Sherwood, Oregon requires a building permit for residential work inside city limits, and the City of Sherwood's Building Department handles it through the state's ePermitting system12. The city sets its own zoning, including the VLDR, LDR and MDR single-family districts3. Septic permits are a Washington County matter, and Sherwood's code expects sewer connections for new development45.
At a glance
- Building permit
- Required inside Sherwood city limits, with some exemptions1
- Who issues building permits
- City of Sherwood Building Department (electrical permits go through Washington County)12
- Zoning
- Sherwood sets its own zoning, including VLDR, LDR and MDR residential districts3
- Sewer or septic
- Sewer connection expected for new development; septic only when connection is impractical56
- Septic permits
- Washington County Environmental Health7
- Owner-builder
- State exemption from some structural-code requirements, with conditions8
- Accessory dwelling units
- Allowed where single-family homes are allowed, after Type I land-use review9
Who to call
Building permits
City of Sherwood Building Department
Residential and commercial building permits and inspections inside Sherwood city limits
22560 SW Pine St. Sherwood, OR 97140
Septic permits
Washington County Environmental Health (Onsite Sewage Program)
Septic system permits, site evaluations and inspections for properties not on public sewer
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in Sherwood means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Sherwood, Oregon?
Yes. Oregon requires a building permit to construct, enlarge, alter, repair or move a residential building inside Sherwood city limits1. Sherwood states that accessory structures below 200 square feet and below 12 feet average height do not need one1.
The permit comes with inspections. Sherwood residential work is inspected at each stage, and a new dwelling needs a certificate of occupancy (or a temporary one) before anyone moves in1011. Building fees are in section 10 of Sherwood's fee schedule, with system development charges listed separately12.
Electrical permits inside Sherwood are the exception: they are obtained through Washington County, not the city1.
Who issues building permits in Sherwood, and how do you reach them?
The City of Sherwood Building Department issues building permits for land inside Sherwood. The office is at 22560 SW Pine St. in Sherwood, and the main number is (503) 625-42262. Washington County Building Services, which handles unincorporated land, is the wrong counter for a Sherwood address.
Applications are paperless. Homeowners create an Oregon ePermitting account, upload the homeowner acknowledgment form and plans, and then wait for an email from Building Department staff when fees are ready and again when the permit is ready to issue13. Combination permits may need more than one permit13.
Does Sherwood have zoning, and what does it mean for RVs, tiny homes and setbacks?
Sherwood has its own zoning. The city's single-family residential districts are Very Low-Density Residential (VLDR), Low-Density Residential (LDR) and Medium Density Residential (MDR)3. Zoning rules are set by the City of Sherwood, not by Washington County.
Accessory dwelling units are allowed in Sherwood districts that permit single-family homes, and they go through Type I land-use review under section 16.52 of the city's development code9.
We could not confirm Sherwood's lot sizes, setbacks, height limits, lot coverage, minimum dwelling size, or whether RV, tiny-home or manufactured-home occupancy is allowed. Ask the City of Sherwood Building Department at (503) 625-42262 before you plan around any of these.
How do septic permits work inside Sherwood?
Sherwood expects sewer. The city's development code says sanitary sewers must be installed to serve all new developments and connect to existing mains5. A septic tank may be approved only when connecting to a trunk sewer is impractical, sealed future sewer laterals are installed, and the temporary system meets City, Clean Water Services, Washington County and State standards6.
Where septic is allowed, Washington County Environmental Health issues septic system permits for households not served by public sewer714. Permits cover new systems and repairs or alterations of existing septic tanks and drainfields15. A site evaluation does not guarantee approval, because a separate construction-installation permit is required4. The city does not take over septic permits from the county.
We could not confirm a Sherwood-specific septic inspection rule or private-well rule inside city limits; ask Environmental Health at 503-846-872214.
Can you live in an RV or tiny home on your land in Sherwood?
We could not confirm whether Sherwood allows living in an RV, camping on private land, or occupying a tiny home or manufactured home inside city limits. No Sherwood code provision on these uses was found. Ask the City of Sherwood Building Department at (503) 625-42262 before moving anything onto a Sherwood lot.
A permanent accessory dwelling unit is the route the city's code clearly provides, in districts that allow single-family homes9. Washington County's RV and tiny-home answers apply to unincorporated land only, not to addresses inside Sherwood.
Building a home in Sherwood: the steps, in order
- Confirm the zoning district for your lot and ask the city about lot size, setbacks and height, which we could not confirm3.
- Confirm sewer service. New development is expected to connect to the city sewer, and septic is the exception5.
- If septic is allowed, get a site evaluation and a construction-installation permit from Washington County Environmental Health414.
- Create an Oregon ePermitting account, upload the homeowner acknowledgment and plans, and pay fees when Building Department staff email you13.
- Order electrical permits through Washington County1.
- Schedule inspections at each stage and obtain a certificate of occupancy before moving in1011.
Owner-builders get a state exemption from structural-code requirements for ceiling heights, room sizes and specific temperature levels, not from permits. The owner must not have used the exemption in the preceding five years8.
What stays with Washington County, and what to check before you buy
Washington County keeps septic permits and electrical permits for Sherwood addresses71. For land outside city limits, the county's own rules apply; see the Washington County page.
County-level numbers give context: Washington County's effective property tax rate is 0.9% and the median property tax bill is $4852 a year1617. Washington County's typical home value is about $56857518. Only 2.2% of the county's soils are rated not limited for a conventional septic drain field, so a lot needing septic should expect a site evaluation and possibly an engineered system19.
We could not confirm Sherwood's rules on driveways, floodplain development, agricultural uses, subdivision or short-term rentals. Ask the Building Department before you buy2.
Watch-outs
- Sherwood's lot-size, setback, height, RV and tiny-home rules were not confirmed; call the City of Sherwood Building Department at (503) 625-4226 before buying2.
- Septic is the exception in Sherwood, not the default: new development is expected to connect to the sewer5.
- Electrical permits for Sherwood projects come from Washington County, not the city1.
- Washington County's unincorporated-land answers, such as its building services counter, do not apply inside Sherwood city limits3.
Sources
- About Oregon residential building permits (Sherwood), quoted and re-checked
- City of Sherwood Building Department (sherwoodoregon.gov)
- Residential Design Standards Code Update and Implementation of House Bill 2001 Housing Choices - City of Sherwood (Sherwood), quoted and re-checked
- Residential Septic Permitting - Oregon DEQ (Sherwood), quoted and re-checked
- Sherwood Zoning and Community Development Code, Division VI (Sherwood), quoted and re-checked
- Sherwood Zoning and Community Development Code, Division VI (Sherwood), quoted and re-checked
- Onsite Sewage, quoted and re-checked
- 2023 Oregon Residential Specialty Code, Chapter 1 (Sherwood), quoted and re-checked
- Residential Design Standards Code Update and Implementation of House Bill 2001 Housing Choices - City of Sherwood (Sherwood), quoted and re-checked
- Building - City of Sherwood (Sherwood), quoted and re-checked
- 2023 Oregon Residential Specialty Code, Chapter 1 (Sherwood), quoted and re-checked
- Building - City of Sherwood (Sherwood), quoted and re-checked
- Permitting Process - City of Sherwood (Sherwood), quoted and re-checked
- Washington County Environmental Health (Onsite Sewage Program) (washingtoncountyor.gov)
- Onsite Sewage Permits, quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- Typical home value (Zillow): Bolthole Index county data
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.