Upper Nazareth Township, in Northampton County, Pennsylvania, has its own zoning ordinance, and a zoning permit is required before a structure is built, placed or expanded12. Building permits under the state Uniform Construction Code are handled locally, and the township's Building & Zoning office is the first call3. We could not confirm who issues septic permits here, so ask the township office before you buy.
At a glance
- Zoning
- Township zoning ordinance applies to land in Upper Nazareth1
- Zoning permit
- Required before erecting, placing or expanding a structure2
- Building permit
- State Uniform Construction Code permit required; township office is the contact43
- Certificate of occupancy
- Required for new principal buildings5
- Septic
- Local agency issues on-lot permits under Act 537; confirm which one with the township67
- Driveway onto a state road
- PennDOT permit required8
- Subdivision
- Township subdivision ordinance applies; zoning approvals are conditioned on it9
Who to call
Building permits
Upper Nazareth Township Building & Zoning
Zoning ordinance and map, zoning permits and building permits inside Upper Nazareth Township
100 Newport Avenue, Nazareth, PA 18064
Contact details are copied from each office’s official page and were checked against it on October 14, 2026.
Off-grid gear
Going off-grid in Upper Nazareth Township means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Upper Nazareth Township, PA have zoning?
Yes. Upper Nazareth Township, Pennsylvania adopted its own zoning ordinance, and it governs land inside the township1. Northampton County does not zone this land: county zoning power in Pennsylvania reaches only municipalities that have no zoning ordinance of their own10.
Uses the township ordinance does not clearly permit send you to the ordinances of Chapman Borough or Lower Nazareth Township under multi-municipal planning1. Zoning approvals are also automatically conditioned on compliance with the township's subdivision and land development ordinance9.
We could not confirm lot sizes, setbacks, minimum dwelling size or the rules for RVs, tiny homes and manufactured homes in each district. Ask the township zoning officer, and read the ordinance and zoning map posted by the township3.
Do you need a building permit in Upper Nazareth Township?
Yes. A zoning permit must be issued before any structure or building is erected, constructed, moved, placed or expanded in Upper Nazareth Township2. The township may issue building and zoning permits together or separately2.
Building work is also subject to Pennsylvania's Uniform Construction Code, which requires a building permit before construction starts11. The township's own page lists new construction, additions, decks, driveways, sheds, fences and sewer or septic work among the work that needs a permit3.
A new principal building cannot be used or occupied until the township staff issue a certificate of occupancy5. Fees are set by the board of supervisors by resolution, and no application counts as filed until fees are paid12.
Who issues building and zoning permits in Upper Nazareth Township?
The Upper Nazareth Township Building & Zoning office issues them, and the township's zoning officer, who also acts as its building code officer, answers permit questions3. Applications for a zoning permit are made in writing on a township form or digitally as a PDF13.
A site plan is needed for new buildings and expansions, and a special exception or variance goes to the zoning hearing board, while a conditional use goes to the board of supervisors13.
The office also tells applicants to check property and lot deed restrictions before signing permit applications3. Call before you start any construction, because the township notes that requirements under the construction code keep changing3.
For land outside the township, see the Northampton County page.
How do septic permits work in Upper Nazareth Township?
Pennsylvania requires a permit from the local agency before a building served by an on-lot septic system is installed, built, occupied or used6. The local agency is a municipality, a group of municipalities, or a county health department, so the answer varies within Northampton County7.
The township's Building & Zoning page lists sewer or septic work among the work that needs a permit3. We could not confirm which agency employs the sewage enforcement officer for Upper Nazareth Township, or whether public sewer reaches a given lot. Ask the township office before you buy.
On a tract of 10 acres or more, a narrow exemption from the septic permit can apply to an owner's or immediate family's own residence, subject to owner-of-record date, notification and siting conditions6. Confirm any exemption with the local agency in writing.
Building a home in Upper Nazareth Township: the steps, in order
- Call the township Building & Zoning office and ask what the zoning district allows and which permits your project needs3.
- Check whether the project is a subdivision or land development, which brings in the township's subdivision ordinance9.
- Get septic approval from the local agency before building, or confirm public sewer is available6.
- If the driveway meets a state highway, apply for a PennDOT highway occupancy permit8.
- Apply for the zoning permit and the construction code building permit, paying fees when you file122.
- Pass the required inspections of the foundation, the plumbing, mechanical and electrical systems, the frame and masonry, and the wallboard, then the final inspection14.
- Obtain the certificate of occupancy before anyone moves in15.
Pennsylvania has no statewide license requirement for most construction contractors, though a municipality may add its own16.
What to check before you buy land in Upper Nazareth Township
Floodplain: development in a mapped flood hazard area needs a floodplain development permit from the municipality before work begins17. Ask the township whether a parcel touches one.
Wells: a homeowner drilling a well on their own land is exempt from the state driller licensing requirement, and Pennsylvania has no construction standards for private wells18. We could not confirm any township well rule.
Soils: across Northampton County, about 19% of soils rate as not limited for a conventional septic drain field, so most lots need a site evaluation and some need an engineered system19.
Taxes: Northampton County's effective property tax rate is about 1.7%20.
Watch-outs
- The county's own pages do not zone this land; the township does, so do not rely on county answers for setbacks or RV use10.
- We could not confirm the township's rules on RVs, tiny homes, accessory dwellings, minimum lot size or setbacks; ask the zoning officer before you buy3.
- A new principal building cannot be occupied without a certificate of occupancy5.
- A driveway built or changed on state highway land needs a PennDOT permit in addition to township approvals8.
Sources
- Upper Nazareth Township Code, Chapter 27 Zoning, Part 1 Administration (Upper Nazareth Township), quoted and re-checked
- Upper Nazareth Township Code, Chapter 27 Zoning, Part 1 Administration (Upper Nazareth Township), quoted and re-checked
- Upper Nazareth Township Building & Zoning (uppernazarethtownship.org)
- Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
- Upper Nazareth Township Code, Chapter 27 Zoning, Part 1 Administration (Upper Nazareth Township), quoted and re-checked
- 25 Pa. Code § 72.22. Permit issuance (Pennsylvania statewide rule), quoted and re-checked
- Act 537 Sewage Facilities, quoted and re-checked
- Apply for a PennDOT Highway Occupancy Permit (Pennsylvania statewide rule), quoted and re-checked
- Upper Nazareth Township Code, Chapter 27 Zoning, Part 1 Administration (Upper Nazareth Township), quoted and re-checked
- Pennsylvania Municipalities Planning Code, Section 602 (Pennsylvania statewide rule), quoted and re-checked
- Apply for a Uniform Construction Code Building Permit, quoted and re-checked
- Upper Nazareth Township Code, Chapter 27 Zoning, Part 1 Administration (Upper Nazareth Township), quoted and re-checked
- Upper Nazareth Township Code, Chapter 27 Zoning, Part 1 Administration (Upper Nazareth Township), quoted and re-checked
- Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
- Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
- Contractor Licensing (Pennsylvania statewide rule), quoted and re-checked
- PennsylvaniA Floodplain Development Guide (Pennsylvania statewide rule), quoted and re-checked
- Apply for a Water Well Drillers License and Rig Permit (Pennsylvania statewide rule), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.