Bolthole Index

Sullivan County, Pennsylvania

Building permits, zoning and land rules in Sullivan County, Pennsylvania

77Index Score / 100
#16 of 67 in Pennsylvania

Sullivan County, Pennsylvania requires a building permit for work covered by the statewide Uniform Construction Code; the Sullivan County Council of Governments provides the local application rather than a county building department12. Zoning comes from the county ordinance in three townships or a local borough ordinance, while septic permits stay with the local Sewage Enforcement Officer and floodplain-development permits stay with the municipality3456.

At a glance

Building permit
Required for work covered by Pennsylvania's Uniform Construction Code; the COG publishes the building-permit application21
Building inspections
Required for UCC-regulated construction and changes to listed building systems7
Zoning
County ordinance in Cherry, Colley and Davidson townships; local ordinances in Dushore and Laporte boroughs34
Septic
A local agency and Sewage Enforcement Officer handle on-lot permits58
RV or tiny-home living
Private-land occupancy rules are unconfirmed; ask the township or borough before moving in9
Owner-builder exemption
Owners may perform work without compensation, but that does not waive UCC permits or inspections1011
State-highway driveway
PennDOT permit required to build or change access on state highway land12

Who to call

Building permits

Sullivan County Council of Governments (COG)

Local contact for the COG construction-permit application

407-818-9743

sullivanctycog@gmail.com

268 Overton Road, Dushore, PA. 18614

Septic permits

Sullivan County Council of Governments (COG)

Starting contact for the municipal Sewage Enforcement Officer serving COG members

407-818-9743

sullivanctycog@gmail.com

268 Overton Road, Dushore, PA. 18614

Planning & zoning

Sullivan County Planning & Development

Subdivision and land-development applications and checklists

1-570-946-5207

245 Muncy Street, Suite 110, P.O. Box 157, Laporte, PA 18626

Contact details are copied from each office’s official page and were checked against it on October 9, 2026.

Off-grid gear

Going off-grid in Sullivan County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Sullivan County, Pennsylvania?

Yes. Property owners in Sullivan County must obtain a building permit before starting work covered by Pennsylvania's statewide Uniform Construction Code12. The enforcing authority may be a municipality, a certified third-party agency or the state Department, depending on the municipality2. The Sullivan County Council of Governments publishes the local building-permit application for its participating municipalities1.

Building inspections are required for UCC-regulated construction and changes to residential buildings and listed electrical, gas, mechanical or plumbing systems7. A residential building subject to the UCC may not be used until a certificate of occupancy has been issued after a compliant final inspection13. A property owner may perform uncompensated work on the owner's own primary residence, but that does not waive the building permit, building inspections or certificate of occupancy102713. A qualifying agricultural building without habitable space is excluded from the state Construction Code Act, but municipal land-use, fire, electrical, health and environmental rules may still apply14.

Who handles Sullivan County building permits, and how do you reach them?

Sullivan County does not direct applicants to a conventional county building department; the Sullivan County Council of Governments publishes the building-permit application for local use1. The COG lists its physical office as 268 Overton Road, Dushore, PA. 18614, its email as sullivanctycog@gmail.com and its telephone as 407-818-974315. Because that published telephone number carries an out-of-state area code, email is the prudent first contact if the call does not connect15.

Ask the COG which enforcing authority will review the building-permit application and what local building-permit fee applies. Pennsylvania's published UCC building-permit process identifies application documents, plan-submission choices, floodplain documentation, energy-code documentation and review checklists, but the actual enforcing authority depends on the municipality or certified third-party agency16. The state publishes building-permit fees only for applications within state jurisdiction, not a Sullivan County-specific amount17. For subdivision or land development, Sullivan County Planning & Development directs applicants to download, complete and submit the appropriate forms18. Zoning approval and septic permits remain separate: confirm zoning with the applicable county or borough authority and begin septic review with the local Sewage Enforcement Officer345.

Does Sullivan County, Pennsylvania have zoning?

Sullivan County has a county zoning ordinance used in Cherry Township, Colley Township and Davidson Township3. Dushore Borough and Laporte Borough use their own zoning ordinances, while the county's 2014 plan reported no local zoning ordinance in the other listed municipalities4. Because that municipality-by-municipality account comes from the 2014 plan, confirm the current zoning authority and zoning approval for the parcel before purchase or design4. Septic permits do not shift with zoning authority; the local Sewage Enforcement Officer handles on-lot sewage review5.

Subdivision review is separate from zoning approval. Sullivan County Planning & Development publishes subdivision and land-development applications and checklists, while Pennsylvania law allows a county subdivision ordinance to apply where a municipality has none in effect1920. We could not confirm current county or municipal rules for setbacks, minimum dwelling size, lot size, building height, RV occupancy or tiny homes, so ask the applicable county or borough zoning authority about each item before relying on a parcel for a particular use34.

How do septic permits work in Sullivan County?

On-lot septic permitting and enforcement in Sullivan County are local-agency responsibilities carried out through a Sewage Enforcement Officer5. Code Inspections, Inc. serves as the Sewage Enforcement Officer for COG member municipalities, with the COG office in Dushore as the starting contact21. Local agencies issue permits for retaining tanks and individual or community on-lot systems, with an exception for large-volume systems8.

Pennsylvania generally requires the local-agency permit before installing or constructing an on-lot system or occupying a building served by one22. A narrow exemption may apply to an owner or immediate-family residence on a contiguous tract of at least 10 acres, but it carries ownership-date, notice and siting conditions and may be displaced by local ordinance22. Sullivan County's soil survey rates 0% of soils as free from severe limits for a conventional drain field, so make the Sewage Enforcement Officer's site evaluation an early contingency rather than assuming a conventional system will work23.

Can you live in an RV or tiny home on your land in Sullivan County?

We could not confirm a countywide rule allowing long-term RV residence, temporary private-land camping or tiny-home occupancy in Sullivan County. Ask the county zoning authority for land in Cherry, Colley or Davidson township and the borough zoning authority in Dushore or Laporte about occupancy, setbacks, dwelling size and zoning approval before moving an RV or tiny home onto the parcel34. For another municipality, first confirm whether its zoning status has changed since the county's 2014 plan4. Septic permits remain with the local Sewage Enforcement Officer regardless of which authority handles zoning5.

Pennsylvania's state-park campground limits answer only how long someone may camp in a state park; they do not authorize residential RV use on private land24. A manufactured home also is not a shortcut around local land-use and utility review: although a new federally labeled unit installed to its approved design has limited treatment under the Uniform Construction Code, utility connections, grading, later additions, resale and relocation can bring state code requirements back into play25. Any occupied dwelling still needs an approved sewage solution, and new residences using water-conservation toilets need an approved method for washwater or excess liquid2226.

Building a home in Sullivan County: the steps, in order

  1. Identify the township or borough and confirm whether zoning approval comes from the county ordinance, a borough ordinance or a newer municipal rule34.
  2. Contact the Sullivan County COG for the building-permit application, enforcing authority, submission requirements and building-permit fee1161715.
  3. Start the septic-permit review with the local Sewage Enforcement Officer before finalizing the house site58.
  4. Submit any subdivision or land-development plan to Sullivan County Planning & Development using its published applications and checklists1918.
  5. Obtain a PennDOT Highway Occupancy Permit if the project builds or changes a driveway on state highway land12.
  6. If the site is in a Special Flood Hazard Area, obtain the municipality's floodplain-development permit before development begins6.
  7. Schedule the required building inspections, obtain the certificate of occupancy before moving in and provide proof of passed inspections for a completed public electric or gas connection71327.

What should you check before buying land in Sullivan County?

Start with sewage feasibility: Sullivan County's mapped soils show 0% without severe limits for a conventional septic drain field, so a favorable site evaluation may affect both the building location and purchase decision23. Check the flood map and ask the municipality for its current ordinance and administrator; development in a Special Flood Hazard Area requires a municipal floodplain-development permit before covered work begins286. Verify legal access as well; building or changing a driveway on Pennsylvania state highway land requires a PennDOT Highway Occupancy Permit12.

The county is sparsely settled at about 13 people per square mile and is 89.5% wooded, useful context for utility planning and site clearing2930. Farmland averages about $4,619 per acre, while the median annual property-tax bill is $1,959 and the effective rate is about 1.1%313233. Treat those countywide figures as context, then confirm the parcel's assessment, boundaries, easements, road status, private-well requirements and utility options before closing; Pennsylvania does not regulate private homeowner wells statewide, and we could not confirm a countywide private-well permit rule34.

Watch-outs

  • The COG contact page publishes 407-818-9743 for its Dushore office; because that is not a Pennsylvania area code, use sullivanctycog@gmail.com if the telephone number does not connect15.
  • Development in a Special Flood Hazard Area requires a floodplain-development permit from the applicable municipality; ask that municipality for its current ordinance and administrator before planning site work635.
  • The private-land rules for RV residence, tiny homes, setbacks and minimum dwelling size remain unconfirmed, so ask the applicable county or borough zoning authority before purchase34.

Sources

  1. Sullivan County Council of Governments — Permits (2026 county census)
  2. Uniform Construction Code, quoted and re-checked
  3. Sullivan County 2014 Hazard Mitigation Plan, quoted and re-checked
  4. Sullivan County 2014 Hazard Mitigation Plan, quoted and re-checked
  5. Act 537 Sewage Facilities, quoted and re-checked
  6. Flood Map FAQs, quoted and re-checked
  7. Apply for a Uniform Construction Code Building Permit, quoted and re-checked
  8. Municipal On Lot Sewage Service Areas, quoted and re-checked
  9. Local Registrations, Permits, Zoning (Pennsylvania statewide rule), quoted and re-checked
  10. Contractor Licensing (2026 county census)
  11. Apply for a Uniform Construction Code Building Permit, quoted and re-checked
  12. Apply for a PennDOT Highway Occupancy Permit, quoted and re-checked
  13. Pennsylvania Uniform Construction Code, Chapter 403, quoted and re-checked
  14. Pennsylvania Construction Code Act — Chapter 1 (Pennsylvania statewide rule), quoted and re-checked
  15. Sullivan County Council of Governments (COG) (sullivancountycog.com)
  16. Apply for a Uniform Construction Code Building Permit, quoted and re-checked
  17. Apply for a Uniform Construction Code Building Permit, quoted and re-checked
  18. Sullivan County Planning & Development (sullivancountypa.gov)
  19. Planning & Development — Sullivan County, Pennsylvania, quoted and re-checked
  20. Pennsylvania Municipalities Planning Code (Pennsylvania statewide rule), quoted and re-checked
  21. PA DEP — Sewage Enforcement Officers (Act 537) (2026 county census)
  22. 25 Pa. Code § 72.22. Permit issuance (Pennsylvania statewide rule), quoted and re-checked
  23. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  24. RV and Tent Campsites (Pennsylvania statewide rule), quoted and re-checked
  25. Pennsylvania Uniform Construction Code, Chapter 403 (Pennsylvania statewide rule), quoted and re-checked
  26. 25 Pa. Code § 73.65. Recycling toilet, incinerating toilet or composting toilet (Pennsylvania statewide rule), quoted and re-checked
  27. Pennsylvania Uniform Construction Code, Chapter 403, quoted and re-checked
  28. Laws, Acts, and Regulations, quoted and re-checked
  29. Population density: Bolthole Index county data
  30. Wooded share of land: Bolthole Index county data
  31. Farmland value per acre (USDA census): Bolthole Index county data
  32. Median property tax bill: Bolthole Index county data
  33. Effective property tax rate: Bolthole Index county data
  34. Apply for a Water Well Drillers License and Rig Permit (Pennsylvania statewide rule), quoted and re-checked
  35. Laws, Acts, and Regulations, quoted and re-checked

Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like 5 of its 6 neighbors, Sullivan County requires a building permit for a home.

RuleSullivan CountyBradford CountyWyoming CountyLycoming CountyColumbia CountyMontour CountyLuzerne County
Building permitRequiredRequiredRequiredRequiredLimitedRequiredRequired
County zoningYesNoNoYesYesYesYes
Septic permitsMunicipal Sewage Enforcement OfficerLocal municipalPA DEP Act 537 Sewage Facilities ProgramPA DEP Act 537 programSEOMunicipal Sewage Enforcement OfficerPA DEP Act 537 Sewage Facilities Program

County locator

Sullivan County in Pennsylvania

77
County map
Sullivan County highlighted among the Pennsylvania counties · colored by Index score

How Sullivan County scores

Seclusion74100% ev.
Self-Sufficiency52100% ev.
Admin Boringness5890% ev.
Durability67100% ev.
Property Autonomy68100% ev.
Carry Cost75100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$219kTypical home
1.1%Property tax
$4,619Land / acre
47.6"Annual rain
0% of yrsSevere drought
0.3 / yr (+0.3)Mid-century 100°F days
9.8 daysMid-century dry spell
1.83" (+10%)Mid-century 1-day rain
1.55×Wildfire change factor
100%Forward climate coverage
$980Home insurance / yr
-0.7% / yrInsurance growth
0.89%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
6,692People within 30 min
1,809,322People within 2 hr
15,154Radius comparison (15 mi)
13People / sq mi
0%Federal land
69.2%Land at 15% slope or less
0%Soils rated "not limited" for septic (strict USDA rating)
0 acWorkable land screen
89.5%Wooded land
66.8 tonsBiomass / forest ac
45.8°FAvg temp

Scout Sullivan County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Sullivan County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Sullivan County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Cherry Township · Colley Township · Davidson Township · Borough of Dushore · Borough of Eagles Mere · Elkland Township · Forks Township · Borough of Forksville · Fox Township · Hillsgrove Township · Borough of Laporte · Laporte Township · Shrewsbury Township

Answers from the rulebook for Sullivan County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Sullivan County rules

  • County-wide zoningPresent (with conditions)

    Sullivan County zoning ordinance used in Cherry Township, Colley Township, and Davidson Township.

    • The source identifies the county zoning ordinance as being used by three of the county's 13 municipalities, not as a uniform land-use rule administered across every municipality.
    • Dushore Borough and Laporte Borough use local zoning ordinances.
    • Eagles Mere Borough, Elkland Township, Forks Township, Forksville Borough, Fox Township, Hillsgrove Township, Laporte Township, and Shrewsburry Township do not have a local zoning ordinance according to the cited plan.
    “Sullivan County has a county zoning ordinance. Three of the 13 municipalities within Sullivan County utilize the county zoning ordinances: Cherry Township, Colley Township, and Davidson Township.”
  • Local zoningVaries (with conditions)

    Aggregate zoning status across Sullivan County municipalities.

    • Cherry Township, Colley Township, and Davidson Township utilize the county zoning ordinance.
    • Dushore Borough and Laporte Borough utilize local zoning ordinances.
    • Eagles Mere Borough, Elkland Township, Forks Township, Forksville Borough, Fox Township, Hillsgrove Township, Laporte Township, and Shrewsburry Township do not have a local zoning ordinance according to the cited plan.
    • The source is the county's 2014 hazard mitigation plan; current municipal ordinances should be confirmed before parcel-level reliance.
    “Dushore Borough and Laporte Borough utilize local zoning ordinances. Eagles Mere Borough, Elkland Township, Forks Township, Forksville Borough, Fox Township, Hillsgrove Township, Laporte Township and Shrewsburry Township do not have a local zoning ordinance.”
  • Who permits septicLocal (with conditions)

    On-lot sewage permitting and enforcement serving Sullivan County municipalities.

    • The administering local agency may be an individual municipality, a group of municipalities, or a county health department or joint county health department.
    • Local agencies receive technical oversight and financial assistance from DEP.
    • Large-volume on-lot systems are an exception to the general local-agency responsibility described on the source page.
    “Local Agencies are responsible for carrying out on-lot or onsite ("septic system") sewage treatment system permitting and enforcement activities.”
  • Subdividing landRegulated (with conditions)

    Subdivision and land development in Sullivan County under the county planning process.

    • The county page identifies applications, checklists, and a Subdivision and Land Development Ordinance.
    • The page states that the amended ordinance was still being reviewed for adoption when retrieved.
    • Municipal and state requirements may also apply.
    “Here are the applications and checklists you need. In order to apply, please download the appropriate forms”
  • Building in a floodplainLimited

    Development within FEMA Special Flood Hazard Areas in Sullivan County, subject to the applicable municipality’s floodplain ordinance and NFIP requirements.

    • The official county hazard mitigation plan states that Sullivan County and 11 of its 13 municipalities participated in the NFIP and that all participating municipalities had floodplain regulations and ordinances; the source is a 2013 capability assessment published in the 2014 plan.
    • The specific ordinance, floodplain administrator, and delegation arrangement for each Sullivan County municipality were not identified in the opened official sources.
    • Municipalities may adopt regulations more restrictive than state and federal minimum requirements.
    • Development in a Special Flood Hazard Area may proceed only if it complies with the applicable local floodplain ordinance meeting NFIP criteria.
    “Sullivan County and 11 of its 13 municipalities participate in the NFIP. All eleven (11) municipalities that participate in the NFIP have floodplain regulations and ordinances.”

Pennsylvania rules that apply here

  • Building permitRequired

    Residential buildings and regulated electrical, gas, mechanical, and plumbing systems in Pennsylvania municipalities enforcing the Uniform Construction Code or under third-party agency enforcement.

    • The permit must be obtained before covered construction begins.
    • Emergency repairs or equipment replacement may proceed before application only if the permit application is submitted within 3 business days.
    • The regulation incorporates the exceptions in § 403.1(b), including specified UCC scope exclusions and exemptions.
    • No permit is required for listed limited work, including fences no more than 6 feet high; retaining walls no more than 4 feet high unless supporting a surcharge; certain water tanks up to 5,000 gallons with a height-to-diameter or width ratio no greater than 2 to 1; certain sidewalks and driveways no more than 30 inches above adjacent grade; prefabricated pools less than 24 inches deep; specified playground equipment; certain window awnings; uncovered decks no more than 30 inches above grade; communications wiring; ordinary repairs; and public-service-agency equipment.
    • The listed exemptions apply only if the work does not violate a law or ordinance.
    • Ordinary repair does not include cutting load-bearing walls or structural beams, changing required means of egress, or adding or relocating listed piping, wiring, or mechanical systems.

    emergency permit application deadline: 3 business days (after emergency repair or equipment replacement) · fence height exemption: <= 6 feet · retaining wall exemption height: <= 4 feet (unless supporting a surcharge) · water tank capacity exemption: <= 5000 gallons (height-to-diameter or width ratio no greater than 2 to 1) · sidewalk or driveway height exemption: <= 30 inches (not over a basement or story below) · prefabricated pool depth exemption: < 24 inches · uncovered deck height exemption: <= 30 inches

    “An owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a residential building [...] shall first apply to the building code official and obtain the required permit under § 403.62a (relating to permit application).”
    2 more reviewed findings on this topic
    • Required — Construction and building work in Sullivan County subject to the Pennsylvania Uniform Construction Code.
      “The UCC requires property owners to obtain a construction or building permit before starting any work.”
    • Required — Commercial buildings, structures, facilities, and regulated electrical, gas, mechanical, and plumbing systems in Pennsylvania jurisdictions enforcing the Uniform Construction Code.
      “An owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a commercial building, structure and facility [...] shall first apply to the building code official and obtain the required permit under § 403.42a (relating to permit application).”
  • Owner-builder exemptionAvailable

    A property owner performing construction work on the owner's own primary residence in Pennsylvania without compensation, and most construction work for which Pennsylvania does not impose a statewide contractor licensure or certification requirement.

    • Pennsylvania has no statewide licensure or certification requirement for most construction contractors or their employees.
    • For home-improvement regulation, the statutory exclusion applies to work performed without compensation by the owner of the owner's private residence or residential rental property.
    • The Home Improvement Consumer Protection Act excludes construction of a new home from the definition of home improvement.
    • Municipalities may impose their own contractor licensure or certification requirements.
    “The Commonwealth of Pennsylvania currently has no licensure or certification requirements for most construction contractors (or their employees).”
  • Building code adoptedAdopted

    Building construction throughout Pennsylvania under the Pennsylvania Uniform Construction Code.

    • The UCC is administered and enforced locally by municipalities that opt in, using municipal employees or certified third-party agencies.
    • In municipalities that opt out, the Department of Labor and Industry is responsible for commercial code enforcement, while certified third-party agencies hired by property owners or contractors enforce residential UCC requirements.
    • The Department has sole jurisdiction for elevators and state-owned buildings wherever located.
    • The 2021 accessibility updates are permanently enjoined; structures must still comply with the 2018 accessibility requirements, and the injunction does not affect enforcement of non-accessibility UCC requirements.
    • The revised regulations adopting the 2018 I-Code series became effective February 14, 2022. Contract-based transition rules allow certain projects with contracts signed before that date to use the UCC in effect at the time of contract if application was made by August 14, 2022 or earlier.
    • The 2021 I-Code accessibility provisions became effective December 25, 2021, with a contract-based transition period allowing applications by June 25, 2022 or earlier.
    • Pennsylvania's Uniform Construction Code triennial update was published November 8, 2025 and became effective January 1, 2026.

    2018 I-Code regulations effective date: 2022-02-14 (For contracts signed before this date, application and permit issuance under the UCC in effect at the time of contract were allowed if application was made by 2022-08-14.) · 2021 I-Code accessibility provisions effective date: 2021-12-25 (For contracts signed before this date, application and permit issuance under the UCC in effect at the time of contract were allowed if application was made by 2022-06-25.) · 2025 triennial UCC update effective date: 2026-01-01

    “Pennsylvania's statewide building code, generally known as the Uniform Construction Code (UCC), has to be followed by builders in the state.”
    2 more reviewed findings on this topic
    • Adopted (with conditions) — Construction governed by Pennsylvania's Uniform Construction Code in Sullivan County.
      “Pennsylvania's statewide building code, generally known as the Uniform Construction Code (UCC), has to be followed by builders in the state.”
    • Adopted (with conditions) — Pennsylvania Uniform Construction Code requirements applicable to construction in Sullivan County.
      “The revised regulations adopting the 2018 I Code series”
  • InspectionsRequired

    Residential construction for which a Pennsylvania Uniform Construction Code permit was issued.

    • The permit holder must keep construction accessible and notify the construction code official when work is ready.
    • Required inspection areas are foundations; plumbing, mechanical, and electrical systems; frame and masonry; and wallboard.
    • The official may conduct additional inspections for UCC or municipal-ordinance compliance.
    • A final inspection and final inspection report are required.
    • Third-party agencies under contract must submit the final inspection report to the property owner, builder, and designated lender.
    “A construction code official shall inspect all construction for which a permit was issued. The permit holder shall insure that the construction is accessible for inspection.”
    3 more reviewed findings on this topic
  • Certificate of occupancyRequired

    Use or occupancy of a commercial building, structure, or facility governed by the Pennsylvania Uniform Construction Code.

    • A building, structure, or facility may not be used or occupied without a certificate of occupancy issued by a building code official.
    • The certificate is issued within 5 business days after receipt of a final inspection report indicating UCC compliance.
    • A certificate may cover a portion that independently meets the UCC.
    • The certificate may be suspended or revoked for issuance in error, incorrect applicant information, or UCC violation; the owner may request a board-of-appeals hearing before revocation.
    • A temporary certificate may cover a portion before completion of all permitted work only if the portion may be occupied safely, and the official must set its validity period.
    • The certificate must include the permit number and address, permit holder information, covered portion, issuing official, applicable code edition, designated occupancy and construction classifications, special stipulations and conditions, accessibility variances, and final-inspection date.

    certificate issuance deadline: 5 business days

    “A building, structure or facility may not be used or occupied without a certificate of occupancy issued by a building code official.”
    3 more reviewed findings on this topic
  • Zoning districtsPartial

    Pennsylvania zoning requirements and district information; the official state source directs applicants to the local township, borough, or city.

    • Local registrations, permits, and zoning requirements must be addressed with the township, borough, or city where the activity will occur.
    • The source does not publish a statewide zoning-district map or a single statewide zoning-district schedule.
    • This claim does not identify or aggregate individual municipal zoning districts.
    “Local registrations, permits, zoning requirements and related questions should be directed to the township, borough, or city where you will be operating.”
  • Manufactured homesLimited

    Manufactured housing assembled and shipped by the manufacturer and bearing the required federal-construction-and-safety label, including changes in occupancy, resale, relocation, additions, repairs, utility connections, and grading addressed by Pennsylvania's Uniform Construction Code.

    • For new labeled manufactured housing installed in conformity with the manufacturer's approved design, the UCC does not apply except as provided in the regulation.
    • Construction activities or processes, including utility connections and grading, that are not addressed by the manufacturer's approved design must comply with the UCC.
    • The UCC applies to alterations or repairs outside the federal manufactured-home standards and manufacturer installation instructions after assembly and shipment.
    • The UCC applies to additions after delivery to the site.
    • The UCC applies to construction, alteration, repair, or change of occupancy if the manufactured housing is resold to a subsequent purchaser.
    • The UCC applies to construction, alteration, repair, or change of occupancy if the original purchaser relocates the manufactured housing.
    • Pennsylvania building-permit guidance states that manufactured housing projects require inspections for site preparation, foundation construction, repairs, and changes in occupancy.
    • This state construction-code rule does not resolve local zoning, land-use siting, or utility/septic approval requirements.
    “Construction, alteration, repair or change of occupancy if the original purchaser relocates the manufactured housing.”
  • Septic permitRequired

    Installation, construction, occupancy, or use of a building served by an individual or community onlot sewage system statewide.

    • A permit must be obtained from the local agency before installation, contracting for construction, construction, occupancy, or use.
    • Multiple chemical or portable toilets for temporary construction, recreation, or temporary facilities are covered by one permit.
    • A permit is not required for a recycling, incinerating, or composting toilet where the existing onlot system is not altered.
    • A permit exemption may apply to an individual onlot system serving an owner or immediate-family residence on a contiguous tract of at least 10 acres, subject to the owner-of-record date, local ordinance exception, notification, and siting requirements.
    • A permit is not required for a replacement dwelling when the local agency determines the size and anticipated use are the same as or less than the prior dwelling and the prior dwelling was in use within one year, except during an active malfunction investigation.

    permit-exemption tract size: >= 10 acres (Only under the specific owner/immediate-family and January 10, 1987 owner-of-record conditions.) · permit-exempt siting distance: >= 200 feet (Applies to septic tanks and absorption areas from listed property, water, floodplain, and related features.) · permit-exempt utility right-of-way distance: >= 10 feet · local-agency verification fee cap: <= 25 USD (For verifying siting of a permit-exempt system.)

    “without first obtaining a permit from the local agency, except as provided in subsections (c)—(e).”
    One more reviewed finding on this topic
    • Required — Retaining tanks and individual or community on-lot sewage systems covered by Act 537.
      “local agencies are responsible for issuing permits for retaining tanks or for individual and community on-lot sewage systems”
  • Septic inspectionLimited

    Individual and community sewage-disposal systems before concealment or covering after construction.

    • The system may not be covered until approval to cover is given by the original permit issuer or authorized representative.
    • If 72 hours have elapsed after notification of construction completion, excluding Sundays and holidays, the applicant may cover the system unless permission has been refused.

    post-completion waiting period: 72 hours (Sundays and holidays excluded.)

    “shall be covered from view until approval to cover the same has been given by the body which issued the original permit”
  • Off-grid sanitationLimited

    Composting, incinerating, recycling, and similar water-conservation toilets used for residential or establishment sanitation statewide.

    • For a new residence or establishment, an onlot sewage system or other approved disposal method must treat washwater or excess liquid, and both facilities must be under one permit, except for the retaining-tank exception.
    • For an existing residence or facility with no alteration of the onlot system, no permit is required for installation.
    • A composting or incinerating toilet on a qualifying retaining-tank lot is treated as and permitted as a privy.
    • The device must meet manufacturer specifications and be operated and maintained to prevent pollution or health hazards.
    • Liquid discharges are prohibited unless sent to a compliant onlot sewage system or another method approved under the chapter or by DEP.
    • Recycling, incinerating, and composting toilets must bear the NSF Standard No. 41 seal.
    “an onlot sewage system or other approved method of sewage disposal shall be provided for treatment of washwater or excess liquid from the unit”
  • Well permitLimited

    Water-well drilling statewide, distinguishing commercial water-well drillers from farmers and homeowners drilling their own wells on owned or leased land.

    • Water-well drilling companies must obtain a license and permits.
    • The licensing requirement does not apply to farmers or homeowners who drill their own water wells on their own or leased land.
    • The state has construction standards for public water-supply wells but not private water wells.
    • Drillers must submit the well's construction details to the state and the well owner.

    driller license year: June 1-May 31 · annual driller license fee: 60 USD · rig permit fee: 20 USD

    “Water well drilling companies must get a license and permits to drill a well in Pennsylvania.”
  • Mandatory utility hookupConditional

    Completed UCC-regulated construction in Sullivan County seeking public electric or gas connection.

    • A building code official may authorize temporary connection during construction.
    • Completed public electric or gas connection requires written proof that the building or structure passed inspections.
    “building or structure passed inspections under this chapter.”
  • Agricultural exemptionAvailable (with conditions)

    Qualifying agricultural buildings under Pennsylvania's Construction Code Act and Uniform Construction Code.

    • The exemption applies to an agricultural building as defined by the Act: a structure used to store farm implements, hay, feed, grain, or other agricultural or horticultural products; house poultry, livestock, or other farm animals; serve as a milk house; or grow mushrooms, agricultural, or horticultural products.
    • The definition includes a qualifying carriage house owned and used by members of a recognized religious sect for housing horses and storing buggies.
    • The definition includes a structure less than 1,000 square feet used to process maple sap.
    • The structure must not include habitable space.
    • The structure must not contain spaces where agricultural products are processed, treated, or packaged.
    • The structure is not a place of occupancy by the general public.
    • Other municipal land-use, zoning, fire, electrical, health, or environmental requirements may still apply; the cited exclusion is from the Construction Code Act.

    maple sap processing structure area: < 1000 square feet (Must otherwise meet the statutory agricultural-building definition.)

    “(b) Exclusions.--This act shall not apply to any of the following: [...] (4) Any agricultural building.”
    One more reviewed finding on this topic
    • Available (with conditions) — Agricultural buildings covered by Pennsylvania's Uniform Construction Code Act.
      ““Agricultural building.” A structure utilized to store farm implements, hay, feed, grain or other agricultural or horticultural products or to house poultry, livestock or other farm animals, a milk house and a structure used to grow mushrooms. The term includes a carriage house owned and used by members of a recognized religious sect for the purposes of housing horses and storing buggies. The term shall not include habitable space or spaces in which agricultural products are processed, treated or packaged and shall not be construed to mean a place of occupancy by the general public. [...] (4) any agricultural building;”
  • Driveway accessRequired

    Construction or alteration of a driveway connected to Pennsylvania state highway land, including a driveway connecting to a PennDOT drainage facility.

    • The requirement applies to building or changing a driveway on state highway land.
    • A permit is also required if the driveway connects to a PennDOT drainage facility.
    • Paving may be considered maintenance only in some cases; PennDOT advises applicants to contact it to determine whether that exception applies.
    • Permits are usually given within 30 days when the needed information is provided and the application follows PennDOT regulations.
    • PennDOT has 60 days to review each application and aims to finish reviews within 30 days.
    • A minimum-use driveway is expected to be used by no more than 25 vehicles per day, or 50 average daily traffic.

    minimum-use driveway traffic: <= 25 vehicles per day (Equivalent to 50 average daily traffic.)

    “You need a permit when you're building or changing a driveway, road, drainage or utility facility on the state highway land.”
    2 more reviewed findings on this topic
    • Required — Driveways connecting to Pennsylvania state highway land in Sullivan County.
      “You need a permit when you're building or changing a driveway, road, drainage or utility facility on the state highway land. If it connects to a PennDOT drainage facility, you also need a permit.”
    • Required — Construction or alteration of a driveway or road on Pennsylvania state highway land, and access connecting to a PennDOT drainage facility.
      “You need a permit when you're building or changing a driveway, road, drainage or utility facility on the state highway land.”
  • Short-term rentalsLimited

    Short-term lodging rentals of rooms, apartments, or houses for fewer than 30 days to the same person in Pennsylvania.

    • The Pennsylvania hotel occupancy tax rate is 6 percent.
    • Allegheny and Philadelphia counties have an additional 1 percent local hotel tax collected by the Department of Revenue.
    • Some counties impose an additional tax collected by the county treasurer.
    • If the taxpayer does not exclusively use a third-party booking site, or the broker does not collect and remit the hotel occupancy tax, the taxpayer must register with the Department of Revenue for a Sales, Use and Hotel Occupancy Tax License.
    • If a taxpayer exclusively uses a third-party booking site and the broker confirms collection and remittance, the homeowner should not register for a Sales, Use and Hotel Occupancy Tax License.

    lodging duration threshold: < 30 days (To the same person.) · Pennsylvania hotel occupancy tax rate: 6 percent

    “anyone who rents out their property to provide lodging for less than 30 days to the same person must collect and remit”
  • Permit feesVariable (with conditions)

    PennDOT Highway Occupancy Permit fees for driveways, local roads, and related facilities in Pennsylvania state highway rights-of-way.

    • The fee depends on the permit type and applicable regulation.
    • Applicants must contact the district permit manager or consult Pennsylvania Code Title 67, Chapter 441.4 for driveway fees or Chapter 459.4 for utility fees.
    “Permit costs vary. Please contact the district permit manager or consult our regulations. View the Pennsylvania Code, Title 67, Chapter 441.4 or driveway fees or Chapter 459.4 for utility fees.”
    2 more reviewed findings on this topic
    • Published (with conditions) — Pennsylvania Department of Labor and Industry UCC permit applications where the Department has jurisdiction.
      “A check or money order made payable to the Commonwealth of Pennsylvania for the applicable fee.”
    • Variable (with conditions) — PennDOT highway occupancy permits, including driveway permits, for work involving state highway land or a PennDOT drainage facility.
      “Permit costs vary. Please contact the district permit manager or consult our regulations. View the Pennsylvania Code, Title 67, Chapter 441.4 or driveway fees or Chapter 459.4 for utility fees.”
  • Permit processPublished (with conditions)

    Pennsylvania Uniform Construction Code building permits for construction and building work subject to the UCC.

    • A UCC building permit must be obtained before starting work.
    • Inspections are required in several listed cases, including commercial or residential building changes, electrical, gas, mechanical or plumbing systems, swimming pools or hot tubs, and specified manufactured or industrialized housing work.
    • A UCC certificate of occupancy must be issued before a building or facility can be used.
    • Emergency repairs or equipment replacements may proceed without a permit if an application is submitted to the building code official within three business days.
    “The UCC requires property owners to obtain a construction or building permit before starting any work.”
    3 more reviewed findings on this topic
    • Published (with conditions) — UCC building permit applications handled by Pennsylvania Department of Labor and Industry.
      “We are currently accepting plans through Electronic Plan Review (EPR) and by paper submissions.”
    • Published (with conditions) — Pennsylvania UCC building-permit process applicable in Sullivan County.
      “The following items (1-9) constitute a complete UCC application package”
    • Partial — Local registrations, permits, and zoning inquiries for businesses and development in Pennsylvania.
      “Local registrations, permits, zoning requirements and related questions should be directed to the township, borough, or city where you will be operating.”
  • Campground & park staysLimited

    RV use and occupancy at Pennsylvania state park campgrounds.

    • Use must occur at a state park campground and comply with campsite rules.
    • Campers may stay up to 14 consecutive nights from Memorial Day to Labor Day.
    • Campers may camp up to 21 consecutive nights during the remainder of the year.
    • Campers must vacate and remove all equipment for 48 hours between reservations.
    • A maximum of two sleeping units is permitted per campsite, of which only one may be wheeled.
    • Campsite occupancy is limited to one family unit or one non-family unit limited to five persons per site.
    • The page does not establish statewide permission for long-term or residential RV occupancy outside state park campgrounds.

    maximum stay, Memorial Day to Labor Day: 14 consecutive nights · maximum stay, remainder of year: 21 consecutive nights · equipment-removal interval between reservations: 48 hours · maximum sleeping units per campsite: 2 units (Only one may be wheeled.) · maximum non-family occupancy: 5 persons per site (One family unit is permitted instead.)

    “maximum of two sleeping units are permitted per campsite, of which only one may be wheeled.”
    One more reviewed finding on this topic
    • Limited — Temporary camping at Pennsylvania state park campgrounds.
      “Campers may camp for up to 21 consecutive nights”
  • county zoning authorityLimited

    County zoning authority over land in Pennsylvania municipalities that lack an effective municipal zoning ordinance.

    • County zoning power is limited to land in municipalities wholly or partly within the county that have no zoning ordinance in effect when the county zoning ordinance is introduced and until the municipal zoning ordinance becomes effective.
    • A zoning ordinance enacted by a municipality other than the county repeals the county zoning ordinance pro tanto within that municipality.
    • The statute defines a county under the Pennsylvania Municipalities Planning Code as a county of the second through eighth class.
    “The powers of the governing bodies of counties to enact, amend and repeal zoning ordinances shall be limited to land in those municipalities, wholly or partly within the county, which have no zoning ordinance in effect at the time a zoning ordinance is introduced before the governing body of the county and until the municipality's zoning ordinance is in effect. The enactment of a zoning ordinance by any municipality, other than the county, whose land is subject to county zoning shall act as a repeal protanto of the county zoning ordinance within the municipality adopting such ordinance.”
    One more reviewed finding on this topic
    • Limited — Pennsylvania counties adopting and enforcing zoning ordinances on unincorporated land.
      “Section 602. County Powers.--The powers of the governing bodies of counties to enact, amend and repeal zoning ordinances shall be limited to land in those municipalities, wholly or partly within the county, which have no zoning ordinance in effect at the time a zoning ordinance is introduced before the governing body of the county and until the municipality's zoning ordinance is in effect.”
  • county building authorityLimited

    Pennsylvania county authority over building-code administration and enforcement for residential construction in unincorporated areas.

    • The general Pennsylvania Construction Code Act assigns administration and enforcement to municipalities, not counties.
    • A county of the second class may retain authority only if it has adopted a plumbing code and accompanying rules and regulations under the Local Health Administration Law.
    • The retained authority is limited to promulgating and enforcing that plumbing code and making changes that meet the minimum requirements of the Uniform Construction Code.
    • The official Department of Labor and Industry page states that residential UCC requirements in opt-out municipalities are enforced by certified third-party agencies hired by property owners or contractors.
    “A county of the second class that has adopted a plumbing code and accompanying rules and regulations pursuant to the act of August 24, 1951 (P.L.1304, No.315), known as the Local Health Administration Law, shall retain the authority to promulgate and enforce such plumbing code and to make such changes as it deems necessary, provided that such changes meet the minimum requirements as defined in the Uniform Construction Code.”

Set by your town or city, not the county

In Pennsylvania, zoning is adopted by each town or city, so Sullivan County has no county-wide answer on these. Find your town or city in the list of places on this page, or call its clerk or zoning administrator.

  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Sullivan County, Pennsylvania

Is Sullivan County a good place to live off-grid or homestead?

Sullivan County scores 77/100 on the Bolthole Index, a strong county profile. Its strengths: manageable long-term carry cost and sparse surroundings — about 6,692 people within a 30-minute drive.

Do you need a building permit in Sullivan County, Pennsylvania?

Sullivan County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by Municipal Sewage Enforcement Officer (Code Inspections, Inc.), coordinated via Sullivan County COG under PA DEP Act 537. Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Sullivan County, Pennsylvania?

Land in Sullivan County runs about $4,619 per acre, based on the latest county data.

What is the water situation in Sullivan County?

Sullivan County gets about 47.6" of rain a year, with severe drought in roughly 0% of years.

How remote is Sullivan County?

A representative private-land location has about 6,692 people within a 30-minute drive and 1,809,322 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Sullivan compares in Pennsylvania

Compare side-by-side →See all 67 Pennsylvania counties ranked →