powers and duties (Ohio statewide rule), quoted and re-checked
- General Information - Building Permits, quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Building Permits, quoted and re-checked
Written October 23, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.