Bolthole Index

Chester County, Pennsylvania

Zoning, building permits and septic rules in Malvern Borough, Chester County, PA

Malvern Borough in Chester County, Pennsylvania has its own zoning ordinance, enacted under the state Municipalities Planning Code1. The borough's Building, Zoning & Code Enforcement office handles building permits and zoning applications2. Septic permits and well permits for on-lot systems come from the Chester County Health Department3.

At a glance

Zoning
Borough zoning ordinance (Chapter 220); the county does not zone inside Malvern1
Building permit
Required under Pennsylvania's Uniform Construction Code; the borough takes applications42
R1 minimum lot
1 acre, 150 feet wide at the building line5
R1 setbacks
75 ft front, 30 ft each side, 40 ft rear6
R1 coverage and height
7.5% building coverage, 20% lot coverage, 35 ft or three stories78
Septic and wells
Chester County Health Department permits39
Second dwelling in R1
Special exception from the zoning hearing board10

Who to call

Building permits

Borough of Malvern, Building, Zoning & Code Enforcement

Building permits, zoning permits and applications, inspections and code enforcement inside Malvern Borough

610.644.2602

malvern@malvern.org

1 East First Avenue, Suite 3, Malvern, PA 19355

Online permits →

Septic permits

Chester County Health Department

Permits for on-lot sewage disposal systems and wells

610-344-6225

601 Westtown Road, Suite 295, West Chester, PA 19380

Contact details are copied from each office’s official page and were checked against it on October 14, 2026.

Off-grid gear

Going off-grid in Borough of Malvern means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does Malvern, PA have zoning, and what does it mean for lot size and setbacks?

Yes. Malvern Borough adopted its own zoning ordinance under the Pennsylvania Municipalities Planning Code1, and Chester County does not zone inside the borough11.

Rules differ by district. In the R1 Residential District, the minimum lot is one acre and 150 feet wide at the building line5. Required yards in R1 are 75 feet in front, 30 feet on each side and 40 feet in the rear6. Buildings may cover 7.5% of an R1 lot and all paving and buildings together 20%7. Height is capped at three stories or 35 feet, whichever is less8. Other districts were not reviewed, so check your parcel's district with the borough before relying on these figures.

Do you need a building permit in Malvern, and who issues it?

Yes. Pennsylvania's Uniform Construction Code requires property owners to obtain a building permit before starting any work4, and the code applies statewide12. Inside Malvern Borough, applications go to the borough, whose permits page says you need a permit before you break ground2.

The borough's own code officer handles residential and commercial building permits, plus zoning permits2. We could not confirm the current fee schedule or which small projects are exempt; ask the borough office.

How do septic permits and wells work inside Malvern?

The Chester County Health Department, not the borough, issues permits for on-lot sewage systems and well construction in the county3. A septic permit is required for new systems, repairs or modifications13, and a well permit is required before installing, repairing or altering a well9.

Whether a given lot inside the borough connects to public sewer was not confirmed. Ask the borough office before assuming you need an on-lot system.

Can you live in an RV or tiny home in Malvern?

We could not confirm a rule for living in an RV, tiny home or manufactured home in Malvern Borough. The borough's residential use list does not mention RVs, but that is not the same as permission. A second dwelling unit in R1 is allowed only by special exception from the zoning hearing board10. Ask the borough's Building, Zoning & Code Enforcement office before buying for this purpose2.

Building a home in Malvern: the steps, in order

  1. Confirm your parcel's zoning district and its lot, setback and coverage rules with the borough2.
  2. Ask the borough whether the lot has public sewer; if not, get septic and well permits from the Chester County Health Department3.
  3. Submit the zoning permit and residential building permit applications to the borough, and pay the fee at submission2.
  4. Schedule inspections through the borough as work proceeds14.
  5. Obtain a certificate of occupancy before using the building15.

What stays with Chester County, and what to check before you buy in Malvern

Septic and well permits stay with the Chester County Health Department3. For land outside the borough, see the Chester County page; a Malvern mailing address does not mean a parcel is inside the borough, and its township sets different rules.

Countywide, typical home value is about $587,74716 and the effective property tax rate is 1.3%17. Those figures are for Chester County as a whole, not the borough.

Watch-outs

  • Rules in this guide for lots, setbacks and coverage are for the R1 district only5.
  • We could not confirm Malvern's permit fees, whether sewer connection is required, or any RV or tiny-home rule; call the borough office on 610.644.26022.

Sources

  1. Borough of Malvern Code, Chapter 220 Zoning, Article I (Borough of Malvern), quoted and re-checked
  2. Borough of Malvern, Building, Zoning & Code Enforcement (malvern.org)
  3. Sewage & Water, quoted and re-checked
  4. Apply for a Uniform Construction Code Building Permit, quoted and re-checked
  5. Borough of Malvern Code, Chapter 220 Zoning, Article IV R1 Residential District (Borough of Malvern), quoted and re-checked
  6. Borough of Malvern Code, Chapter 220 Zoning, Article IV R1 Residential District (Borough of Malvern), quoted and re-checked
  7. Borough of Malvern Code, Chapter 220 Zoning, Article IV R1 Residential District (Borough of Malvern), quoted and re-checked
  8. Borough of Malvern Code, Chapter 220 Zoning, Article IV R1 Residential District (Borough of Malvern), quoted and re-checked
  9. Chester County Health Department Rules and Regulations, quoted and re-checked
  10. Borough of Malvern Code, Chapter 220 Zoning, Article IV R1 Residential District (Borough of Malvern), quoted and re-checked
  11. Planning in Pennsylvania, quoted and re-checked
  12. Uniform Construction Code (UCC) (Pennsylvania statewide rule), quoted and re-checked
  13. Permits for On-Lot Sewage Disposal Systems, quoted and re-checked
  14. Apply for a Uniform Construction Code Building Permit, quoted and re-checked
  15. Apply for a Uniform Construction Code Building Permit, quoted and re-checked
  16. Typical home value (Zillow): Bolthole Index county data
  17. Effective property tax rate: Bolthole Index county data

Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Borough of Malvern

Borough of Malvern’s own rules

  • Local zoningPresent

    Land inside Malvern borough

    • Enacted under the Pennsylvania Municipalities Planning Code
    “the chapter shall be known and may be cited as the "borough of malvern zoning ordinance of 2003."”
  • Minimum lot sizeSpecified

    R1 Residential District, Malvern borough

    • Minimum lot width 150 feet at building line
    • Other districts not reviewed

    minimum lot area: >= 1 acre

    “a. minimum lot area: one acre. b. minimum lot width: 150 feet measured at the building line.”
  • SetbacksSpecified

    R1 Residential District, Malvern borough

    • Front yard amended 10-4-2016 by Ord. No. 2016-13

    front yard: >= 75 feet · each side yard: >= 30 feet · rear yard: >= 40 feet

    “c. front yard. shall be no less than 75 feet. [amended 10-4-2016 by ord. no. 2016-13] d. minimum side yard: on each lot there shall be two side yards, each having a width of not less than 30 feet. e. minimum rear yard: 40 feet.”
  • Lot coverageSpecified

    R1 Residential District, Malvern borough

    • Building coverage amended 6-16-2020 by Ord. No. 2020-5

    maximum building coverage: <= 7.5 percent · maximum lot coverage: <= 20 percent

    “f. maximum building coverage: 7.5%. [amended 6-16-2020 by ord. no. 2020-5] g. maximum lot coverage: 20%.”
  • Building heightSpecified

    R1 Residential District, Malvern borough

    • Whichever is less of three stories or 35 feet

    maximum height: <= 35 feet (or three stories, whichever is less)

    “h. maximum building height: three stories, or 35 feet, whichever is less.”
  • Accessory dwellingsLimited

    Supplemental dwelling unit in R1 Residential District, Malvern borough

    • Only upon special exception from the zoning hearing board
    • Subject to § 220-2401a(11) and Article XXVIII (not reviewed)
    “b. special exception uses. the following uses shall be permitted only upon the grant of a special exception from the zoning hearing board, subject to the terms of this article and of article xxviii: [...] (3) supplemental dwelling unit, as per § 220-2401a(11).”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Borough of Malvern or Chester County directly.

  • Building permit — Building permits in Malvern borough
  • Owner-builder exemption — Owner-builder exemption in Malvern borough
  • Building code adopted — Building code in Malvern borough
  • Inspections — Building inspections in Malvern borough
  • Certificate of occupancy — Certificate of occupancy in Malvern borough
18 more unanswered
  • Minimum dwelling size
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Borough of Malvern publishes no rule on the point, not that none exists. Chester County’s page lists the county offices to call.

← All of Chester County: county rules, score and offices