Bolthole Index

Potter County, Pennsylvania

Building permits, zoning and land rules in Potter County, Pennsylvania

81Index Score / 100
#6 of 67 in Pennsylvania

A building permit is required for a home in Potter County, Pennsylvania, under the statewide Uniform Construction Code; the municipality or a certified third-party agency issues it1. Zoning requirements vary by municipality and must be checked for the parcel2. The applicable municipal or joint local agency, rather than Potter County government generally, issues on-lot septic permits under Act 53734.

At a glance

Building permit
Required under Pennsylvania's statewide Uniform Construction Code; the municipality or a certified third-party agency issues it1
Zoning
Varies by municipality; ask the parcel's township or borough which local zoning rules apply2
Septic permit
Required unless an exception applies; the applicable municipal or joint local agency issues the on-lot septic permit under Act 53734
Minimum lot size
For subdivisions under the county SALDO in a municipality without zoning: 10,000 square feet with public water and sewer, 20,000 with sewer only, or 1 acre without public sewer5
RV or tiny-home living
Not confirmed countywide; ask the township or borough before relying on residential occupancy6
Agricultural buildings
Qualifying nonhabitable agricultural buildings are excluded from the Uniform Construction Code7
Owner-builder exemption
Self-building creates no general UCC exemption; the owner must obtain the building permit unless a specific exclusion applies8
Private well
A self-drilling homeowner needs no state driller license or rig permit; a hired well driller does, and local rules remain unconfirmed910

Who to call

Planning & zoning

Potter County GIS/Planning/Community Development Department

County subdivision and land-development reviews, SALDO documents and land-use information

814-274-8254

Gunzburger Building, Suite 103, One North Main Street, Coudersport, PA 16915

Contact details are copied from each office’s official page and were checked against it on October 7, 2026.

Off-grid gear

Going off-grid in Potter County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Potter County, Pennsylvania?

Yes. A home or other UCC-regulated project in Potter County requires a building permit before work begins, and the building cannot be occupied without a certificate of occupancy111. Pennsylvania's Uniform Construction Code applies statewide, including in Potter County12. The building-permit issuer depends on the municipality: an opt-in township or borough administers the UCC locally, while a certified third-party agency enforces residential requirements in an opt-out municipality1.

A qualifying agricultural building is excluded from the UCC when it serves a defined farm use and has no habitable space, public occupancy, or area for processing, treating, or packaging agricultural products7. That exclusion does not turn a barn into an unpermitted home7. Owner-builders have no general exemption from the UCC building permit, plan review, inspections, or occupancy requirements, although narrow statutory exclusions may apply8. A religious-belief exemption is limited to conflicting electrical, specified lumber or wood, or plumbing provisions for a qualifying applicant and is not a blanket building-permit exemption13.

Who handles Potter County building permits and inspections?

Potter County does not operate one building-permit counter for every parcel; start with the township or borough where the property lies to identify its building code official or certified third-party agency1412. In an opt-out municipality, a certified third-party agency handles residential UCC enforcement, while the Pennsylvania Department of Labor and Industry handles commercial code enforcement15. Zoning approval also remains municipal, and the applicable municipal or joint local agency separately issues on-lot septic permits24.

For a one-family or two-family dwelling in an opt-out municipality, the required inspection sequence covers the foundation; plumbing, mechanical and electrical work; frame and masonry; wallboard; and the final inspection16. Potter County's GIS/Planning/Community Development Department is the county contact for subdivision and land-development matters at the Gunzburger Building, Suite 103, One North Main Street, Coudersport, PA 16915, or 814-274-825417. County Planning's role is separate from building permits, municipal zoning approval, and local-agency septic permits18124.

Does Potter County have zoning and minimum lot sizes?

Zoning requirements in Potter County vary by municipality, and a subdivision or land-development plan must conform to any applicable municipal zoning ordinance2. We could not confirm a current municipality-by-municipality zoning list or whether Potter County later adopted county-level zoning, so ask the parcel's township or borough about use, building height, lot coverage, RV occupancy and dwelling size before relying on a site plan.

Where the county SALDO governs a proposed subdivision or land development in a municipality without zoning, minimum lot areas are 10,000 square feet with public water and sewer, 20,000 square feet with sewer only, and 1 acre without public sewer5. The corresponding minimum front setbacks are 25, 30 and 40 feet, with minimum lot widths of 80, 90 and 100 feet at that setback line19. A municipal zoning ordinance controls instead where one exists, and unsuitable sewage soils can require a larger unsewered lot195.

How do septic permits work in Potter County?

A septic permit is required for an individual or community on-lot system in Potter County unless an Act 537 exception applies20. The applicable municipality or joint local agency, rather than Potter County government generally, issues the septic permit and employs the Sewage Enforcement Officer34. Ask the parcel's municipality to identify that officer before ordering a design21. A narrow exemption may apply to an owner or immediate-family residence on a contiguous tract of at least 10 acres, but it carries ownership, notification and siting conditions and should not be assumed from acreage alone22.

Only 3.1% of Potter County soils are rated without severe limitations for a conventional drain field, so arrange the site and soil evaluation before finalizing a house location23. For a subdivision or land development governed by the county SALDO, an on-lot system needs municipal, Sewage Enforcement Officer, and DEP approval when public sewer is unavailable24. A composting or incinerating toilet does not eliminate wastewater planning for a new home because washwater or excess liquid still needs an approved disposal method25.

Can you live in an RV or tiny home on land in Potter County?

We could not confirm a countywide rule allowing or prohibiting full-time RV occupancy or tiny-home occupancy on private land in Potter County. Ask the parcel's township or borough whether its zoning or other ordinances allow the proposed use, because Pennsylvania directs local zoning questions to that municipality26. The published state-park camping limits apply to state park campgrounds and do not answer whether someone may reside in an RV on private land27.

A tiny home intended as a dwelling remains subject to the statewide building-permit process unless a specific UCC exclusion applies1. Manufactured housing follows a distinct rule: utility connections, site grading not covered by the approved design, later additions, and certain relocation or resale work remain subject to the UCC28. Wastewater must also be resolved; for a county-SALDO subdivision or land development without public sewer, an on-lot system requires municipal, Sewage Enforcement Officer, and DEP approval24.

Building a home in Potter County: the steps, in order

  1. Identify the parcel's township or borough; ask who issues its UCC building permit and which municipal zoning approval applies12.
  2. Confirm whether a subdivision or land-development plan falls under the county SALDO or a municipal ordinance18. An agricultural lease division of more than 10 acres can be exempt from county subdivision-plan procedures only if it creates no new street, access easement, or dwelling29.
  3. Arrange the septic evaluation early, because only 3.1% of county soils are rated without severe limits for a conventional drain field23.
  4. Ask the municipality to identify the local agency and Sewage Enforcement Officer, then apply for the on-lot septic permit unless an exception applies34.
  5. Submit building plans to the municipal code official or certified third-party agency before work starts1.
  6. Obtain the applicable driveway access permit before connecting or altering a driveway to a public right-of-way for land development covered by the county SALDO30.
  7. Complete building inspections and obtain the certificate of occupancy before using the home1611.

What should you check before buying land in Potter County?

Confirm the municipality first, because building-code administration is local and zoning requirements vary even though the UCC applies statewide122. Ask Potter County Planning whether a proposed split or development falls under the county SALDO; an accessory farm building subordinate to an existing building is excluded from the SALDO definition of land development, though other applicable rules remain2917. Where public water and sewer are reasonably available to a county-SALDO project, connection and an ability-to-serve letter are required31.

Check septic feasibility before treating acreage as buildable, because only 3.1% of Potter County soils are rated without severe limits for conventional drain fields23. Only 38.8% of county land has a slope of 15% or less, and 88.8% is wooded3233. Development in a Special Flood Hazard Area needs a municipal floodplain permit, while Chapter 106 work may require a standard state application and other approvals3435. A homeowner self-drilling on owned or leased land needs no state driller license or rig permit, but a hired drilling company does; Potter County municipal well requirements remain unconfirmed910.

Watch-outs

  • Zoning requirements vary by municipality; ask the parcel's township or borough about the intended use and dimensional standards2.
  • Potter County Planning handles county SALDO matters; the township, borough or a certified third-party agency handles the UCC building permit, municipal zoning approval remains local, and a municipal or joint local agency issues the on-lot septic permit18124.
  • For county-SALDO projects where the municipality lacks zoning, the front setback ranges from 25 to 40 feet and lot width from 80 to 100 feet according to water and sewer service19.
  • RV and tiny-home occupancy on private land could not be confirmed countywide; ask the parcel's municipality before buying for that use26.

Sources

  1. Chapter 1 - Pennsylvania Construction Code Act, quoted and re-checked
  2. Potter County Subdivision and Land Development Ordinance of 2023, quoted and re-checked
  3. Municipal On Lot Sewage Service Areas, quoted and re-checked
  4. Municipal On Lot Sewage Service Areas, quoted and re-checked
  5. Potter County Subdivision and Land Development Ordinance of 2023, quoted and re-checked
  6. Potter County Planning Department (2026 county census)
  7. Uniform Construction Code Statute, quoted and re-checked
  8. Apply for a Uniform Construction Code Building Permit, quoted and re-checked
  9. Private Wells, quoted and re-checked
  10. Apply for a Water Well Drillers License and Rig Permit, quoted and re-checked
  11. PART XIV - Uniform Construction Code Administration and Enforcement, quoted and re-checked
  12. Uniform Construction Code (UCC), quoted and re-checked
  13. Pennsylvania Construction Code Act, as amended, quoted and re-checked
  14. PA Dept. of Labor & Industry — Uniform Construction Code (2026 county census)
  15. Uniform Construction Code (UCC), quoted and re-checked
  16. Pennsylvania Construction Code Act, Act 45 of 1999, amended, quoted and re-checked
  17. Potter County GIS/Planning/Community Development Department (pottercountypa.gov)
  18. Potter County Subdivision and Land Development Ordinance of 2023, quoted and re-checked
  19. Potter County Subdivision and Land Development Ordinance of 2023, quoted and re-checked
  20. Municipal On Lot Sewage Service Areas, quoted and re-checked
  21. PA DEP Act 537 Sewage Facilities Program (2026 county census)
  22. 25 Pa. Code § 72.22. Permit issuance (Pennsylvania statewide rule), quoted and re-checked
  23. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  24. Potter County Subdivision and Land Development Ordinance, quoted and re-checked
  25. 25 Pa. Code § 73.65. Recycling toilet, incinerating toilet or composting toilet (Pennsylvania statewide rule), quoted and re-checked
  26. Local Registrations, Permits, Zoning (Pennsylvania statewide rule), quoted and re-checked
  27. RV and Tent Campsites (Pennsylvania statewide rule), quoted and re-checked
  28. Pennsylvania Uniform Construction Code, Chapter 403 (Pennsylvania statewide rule), quoted and re-checked
  29. Potter County Subdivision and Land Development Ordinance of 2023, quoted and re-checked
  30. Potter County Subdivision and Land Development Ordinance of 2023, quoted and re-checked
  31. Potter County Subdivision and Land Development Ordinance, quoted and re-checked
  32. Share of land at 15% slope or less: Bolthole Index county data
  33. Wooded share of land: Bolthole Index county data
  34. PennsylvaniA Floodplain Development Guide (Pennsylvania statewide rule), quoted and re-checked
  35. Permitting and Authorizations, quoted and re-checked

Written October 7, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Potter County requires a building permit for a home.

RulePotter CountyCameron CountyTioga CountyMcKean CountyClinton CountyElk CountyLycoming County
Building permitRequiredRequiredRequiredRequiredRequiredRequiredRequired
County zoningNoYesNoNoYesNoYes
Septic permitsPA DEP Act 537SEOMunicipal Sewage Enforcement OfficerMunicipal Sewage Enforcement OfficerMunicipal Sewage Enforcement OfficerMunicipal Sewage Enforcement OfficerPA DEP Act 537 program

County locator

Potter County in Pennsylvania

81
County map
Potter County highlighted among the Pennsylvania counties · colored by Index score

How Potter County scores

Seclusion80100% ev.
Self-Sufficiency51100% ev.
Admin Boringness6090% ev.
Durability78100% ev.
Property Autonomy68100% ev.
Carry Cost80100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$166kTypical home
1.3%Property tax
$3,653Land / acre
43.3"Annual rain
1.7% of yrsSevere drought
0.3 / yr (+0.3)Mid-century 100°F days
9.2 daysMid-century dry spell
1.55" (+6.4%)Mid-century 1-day rain
1.61×Wildfire change factor
100%Forward climate coverage
$1,002Home insurance / yr
0% / yrInsurance growth
0.39%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
6,941People within 30 min
651,582People within 2 hr
14,179Radius comparison (15 mi)
14.8People / sq mi
0%Federal land
38.8%Land at 15% slope or less
3.1%Soils rated "not limited" for septic (strict USDA rating)
20,964 acWorkable land screen
88.8%Wooded land
76.5 tonsBiomass / forest ac
46°FAvg temp

Scout Potter County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Potter County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Potter County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Not yet researched: Abbott Township · Allegany Township · Borough of Austin · Bingham Township · Clara Township · Eulalia Township · Borough of Galeton · Genesee Township · Harrison Township · Hebron Township · Hector Township · Homer Township · Keating Township · Borough of Oswayo · Oswayo Township · Pike Township · Pleasant Valley Township · Portage Township · Roulette Township · Sharon Township · Borough of Shinglehouse · Stewardson Township · Summit Township · Sweden Township · Sylvania Township · Borough of Ulysses · Ulysses Township · West Branch Township · Wharton Township

Answers from the rulebook for Potter County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Potter County rules

  • Local zoningVaries (with conditions)

    Zoning compliance for subdivision and land-development plans across Potter County, aggregated at county level; the actual zoning authority, where applicable, is the relevant municipality.

    • The Potter County Subdivision and Land Development Ordinance applies only within municipalities under county jurisdiction; municipalities with their own subdivision or land-development ordinance are exceptions.
    • Proposed land uses must conform to any applicable municipal zoning ordinance.
    • County subdivision and land-development review is additional to, and does not supersede, approvals required by applicable municipal, Commonwealth, or federal laws and regulations.
    “Zoning – The proposed use of land in a subdivision or land development plan shall conform to any applicable municipal zoning ordinance.”
  • Minimum lot sizeDistrict specific (with conditions)

    Proposed subdivisions and land developments in Potter County municipalities without a zoning ordinance and under the jurisdiction of the Potter County SALDO.

    • The standards apply where the municipality has no zoning ordinance.
    • Where the municipality has a zoning ordinance, the municipal zoning ordinance controls and Table 603.2 does not apply.
    • For lots not served by public sewer, the Planning Commission may require a larger lot if soil conditions are unsuitable for sewage effluent and greater separation between the leach field and water-supply well is needed.
    • The Planning Commission may grant modifications for proposed subdivisions or land developments in existing villages or boroughs with established lot sizes below the table minimums.

    minimum lot area with public water and public sewer: 10000 square feet · minimum lot area with public sewer and no public water: 20000 square feet · minimum lot area without public sewer: 1 acre (A larger lot may be required based on soil conditions and sewage disposal needs.)

    “10,000 square feet 20,000 square feet One (1) acre”
  • SetbacksDistrict specific (with conditions)

    Front building setbacks and lot-width standards for proposed subdivisions and land developments in Potter County municipalities without a zoning ordinance and under the jurisdiction of the Potter County SALDO.

    • The standards apply where the municipality has no zoning ordinance.
    • Where the municipality has a zoning ordinance, the municipal zoning ordinance controls and Table 603.2 does not apply.
    • The Planning Commission may grant modifications for proposed subdivisions or land developments in existing villages or boroughs with established lot sizes below the table minimums.

    minimum lot width at front building setback with public water and public sewer: 80 feet · minimum lot width at front building setback with public sewer and no public water: 90 feet · minimum lot width at front building setback without public sewer: 100 feet · minimum front building setback with public water and public sewer: 25 feet · minimum front building setback with public sewer and no public water: 30 feet · minimum front building setback without public sewer: 40 feet

    “Minimum width at front building setback 80 feet 90 feet 100 feet Minimum front building setback 25 feet 30 feet 40 feet 2. Where located in a municipality with a zoning ordinance, lots in proposed subdivisions and land developments shall comply with the area, width, and setback standards in the zoning ordinance of the municipality, and the standards of Table 603.2 shall not apply.”
  • Who permits septicLocal (with conditions)

    On-lot sewage and septic-system permitting and enforcement in Potter County municipalities.

    • The actual administering entity is the municipality or a group of municipalities acting as a local or joint local agency.
    • County health departments may also be local agencies under Act 537.
    • DEP provides technical oversight and financial assistance.
    • Large-volume on-lot systems are an exception to the local-agency permit responsibility described on the source page.
    “Local Agencies are responsible for carrying out on-lot or onsite ("septic system") sewage treatment system permitting”
  • Septic permitRequired

    Retaining tanks and individual or community on-lot sewage systems in Potter County, subject to the Act 537 exceptions and the applicable municipality or joint local agency.

    • The permit is issued by the applicable local or joint local agency, not generally by Potter County government.
    • Large-volume on-lot systems are an exception to the local-agency permit responsibility described on the source page.
    • The local agency employs Sewage Enforcement Officers and other staff as necessary.
    “local agencies are responsible for issuing permits”
  • Off-grid sanitationLimited

    On-lot or private sanitary sewage systems for proposed subdivisions and land developments governed by the Potter County SALDO when public sewer service is unavailable.

    • The county SALDO does not establish unrestricted off-grid sanitation for all property uses.
    • Where public sewer service will not be provided, an individual on-lot sewage disposal system must be approved by the municipality, its sewage enforcement officer, and DEP.
    • Alternatively, a private sanitary sewer system must be consistent with the municipality's official Act 537 plan, approved and permitted by DEP, and designed and installed according to DEP's Pennsylvania Domestic Wastewater Facilities Manual.
    • The rule applies to subdivision and land-development proposals, not necessarily every existing single parcel or every municipality-specific ordinance.
    “individual on-lot sewage disposal systems [...] or [...] a private sanitary sewer system”
  • Mandatory utility hookupWater and sewer (with conditions)

    Proposed subdivisions and land developments governed by the Potter County Subdivision and Land Development Ordinance.

    • The requirement applies where an existing public sanitary sewer system and public water system are reasonably available with adequate capacity.
    • Reasonable availability includes a designated future service area under the municipality's official Act 537 plan or a location or distance where the provider's rules require connection.
    • The applicant must comply with the design and construction specifications of the municipality, municipal authority, utility, or other system owner.
    • An ability-to-serve letter is required from the applicable system owner or operator.
    • If the sewer service area is not part of an existing Act 537 planning document, the applicant must prepare an Act 537 plan update and submit DEP approval documentation.
    • If public sewer service will not be provided, individual on-lot disposal systems approved by the municipality, its SEO, and DEP, or a permitted private sanitary sewer system, may be used.
    • If public water service will not be provided, a private water system may be used if approved and permitted by DEP and designed and installed under DEP's Public Water Supply Manual.
    “connect to a public sewer system [...] connect to a public water system”
  • Agricultural exemptionConditional

    Agricultural land subdivision leases and accessory agricultural buildings under the Potter County SALDO.

    • Agricultural subdivision-by-lease exemption applies only to parcels of more than 10 acres.
    • The lease subdivision may not involve a new street, an easement of access, or any residential dwelling.
    • An accessory building, including a farm building used for agricultural purposes, on a lot subordinate to an existing building is exempt from the definition of land development and the ordinance requirements.
    • The agricultural exemption does not eliminate other applicable municipal, state, sewage, building-code, or environmental requirements.

    leased agricultural parcel size: > 10 acres (The exemption is unavailable if the lease subdivision involves a new street, easement of access, or residential dwelling.)

    “The following shall be exempt from subdivision plan submission and the requirements of this Ordinance: a. The subdivision by lease of land for agricultural purposes into parcels of more than ten acres, not involving any new street or easement of access or any residential dwelling, shall be exempt from procedures required for a subdivision of land.”
  • Subdividing landRegulated (with conditions)

    Subdivision and land development within Potter County, except municipalities that have their own subdivision and land-development ordinance.

    • The ordinance governs subdivision and development of land within county limits except boroughs or townships with an ordinance in effect.
    • Within municipalities under county jurisdiction, plans must be submitted to and approved by the Potter County Planning Department or Planning Commission before recording.
    • No subdivision or land development may proceed except in accordance with the ordinance.
    • A final plan must generally be recorded within 90 days after final approval or delivery of the approved plan after completion of approval conditions; otherwise approval is voided and the plan must be resubmitted.
    • The ordinance becomes effective after 30 days following enactment and remains effective until amended or rescinded.

    final-plan recording period: 90 days (The period runs from final approval or delivery of the approved plan after completion of imposed conditions, whichever is later.)

    “exception of those boroughs or townships”
  • Driveway accessLimited

    Driveways serving land developments regulated by the Potter County Subdivision and Land Development Ordinance.

    • A driveway connection to a public right-of-way, or an alteration to such a connection, requires an access permit from PennDOT or the municipality, as applicable.
    • Every land development must front on or be directly accessed by a public or private street.
    • Where a development abuts multiple streets, access must use the street presenting the least safety hazard and interruption of optimal traffic movement.
    • Sight distance must be adequate; normal traffic movement must not be impaired; the driveway must not create hazards or undue congestion; and pedestrian and bicycle access must not be impaired.
    • Driveways must be constructed at right angles to the abutting street unless site geometry and grading prohibit the standard and relief is granted.
    • Driveways must not impair maintenance, improvements, sweeping, or snow and ice removal.
    • Driveways must not interfere with traffic-control signs, signals, detectors, lighting, or related devices.
    “No driveway may be connected to a public right-of-way and no driveway connection to a public right-of-way may be altered without obtaining an access permit from PennDOT or the municipality as applicable.”
  • Permit feesPublished (with conditions)

    Applications and reviews under the Potter County Subdivision and Land Development Ordinance, including subdivision and land-development applications submitted to municipalities that have their own subdivision and land-development ordinances.

    • The fee schedule is dated February 2023.
    • Minor subdivision lot-line revisions, including lot combinations and non-building adjoiners, cost $70.
    • Other minor subdivisions cost $70 plus $10 per lot.
    • Major subdivisions cost $125 plus $15 per lot.
    • Residential land development costs $150.
    • Non-residential land development costs $150 for 0–24.99 acres, $300 for 25–99.99 acres, and $600 for 100 or more acres.
    • Modification or waiver requests cost $100.
    • A delinquent application submitted after subdivision or land development has been initiated or undertaken costs $100.
    • Applicants must pay reasonable and customary county professional-consultant review charges when needed.
    • Applicants must reimburse necessary county inspection expenses for required public improvements.
    • The schedule also applies to county reviews of applications submitted to municipalities with their own subdivision and land-development ordinances.

    minor subdivision final plan for lot-line revisions/non-building adjoiners: 70 USD · minor subdivision final plan, other: 70 plus 10 per lot USD · major subdivision plan: 125 plus 15 per lot USD · residential land development: 150 USD · non-residential land development, 0-24.99 acres: 150 USD · non-residential land development, 25-99.99 acres: 300 USD · non-residential land development, 100+ acres: 600 USD · modification or waiver request: 100 USD · delinquent application: 100 USD

    “Final plan for all other minor subdivisions $70 plus $10 per lot”
  • County-wide zoningAbsent

    There is no countywide zoning; only Coudersport Borough has a zoning ordinance, and the county only recently heard a presentation on possible county-level zoning.

    Potter County Planning Department ↗Scouted from the county site, not yet independently re-checked

Pennsylvania rules that apply here

  • Building permitLimited

    Construction, alteration, repair, movement, demolition, occupancy changes, and regulated electrical, gas, mechanical, or plumbing work for residential buildings in Potter County under Pennsylvania's Uniform Construction Code.

    • The Pennsylvania Construction Code Act applies statewide, including Potter County, but excludes utility and miscellaneous use structures accessory to detached one-family dwellings, agricultural buildings, qualifying nonstructural residential alterations, qualifying residential repairs, qualifying aluminum or vinyl siding installation, qualifying recreational cabins, qualifying temporary structures, qualifying direct seasonal agricultural commodity-sale structures, and livestock-auction loading, unloading, or sorting structures.
    • For a qualifying recreational cabin, the cabin must have at least one smoke detector, one fire extinguisher, and one carbon monoxide detector in both the kitchen and sleeping quarters, and the owner must file either the prescribed affidavit or valid proof of insurance with the municipality.
    • For residential work covered by Chapter 403, an owner or authorized agent must apply to the building code official and obtain the required permit before work begins.
    • A permit is not required for listed limited work if it does not violate a law or ordinance, including fences no more than 6 feet high; retaining walls no more than 4 feet high unless supporting a surcharge; qualifying water tanks up to 5,000 gallons with a height-to-diameter or width ratio no greater than 2 to 1; qualifying sidewalks and driveways no more than 30 inches above adjacent grade; prefabricated swimming pools less than 24 inches deep; qualifying playground equipment; qualifying window awnings projecting no more than 54 inches without additional support; uncovered decks no more than 30 inches above grade; and installation or rearrangement of communications wiring.
    • An ordinary repair does not require a permit; cutting away load-bearing walls, removing or cutting structural beams or supports, changing required means of egress, and adding or relocating listed utility or building systems are not ordinary repairs.
    • Emergency repair or equipment replacement may proceed without first applying only if the permit application is submitted to the building code official within 3 business days.
    • UCC administration is generally local through municipalities or certified third-party agencies; in municipalities that opt out, certified third-party agencies enforce residential UCC requirements and the Department of Labor and Industry is responsible for commercial code enforcement.

    retaining wall height exemption: <= 4 feet (unless the wall supports a surcharge) · water tank capacity exemption: <= 5000 gallons (height-to-diameter or width ratio must not exceed 2 to 1) · sidewalk or driveway height exemption: <= 30 inches above adjacent grade (must not be placed over a basement or story below) · prefabricated swimming pool depth exemption: < 24 inches · window awning projection exemption: <= 54 inches (must be supported by an exterior wall and require no additional support) · uncovered deck height exemption: <= 30 inches above grade · emergency repair permit application deadline: 3 business days (application must be submitted after the repair or replacement) · UCC triennial update effective date: 2026-01-01 (Pennsylvania Department of Labor and Industry states the 2025 final-omitted rulemaking became effective January 1, 2026)

    “An owner or authorized agent who intends to construct [...] shall first apply to the building code official and obtain the required permit under § 403.62a”
    2 more reviewed findings on this topic
    • Required — Residential buildings and regulated electrical, gas, mechanical, and plumbing systems in Pennsylvania municipalities enforcing the Uniform Construction Code or under third-party agency enforcement.
      “An owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a residential building [...] shall first apply to the building code official and obtain the required permit under § 403.62a (relating to permit application).”
    • Required — Commercial buildings, structures, facilities, and regulated electrical, gas, mechanical, and plumbing systems in Pennsylvania jurisdictions enforcing the Uniform Construction Code.
      “An owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a commercial building, structure and facility [...] shall first apply to the building code official and obtain the required permit under § 403.42a (relating to permit application).”
  • Owner-builder exemptionConditional

    A property owner who is also the permit applicant and constructs a dwelling unit in Potter County may seek exemption from specified Pennsylvania Uniform Construction Code provisions when the statutory religious-belief requirements are met; this is not a general owner-builder exemption from the UCC.

    • The applicant must be a member of a recognized religious sect.
    • The sect must have established tenets or teachings conflicting with an electrical, lumber or wood provision not relating to pressure treatment, or plumbing provision of the UCC.
    • The applicant must adhere to the sect's established tenets or teachings.
    • For a dwelling unit, it must be used solely as a residence for the applicant and the applicant's household.
    • The exemption concerns only UCC provisions that conflict with the applicant's religious beliefs; it does not create a general exemption based solely on self-building or ownership.
    • If the exempted building is later sold or leased, the applicant must bring it into compliance with the exempted UCC provisions unless the prospective owner or lessee files the required qualifying affidavit.
    “An applicant for a construction permit for a dwelling unit or one-room schoolhouse utilized by a member or members of a recognized religious sect may file an application with a code administrator to be exempted from the Uniform Construction Code, as provided in this subsection, which conflicts with the applicant’s religious beliefs.”
    3 more reviewed findings on this topic
    • Conditional — Owner-builders undertaking UCC-regulated construction in Potter County and elsewhere in Pennsylvania.
      “The UCC states that before beginning any construction or building work, the property owner or an authorized representative must obtain a UCC building permit”
    • Conditional — An applicant constructing a dwelling unit in Pennsylvania, including Potter County, who seeks exemption from UCC provisions conflicting with the applicant’s recognized religious sect’s beliefs.
      “A code administrator shall grant an application for an exemption if made in accordance with paragraph (1).”
    • Available — A property owner performing construction work on the owner's own primary residence in Pennsylvania without compensation, and most construction work for which Pennsylvania does not impose a statewide contractor licensure or certification requirement.
      “The Commonwealth of Pennsylvania currently has no licensure or certification requirements for most construction contractors (or their employees).”
  • Building code adoptedAdopted

    Building construction, alteration, and repair in Potter County because Pennsylvania's Uniform Construction Code applies statewide.

    • The 2021 accessibility updates are permanently enjoined; the 2018 accessibility requirements remain enforceable for all structures.
    • Non-accessibility UCC requirements remain enforceable.
    • More than 90% of Pennsylvania municipalities administer and enforce the UCC locally through municipal employees or certified third-party agencies; in those municipalities, the Department generally has no code-enforcement authority except where the municipality lacks a certified Accessibility Inspector/Plans Examiner.
    • If a municipality has opted out, the Department handles all commercial code enforcement, while certified third-party agencies enforce residential UCC requirements.
    • The Department has sole jurisdiction over elevators and state-owned buildings statewide.
    • Municipalities may change their local-enforcement decision only with 180 days' advance notice to the Department.
    • The revised regulations adopting the 2018 I-Code series had an effective date of February 14, 2022; qualifying pre-existing design or construction contracts could use the prior UCC if an application was made by August 14, 2022.
    • Pennsylvania's 2025 UCC triennial update became effective January 1, 2026.

    2018 I-Code series revised regulations effective date: 2022-02-14 (For a design or construction contract signed before this date, application and permit under the prior UCC were available if application was made by 2022-08-14.) · 2025 UCC triennial update effective date: 2026-01-01 · municipal enforcement-change notice: 180 calendar days (Advance notice to the Department is required.)

    “Pennsylvania's statewide building code, generally known as the Uniform Construction Code (UCC), has to be followed by builders in the state.”
    4 more reviewed findings on this topic
    • Adopted (with conditions) — Building construction in Potter County under Pennsylvania's statewide Uniform Construction Code.
      “Pennsylvania's statewide building code, generally known as the Uniform Construction Code (UCC), has to be followed by builders in the state.”
    • Adopted (with conditions) — Construction, alteration, repair, and occupancy of buildings in Potter County under Pennsylvania's Uniform Construction Code.
      “Pennsylvania's statewide building code, generally known as the Uniform Construction Code (UCC), has to be followed by builders in the state.”
    • Adopted (with conditions) — Construction, alteration, repair, and occupancy of buildings in Potter County that fall within Pennsylvania's Uniform Construction Code.
      “Pennsylvania's statewide building code, generally known as the Uniform Construction Code (UCC), has to be followed by builders in the state.”
    • Adopted — Building construction throughout Pennsylvania under the Pennsylvania Uniform Construction Code.
      “Pennsylvania's statewide building code, generally known as the Uniform Construction Code (UCC), has to be followed by builders in the state.”
  • InspectionsRequired

    Residential construction for which a Pennsylvania Uniform Construction Code permit was issued.

    • The permit holder must keep construction accessible and notify the construction code official when work is ready.
    • Required inspection areas are foundations; plumbing, mechanical, and electrical systems; frame and masonry; and wallboard.
    • The official may conduct additional inspections for UCC or municipal-ordinance compliance.
    • A final inspection and final inspection report are required.
    • Third-party agencies under contract must submit the final inspection report to the property owner, builder, and designated lender.
    “A construction code official shall inspect all construction for which a permit was issued. The permit holder shall insure that the construction is accessible for inspection.”
    2 more reviewed findings on this topic
    • Required — UCC-regulated construction in Potter County, with the specific five-inspection sequence stated for one-family and two-family dwelling units and utility and miscellaneous use structures in municipalities that have not adopted a UCC administration ordinance.
      “For one-family and two-family dwelling units and utility and miscellaneous use structures, all of the following five inspections shall be required: [...] (v) Final inspection. The final inspection shall not be deemed approved until all previous inspections have been successfully completed and passed.”
    • Required — Commercial construction governed by §§ 403.41-403.48 of the Pennsylvania Uniform Construction Code.
      “A construction code official shall perform inspections to insure that the construction complies with the approved permit and the Uniform Construction Code.”
  • Certificate of occupancyRequired

    Use or occupancy of buildings and residential buildings in Potter County under Pennsylvania's Uniform Construction Code.

    • A building, structure, or facility may not be used or occupied without a certificate of occupancy issued by a building code official.
    • For residential buildings, the official issues the certificate after receiving a final inspection report indicating compliance with the Uniform Construction Code and ordinance, generally within 5 business days; the 10-business-day period applies in a city of the first class and does not apply to Potter County.
    • A certificate may cover only a portion of a building if that portion independently meets the Uniform Construction Code.
    • A temporary certificate may cover a portion of a building before all permitted work is complete if the portion may be occupied safely; the building code official sets the temporary certificate's validity period.
    • A certificate may be suspended or revoked for issuance in error, incorrect information supplied by the permit applicant, or violation of the Uniform Construction Code; before revocation, the owner may request a hearing before the board of appeals.
    • UCC enforcement is administered by the municipality or a certified third-party agency in municipalities that enforce locally; certified third-party agencies enforce residential requirements in opt-out municipalities.

    certificate issuance deadline after compliant final inspection: 5 business days (10 business days in a city of the first class) · temporary certificate validity period: set by building code official (only for safely occupiable portions before completion of all permitted work)

    “A residential building may not be used or occupied without a certificate of occupancy issued by a building code official.”
    2 more reviewed findings on this topic
  • Zoning districtsPartial

    Pennsylvania zoning requirements and district information; the official state source directs applicants to the local township, borough, or city.

    • Local registrations, permits, and zoning requirements must be addressed with the township, borough, or city where the activity will occur.
    • The source does not publish a statewide zoning-district map or a single statewide zoning-district schedule.
    • This claim does not identify or aggregate individual municipal zoning districts.
    “Local registrations, permits, zoning requirements and related questions should be directed to the township, borough, or city where you will be operating.”
  • Manufactured homesLimited

    Manufactured housing assembled and shipped by the manufacturer and bearing the required federal-construction-and-safety label, including changes in occupancy, resale, relocation, additions, repairs, utility connections, and grading addressed by Pennsylvania's Uniform Construction Code.

    • For new labeled manufactured housing installed in conformity with the manufacturer's approved design, the UCC does not apply except as provided in the regulation.
    • Construction activities or processes, including utility connections and grading, that are not addressed by the manufacturer's approved design must comply with the UCC.
    • The UCC applies to alterations or repairs outside the federal manufactured-home standards and manufacturer installation instructions after assembly and shipment.
    • The UCC applies to additions after delivery to the site.
    • The UCC applies to construction, alteration, repair, or change of occupancy if the manufactured housing is resold to a subsequent purchaser.
    • The UCC applies to construction, alteration, repair, or change of occupancy if the original purchaser relocates the manufactured housing.
    • Pennsylvania building-permit guidance states that manufactured housing projects require inspections for site preparation, foundation construction, repairs, and changes in occupancy.
    • This state construction-code rule does not resolve local zoning, land-use siting, or utility/septic approval requirements.
    “Construction, alteration, repair or change of occupancy if the original purchaser relocates the manufactured housing.”
  • Septic inspectionLimited

    Individual and community sewage-disposal systems before concealment or covering after construction.

    • The system may not be covered until approval to cover is given by the original permit issuer or authorized representative.
    • If 72 hours have elapsed after notification of construction completion, excluding Sundays and holidays, the applicant may cover the system unless permission has been refused.

    post-completion waiting period: 72 hours (Sundays and holidays excluded.)

    “shall be covered from view until approval to cover the same has been given by the body which issued the original permit”
  • Well permitRequired

    Water-well drilling companies drilling water wells in Potter County, including private-water-well drilling performed by a company.

    • The state page states that the requirement applies to water-well drilling companies and does not apply to farmers or homeowners drilling their own wells on their own or leased land.
    • The license year runs from June 1 through May 31.
    • A driller's license costs $60 per year and a rig permit costs $20 each.
    • Drillers must submit well construction details to the state and the well owner through the Pennsylvania Groundwater Information System Driller application.

    license fee: 60 USD per year · rig permit fee: 20 USD each · license year: June 1-May 31

    “Water well drilling companies must get a license and permits to drill a well in Pennsylvania. The license year runs from June 1 to May 31. This does not apply to farmers or homeowners who drill their own water wells on their own or leased land. Pennsylvania has construction standards for public water-supply wells but not for private water wells.”
    4 more reviewed findings on this topic
    • Not required — Private homeowner water wells in Potter County, where the homeowner drills the well on the homeowner's own or leased land.
      “Water well drilling companies must get a license and permits to drill a well in Pennsylvania. The license year runs from June 1 to May 31. This does not apply to farmers or homeowners who drill their own water wells on their own or leased land.”
    • Not required — Farmers or homeowners who drill their own water wells on land they own or lease in Potter County.
      “This does not apply to farmers or homeowners who drill their own water wells on their own or leased land.”
    • Not required — Private homeowner water wells drilled by the homeowner on the homeowner's own or leased land in Potter County.
      “This does not apply to farmers or homeowners who drill their own water wells on their own or leased land.”
    • Limited — Water-well drilling statewide, distinguishing commercial water-well drillers from farmers and homeowners drilling their own wells on owned or leased land.
      “Water well drilling companies must get a license and permits to drill a well in Pennsylvania.”
  • Building in a floodplainLimited

    Development activities in Pennsylvania subject to the Chapter 106 Floodplain Management regulations, including activities in Potter County when Chapter 106 applies.

    • The official DEP page states that regulations often require a permit or authorization, but the permitting or approval method, type of permitting, or waiver can take different forms.
    • The page covers Chapter 106 Floodplain Management regulations together with Chapter 105, Section 401, and Section 404 permitting programs; it does not state that every activity in every floodplain requires the same permit.
    • There may be additional permits or approvals beyond those required under the listed regulatory programs.
    • Chapter 106 has two permit application types: a standard application and a Site Restoration Permit.
    • The Site Restoration Permit is only for removal of a highway obstruction or an obstruction owned or maintained by the Commonwealth, a political subdivision of the Commonwealth, or a public utility; all other Chapter 106 applications are standard applications using the Individual Chapter 105 Permit Application Form and Instructions.
    “There are two types of Chapter 106 permit applications. A standard application type, and a Site Restoration Permit. [...] The site restoration permit is only for the removal of a highway obstruction or obstruction owned or maintained by the Commonwealth, a political subdivision of the Commonwealth or a public utility. All other applications are a standard application and use the Individual Chapter 105 Permit Application Form and Instructions.”
    2 more reviewed findings on this topic
    • Required — Development activities within a Special Flood Hazard Area in Pennsylvania municipalities.
      “A floodplain development permit (or its equivalent) must be issued by the municipality before development activities occur within the SFHA.”
    • Limited — Activities subject to Pennsylvania Chapter 106 Floodplain Management permitting and authorizations.
      “The site restoration permit is only for the removal of a highway obstruction or obstruction owned or maintained by the Commonwealth”
  • Short-term rentalsLimited

    Short-term lodging rentals of rooms, apartments, or houses for fewer than 30 days to the same person in Pennsylvania.

    • The Pennsylvania hotel occupancy tax rate is 6 percent.
    • Allegheny and Philadelphia counties have an additional 1 percent local hotel tax collected by the Department of Revenue.
    • Some counties impose an additional tax collected by the county treasurer.
    • If the taxpayer does not exclusively use a third-party booking site, or the broker does not collect and remit the hotel occupancy tax, the taxpayer must register with the Department of Revenue for a Sales, Use and Hotel Occupancy Tax License.
    • If a taxpayer exclusively uses a third-party booking site and the broker confirms collection and remittance, the homeowner should not register for a Sales, Use and Hotel Occupancy Tax License.

    lodging duration threshold: < 30 days (To the same person.) · Pennsylvania hotel occupancy tax rate: 6 percent

    “anyone who rents out their property to provide lodging for less than 30 days to the same person must collect and remit”
  • Permit processPublished (with conditions)

    Construction and building work in Potter County subject to Pennsylvania's Uniform Construction Code.

    • Before beginning construction or building work, the property owner or authorized representative must obtain a UCC building permit.
    • The UCC requires inspections in several cases, including construction or changes to commercial or residential buildings, electrical, gas, mechanical, or plumbing systems, and installation of swimming pools or hot tubs.
    • A UCC certificate of occupancy must be issued before a building or facility can be used.
    • Emergency repairs or equipment replacements may be made without a permit if an application is submitted to the building code official within three business days.
    • UCC enforcement is generally administered locally by municipalities or certified third-party agencies; in opt-out municipalities, certified third-party agencies enforce residential requirements and the Department of Labor and Industry is responsible for commercial code enforcement.
    • The cited source provides a statewide process but does not identify the specific Potter County municipality or third-party agency that would receive a particular application.
    “The UCC requires property owners to obtain a construction or building permit before starting any work. Inspections are also necessary in several cases, including construction or changes to commercial or residential buildings, electrical, gas, mechanical or plumbing systems, and the installation of swimming pools or hot tubs. Additionally, manufactured and industrialized housing projects require inspections for site preparation, foundation construction, repairs, and changes in occupancy. A UCC certificate of occupancy must be issued before a building or facility can be used. However, emergency repairs or equipment replacements can be made without a permit as long as an application is submitted to the building code official within three business days.”
    2 more reviewed findings on this topic
    • Published (with conditions) — Pennsylvania Uniform Construction Code building permits for construction and building work subject to the UCC.
      “The UCC requires property owners to obtain a construction or building permit before starting any work.”
    • Partial — Local registrations, permits, and zoning inquiries for businesses and development in Pennsylvania.
      “Local registrations, permits, zoning requirements and related questions should be directed to the township, borough, or city where you will be operating.”
  • Campground & park staysLimited

    RV use and occupancy at Pennsylvania state park campgrounds.

    • Use must occur at a state park campground and comply with campsite rules.
    • Campers may stay up to 14 consecutive nights from Memorial Day to Labor Day.
    • Campers may camp up to 21 consecutive nights during the remainder of the year.
    • Campers must vacate and remove all equipment for 48 hours between reservations.
    • A maximum of two sleeping units is permitted per campsite, of which only one may be wheeled.
    • Campsite occupancy is limited to one family unit or one non-family unit limited to five persons per site.
    • The page does not establish statewide permission for long-term or residential RV occupancy outside state park campgrounds.

    maximum stay, Memorial Day to Labor Day: 14 consecutive nights · maximum stay, remainder of year: 21 consecutive nights · equipment-removal interval between reservations: 48 hours · maximum sleeping units per campsite: 2 units (Only one may be wheeled.) · maximum non-family occupancy: 5 persons per site (One family unit is permitted instead.)

    “maximum of two sleeping units are permitted per campsite, of which only one may be wheeled.”
    One more reviewed finding on this topic
    • Limited — Temporary camping at Pennsylvania state park campgrounds.
      “Campers may camp for up to 21 consecutive nights”
  • county zoning authorityLimited

    County zoning authority over land in Pennsylvania municipalities that lack an effective municipal zoning ordinance.

    • County zoning power is limited to land in municipalities wholly or partly within the county that have no zoning ordinance in effect when the county zoning ordinance is introduced and until the municipal zoning ordinance becomes effective.
    • A zoning ordinance enacted by a municipality other than the county repeals the county zoning ordinance pro tanto within that municipality.
    • The statute defines a county under the Pennsylvania Municipalities Planning Code as a county of the second through eighth class.
    “The powers of the governing bodies of counties to enact, amend and repeal zoning ordinances shall be limited to land in those municipalities, wholly or partly within the county, which have no zoning ordinance in effect at the time a zoning ordinance is introduced before the governing body of the county and until the municipality's zoning ordinance is in effect. The enactment of a zoning ordinance by any municipality, other than the county, whose land is subject to county zoning shall act as a repeal protanto of the county zoning ordinance within the municipality adopting such ordinance.”
    One more reviewed finding on this topic
    • Limited — Pennsylvania counties adopting and enforcing zoning ordinances on unincorporated land.
      “Section 602. County Powers.--The powers of the governing bodies of counties to enact, amend and repeal zoning ordinances shall be limited to land in those municipalities, wholly or partly within the county, which have no zoning ordinance in effect at the time a zoning ordinance is introduced before the governing body of the county and until the municipality's zoning ordinance is in effect.”
  • county building authorityLimited

    Pennsylvania county authority over building-code administration and enforcement for residential construction in unincorporated areas.

    • The general Pennsylvania Construction Code Act assigns administration and enforcement to municipalities, not counties.
    • A county of the second class may retain authority only if it has adopted a plumbing code and accompanying rules and regulations under the Local Health Administration Law.
    • The retained authority is limited to promulgating and enforcing that plumbing code and making changes that meet the minimum requirements of the Uniform Construction Code.
    • The official Department of Labor and Industry page states that residential UCC requirements in opt-out municipalities are enforced by certified third-party agencies hired by property owners or contractors.
    “A county of the second class that has adopted a plumbing code and accompanying rules and regulations pursuant to the act of August 24, 1951 (P.L.1304, No.315), known as the Local Health Administration Law, shall retain the authority to promulgate and enforce such plumbing code and to make such changes as it deems necessary, provided that such changes meet the minimum requirements as defined in the Uniform Construction Code.”

Set by your town or city, not the county

In Pennsylvania, zoning is adopted by each town or city, so Potter County has no county-wide answer on these. Find your town or city in the list of places on this page, or call its clerk or zoning administrator.

  • Minimum dwelling size
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Potter County, Pennsylvania

Is Potter County a good place to live off-grid or homestead?

Potter County scores 81/100 on the Bolthole Index, a strong county profile. Its strengths: sparse surroundings — about 6,941 people within a 30-minute drive and manageable long-term carry cost.

Do you need a building permit in Potter County, Pennsylvania?

Potter County generally requires a residential building permit, and it has no county-wide zoning. Onsite septic is permitted by PA DEP Act 537 (administered by municipal Sewage Enforcement Officer). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Potter County, Pennsylvania?

Land in Potter County runs about $3,653 per acre, based on the latest county data.

What is the water situation in Potter County?

Potter County gets about 43.3" of rain a year, with severe drought in roughly 1.7% of years.

How remote is Potter County?

A representative private-land location has about 6,941 people within a 30-minute drive and 651,582 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Potter compares in Pennsylvania

Compare side-by-side →See all 67 Pennsylvania counties ranked →