Buffalo Township in Washington County, Pennsylvania zones its own land1 and has adopted the Uniform Construction Code as its building code2, so a new home needs a building permit under that code3. Septic permits come from a Sewage Enforcement Officer employed by or contracted to the Township4. Washington County does not zone for the Township5.
At a glance
- Zoning
- Yes, set by the Township; districts include R-S, A-R, R-P, C-H and L-116
- Building permit
- Uniform Construction Code adopted as the Township building code23
- Certificate of occupancy
- Required before occupying a new structure7
- Septic
- Permit from the Township's Sewage Enforcement Officer48
- Minimum lot, A-R district
- One acre for a single-family dwelling9
- Subdivision
- Regulated by the Township, with county planning review1011
Who to call
Zoning
Buffalo Township Zoning Officer (Harshman CE Group)
Zoning questions and zoning permit applications for land inside Buffalo Township
2455 Park Avenue Washington, PA 15301
Building permits
Buffalo Township (Uniform Construction Code administration)
Building permits and inspections under the Uniform Construction Code inside Buffalo Township
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in Buffalo Township means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Buffalo Township, PA have zoning?
Yes. Buffalo Township adopted its zoning chapter through its Board of Supervisors1, and the Township is divided into R-S Suburban Residential, A-R Rural Agricultural, R-P Planned Residential Development, C-H Highway Commercial and L-1 Light Industrial districts, shown on the Zoning Map6. Washington County does not enforce zoning here; the county directs zoning questions to the municipality where the property sits5.
Lot size depends on the district. In the A-R Rural Agricultural District a single-family dwelling needs one acre9. In R-S Suburban Residential a sewered single-family lot needs 10,500 square feet and an unsewered one needs 1 acre12. State on-lot sewage standards apply where they are stricter9. R-S setbacks are 50 feet front, 15 feet side and 30 feet rear13.
We could not confirm Township rules on RV occupancy, tiny homes, accessory dwellings, minimum house size or short-term rentals. Ask the Township Zoning Officer14 before relying on any of these.
Do you need a building permit in Buffalo Township, and who issues it?
Pennsylvania requires a Uniform Construction Code (UCC) building permit before construction or building work begins3. Buffalo Township has adopted the UCC as its municipal building code2, and its code states that the Township elects to administer and enforce the Pennsylvania Construction Code Act15. Agricultural buildings are excluded from the UCC, but that does not exempt them from zoning, septic or floodplain rules16.
A certificate of occupancy is required before anyone occupies a new structure, a new owner or tenant moves into an existing one, or the use changes7. Fees are set by Township resolution17. We could not confirm a separate Township rule for owner-built homes, so plan on the same permit as any other builder.
Zoning permits are a separate step: applications go in writing to the Township Zoning Officer, with building and plot plans18.
How do septic permits work in Buffalo Township?
Buffalo Township runs its own on-lot sewage program. No one may install an on-lot sewage system that needs a permit until a Sewage Enforcement Officer employed by or contracted to the Township issues it4. Applicants apply to the Township's agency, except those who qualify for an exemption under Section 7(a)(1) of the state Sewage Facilities Act8.
Holding tanks are restricted. In the R-S and A-R districts, new holding tanks are no longer allowed for newly constructed homes19. Where a holding tank is allowed, the Sewage Enforcement Officer may inspect it at least once per year at the owner's expense20.
Soils matter: only 0.2% of Washington County soils rate as not limited for a conventional drain field, so expect a site evaluation and possibly an engineered system21.
Can you live in an RV or tiny home in Buffalo Township?
We could not confirm any Buffalo Township rule on RV occupancy, temporary camping or tiny homes. Because the Township zones its land1, the answer depends on the zoning district and the Zoning Officer's reading of the ordinance, so do not assume either way. Call the Zoning Officer14 before parking or placing anything on a lot. Mobile-home parks are a conditional use in R-S and A-R, but we could not confirm a rule for an individual manufactured home. Separately, Pennsylvania's UCC still regulates building permits and certificates of occupancy for installing new manufactured housing22.
Building a home in Buffalo Township: the steps, in order
- Confirm the zoning district and lot-size rules with the Zoning Officer14.
- If you are dividing land, submit the plan to the Township and the Washington County Planning Commission, which reviews it before the Township can approve11. The Township regulates subdivision and land development under an ordinance amended in its entirety in 202110.
- Get a septic permit from the Township's Sewage Enforcement Officer8.
- Get the Uniform Construction Code building permit2.
- Pass the required inspections23.
- Obtain the certificate of occupancy before moving in7.
What to check before you buy land in Buffalo Township
Check the zoning district on the Zoning Map, since lot size and setbacks differ by district6. Check whether the lot has public sewer, because R-S allows a smaller sewered lot12. Construction in a flood plain needs documentation sealed by a registered design professional24. Pennsylvania has no construction standards for private water wells, and homeowners drilling their own well are not covered by the driller licensing rule25; we could not confirm a Township well rule.
Washington County's effective property tax rate is 1.1%26. For land outside Buffalo Township, see the Washington County page.
Watch-outs
- Construction in a flood plain needs sealed documentation under the state building permit rules24; we could not confirm a Township driveway or floodplain permit, so ask the Zoning Officer before you grade or build near a creek.
- Zoning Officer duties are handled through a contracted firm, so confirm current contact details on the Township's zoning page before visiting14.
- Septic exemptions under Section 7(a)(1) of the Sewage Facilities Act exist, but zoning and building permits still apply8.
Sources
- Chapter 265: Zoning - Township of Buffalo, PA (Buffalo Township), quoted and re-checked
- Chapter 103: Construction Codes, Uniform (Buffalo Township), quoted and re-checked
- Apply for a Uniform Construction Code Building Permit, quoted and re-checked
- Chapter 179: Sewers and Sewage Disposal (Buffalo Township), quoted and re-checked
- Subdivision & Land Development Review, quoted and re-checked
- Article II: Designation of Zoning Use Districts And Regulations (Buffalo Township), quoted and re-checked
- ecode360.com (Buffalo Township), quoted and re-checked
- Chapter 179: Sewers and Sewage Disposal (Buffalo Township), quoted and re-checked
- Article IV: Rural Agricultural District Regulations (Buffalo Township), quoted and re-checked
- Township of Buffalo, PA Subdivision and Land Development (Buffalo Township), quoted and re-checked
- Washington County Planning Commission Subdivision and Land Development Review Policy, quoted and re-checked
- Article III: Suburban Residential District Regulations (Buffalo Township), quoted and re-checked
- Article III: Suburban Residential District Regulations (Buffalo Township), quoted and re-checked
- Buffalo Township Zoning Officer (Harshman CE Group) (buffalotwp.com)
- Buffalo Township (Uniform Construction Code administration) (ecode360.com)
- Pennsylvania Construction Code Act, quoted and re-checked
- Chapter 103: Construction Codes, Uniform (Buffalo Township), quoted and re-checked
- ecode360.com (Buffalo Township), quoted and re-checked
- Chapter 179: Sewers and Sewage Disposal (Buffalo Township), quoted and re-checked
- Chapter 179: Sewers and Sewage Disposal (Buffalo Township), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- pa.gov, quoted and re-checked
- Apply for a Uniform Construction Code Building Permit, quoted and re-checked
- Apply for a Uniform Construction Code Building Permit, quoted and re-checked
- Apply for a Water Well Drillers License and Rig Permit, quoted and re-checked
- Effective property tax rate: Bolthole Index county data
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.