Rockaway Beach, Oregon sets and administers its own zoning, and the city planning department issues zoning permits and floodplain development permits1. Building permits for projects in the city are handled by Tillamook County under an agreement with the city1. Septic permits are a Tillamook County function carried out under contract with Oregon DEQ2; whether they apply inside city limits we could not confirm.
At a glance
- Zoning
- Yes, the city has its own zoning ordinance and planning department31
- Zoning permits
- Issued by the city planning department1
- Building permits
- Handled by Tillamook County under an agreement with the city1
- Minimum lot, R-1 zone
- 5,000 sq ft for lots platted after Ordinance 235; 3,500 sq ft for older lots4
- Height, R-1 single unit
- 20 ft oceanfront, 24 ft elsewhere, 29 ft east of Highway 1015
- Septic
- Tillamook County, as Oregon DEQ's agent (city-limits detail unconfirmed)2
- Owner-builder
- Oregon allows owner-built dwellings, with a building permit still required6
Who to call
Planning & zoning
City of Rockaway Beach Planning Department
Zoning administration, zoning permits and floodplain development permits inside city limits
276 Hwy 101 S. Rockaway Beach, OR 97136
Building permits
Tillamook County Department of Community Development - Building Division
Building-permit applications, plan review and inspections
1510-B Third Street, Tillamook, OR 97141
Septic permits
Tillamook County Community Development - Onsite Wastewater/Environmental Programs Division
Site evaluations and permits for new and repaired onsite wastewater systems
1510-B Third Street, Tillamook, OR 97141
Contact details are copied from each office’s official page and were checked against it on October 14, 2026.
Off-grid gear
Going off-grid in Rockaway Beach means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Rockaway Beach, Oregon have zoning, and what does it mean for lot size and setbacks?
Yes. Rockaway Beach has its own zoning ordinance with R-1, R-2, R-R, R-3 and RMD residential zones plus commercial and overlay zones, administered by the city planning department3. The ordinance is the city's, not Tillamook County's, so the county's rules for unincorporated land do not govern a lot inside city limits.
In the R-1 single-family zone, single unit dwellings and duplexes need a 5,000 square foot lot if platted after Ordinance 235, while lots that existed at its 1985 adoption can be 3,500 square feet4. Yards are 15 feet in front, 5 feet on the side (15 feet on the street side of a corner lot)7. At least 30% of an R-1 lot must stay in natural vegetation or landscaping8. Single unit dwellings top out at 20 feet oceanfront and 24 feet elsewhere, except 29 feet east of Highway 1015. Other zones have their own numbers; ask the city planner which zone a parcel is in.
Do you need a building permit in Rockaway Beach, and who issues it?
Rockaway Beach has an intergovernmental agreement with Tillamook County for building permit services, so the county's Building Division is the office that handles building permits for work inside the city1. Tillamook County requires permits for new construction and for alterations and additions, covering structural, plumbing, mechanical and electrical work9.
The city planning department separately issues zoning permits and floodplain development permits1. Tillamook County's own page says that for properties in listed cities, an approved zoning permit must accompany the building-permit submission10. Plan on getting city zoning sign-off first, then applying to the county. We could not confirm the city's own building code chapter, so confirm details with the county Building Division11.
How do septic permits work in Rockaway Beach?
Tillamook County administers septic requirements under a contract with the Oregon Department of Environmental Quality2. A new septic system needs a completed application, a fee and a favorable site evaluation, and processing takes at least two weeks12. Where a municipal sewer system is available the building must connect to it instead of using a septic system13.
We could not confirm which parts of Rockaway Beach are on city sewer, or whether the city handles any sewer connection approvals itself. Before you buy, ask the city and the county onsite wastewater division14 whether a given lot is sewered or needs a septic site evaluation.
Can you live in an RV or tiny home in Rockaway Beach?
We could not confirm the city's rule for living in an RV or tiny home on an individual lot. The city's zoning ordinance lists RV parks and manufactured dwelling parks as conditional uses in some zones, but the single-lot rule was not confirmed. Ask the Planning Department at (503) 374-1752 before you plan around it1.
Tillamook County's RV placement rules are for land under county jurisdiction, not city lots15.
Building a home in Rockaway Beach: the steps, in order
- Ask the city Planning Department which zone the lot is in and what lot size, setbacks and height apply1.
- Check whether the lot is on city sewer or needs a septic site evaluation from Tillamook County12.
- Get the city zoning permit; floodplain development permits also come from the city planning department1.
- Apply to the Tillamook County Building Division for the building permit, with the zoning permit attached10.
- Book inspections through the county; the first approved inspection must happen within 180 days of issuance or the permit expires10.
- Get a certificate of occupancy before moving in16.
What stays with Tillamook County, and what should you check before you buy?
Septic permits are a Tillamook County function2. Oregon's statewide owner-builder exemption covers only ceiling heights, room sizes and temperature maintenance, and a building permit is still needed6. A landowner who drills their own well needs a state permit with a $550 fee17.
For land outside Rockaway Beach city limits, use the Tillamook County page, because county rules apply only to unincorporated land. County figures: annual precipitation is about 101 inches18, the effective property tax rate is 0.6%19, and the typical home value is $512,93520.
Watch-outs
- Building permits for Rockaway Beach projects run through Tillamook County, but we could not confirm the city's own building code chapter, so confirm with the county Building Division before filing11.
- We could not confirm septic rules, sewer connection requirements, RV or tiny-home rules, or short-term rental rules inside city limits; ask the city Planning Department1.
- The lot, setback and height numbers above are for the R-1 zone; other zones differ, and an oceanfront lot has a lower height limit5.
Sources
- City of Rockaway Beach Planning Department (rockawaybeachoregon.gov)
- Tillamook County FAQs, quoted and re-checked
- City of Rockaway Beach Zoning Ordinance (as amended, city Document Center) (Rockaway Beach), quoted and re-checked
- City of Rockaway Beach Zoning Ordinance (as amended, city Document Center) (Rockaway Beach), quoted and re-checked
- City of Rockaway Beach Zoning Ordinance (as amended, city Document Center) (Rockaway Beach), quoted and re-checked
- 2023 Oregon Residential Specialty Code - ORS 455.320 reprinted (Oregon statewide rule), quoted and re-checked
- City of Rockaway Beach Zoning Ordinance (as amended, city Document Center) (Rockaway Beach), quoted and re-checked
- City of Rockaway Beach Zoning Ordinance (as amended, city Document Center) (Rockaway Beach), quoted and re-checked
- tillamookcounty.gov, quoted and re-checked
- Building, quoted and re-checked
- Tillamook County Department of Community Development - Building Division (tillamookcounty.gov)
- Instructions for Septic System Construction/Installation Permits, quoted and re-checked
- Housing and Onsite Wastewater Management, quoted and re-checked
- Tillamook County Community Development - Onsite Wastewater/Environmental Programs Division (tillamookcounty.gov)
- Tillamook County Land Use Ordinance Article 5, quoted and re-checked
- 2023 Oregon Residential Specialty Code - Chapter 1, quoted and re-checked
- Landowner Constructed Wells (Oregon statewide rule), quoted and re-checked
- Annual precipitation: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
- Typical home value (Zillow): Bolthole Index county data
Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.