Upper Burrell Township, in Westmoreland County, Pennsylvania, requires a building permit approved before construction begins1. The township also has its own zoning ordinance, Chapter 3502, while Westmoreland County has no countywide zoning3. Septic permits are issued by a local sewage enforcement agency under state oversight4; we could not confirm which agency covers township parcels, so ask the township office.
At a glance
- Building permit
- Required; must be approved before work begins1
- Building code
- Pennsylvania Uniform Construction Code, adopted by the township5
- Zoning
- Township zoning ordinance (Chapter 350); the county has none23
- Zoning permit
- Required for projects subject to township zoning2
- Driveway
- Township minimum use driveway permit for driveways serving 25 or fewer vehicles per day6
- Septic
- Local sewage enforcement agency under state rules; confirm with the township4
- Owner-builder
- No state contractor license needed for your own primary residence; permit still required7
- RV and tiny home living
- Not confirmed; ask the township zoning office8
Who to call
Building permits
Upper Burrell Township Municipal Office
The township's municipal office; building permit and zoning applications are published on the township forms page
3735 7th Street Rd. New Kensington, PA 15068
Zoning
Upper Burrell Township forms and permit applications
Building permit, zoning permit and minimum use driveway permit applications
Planning & zoning
Westmoreland County Department of Planning and Development
General county planning contact; confirms the county has no building-permit office or zoning ordinance and directs residents to their local municipality for both
40 N Pennsylvania Ave, 5th Floor, Suite 520, Greensburg, PA 15601
Septic permits
Pennsylvania DEP Bureau of Water Quality Management (Westmoreland County)
State oversight of public sewage and on-lot septic systems; parcel permits come from a local sewage enforcement agency
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in Upper Burrell Township means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Upper Burrell Township, Pennsylvania?
Yes. Upper Burrell Township requires a building permit for construction, alterations and structural improvements, and the permit must be approved before work begins1. The township has adopted the Pennsylvania Uniform Construction Code as its municipal building code5. Fees are set by township resolution rather than in the code itself, so ask the township office for the current fee schedule9.
Pennsylvania lets an owner do construction work on their own primary residence without a general contractor license, but that does not waive the permit7. We could not confirm the township's inspection stages or certificate-of-occupancy steps, so ask the township office which inspections it expects before you pour or frame.
Who issues building permits in Upper Burrell Township?
The township does, not Westmoreland County. The county says all permits are handled at the municipal level and tells residents to contact their local municipality10. Start with the11 at (724) 335-3517, and use the building permit application on the township's forms page12.
For land outside the township, see the Westmoreland County page; the county has no zoning ordinance of its own3.
Does Upper Burrell Township have zoning?
Yes. Upper Burrell Township adopted its own zoning ordinance, Chapter 350 of the township code, and its districts include R-A Agricultural Residential and R-1 Single-Family Residential28. Ask the township office whether your project needs a zoning permit before work or a change of land use begins2.
In both the R-A and R-1 districts, principal structures may be 2 1/2 stories but no more than 35 feet tall; a single-family dwelling can gain up to 10 additional feet if side and rear setbacks grow by the same number of feet1314.
Because zoning is local, we could not confirm rules on RV living, tiny homes or accessory dwellings. Ask the township zoning office before you buy; do not assume anything is allowed.
How do septic permits work in Upper Burrell Township?
Pennsylvania requires a permit for an individual or community on-lot sewage system, and local agencies issue those permits under state rules4. The state Department of Environmental Protection oversees the program, while a municipal Sewage Enforcement Officer usually handles day-to-day permitting15.
We could not confirm which agency covers Upper Burrell Township parcels. The township office is the right first call; the DEP's Bureau of Water Quality Management is the backstop at 724-925-550016. Soils matter: only a very small share of Westmoreland County soils is rated not limited for a conventional drain field, so plan on a site evaluation and possibly an engineered system17.
Do you need a driveway permit in Upper Burrell Township?
Yes, for a typical home driveway. The township requires a Minimum Use Driveway Permit for driveways serving 25 or fewer vehicles per day, to make sure the design meets township safety standards6. A driveway that connects to a state highway also needs a PennDOT highway occupancy permit18.
Building a home in Upper Burrell Township: the steps, in order
- Call the township municipal office at (724) 335-3517 to confirm your parcel's zoning district and what the zoning ordinance allows211.
- Get a septic site evaluation through the local Sewage Enforcement Officer, or confirm public sewer is available4.
- Apply for the building permit, and for a zoning permit if the township says your project needs one; the building permit must be approved before work begins1.
- If you are creating a new lot, check the township's subdivision and land development rules in Chapter 29219.
- Apply for the driveway permit, and a PennDOT permit if you meet a state road618.
- Ask the township which inspections and occupancy sign-off apply before you move in.
What to check before you buy land in Upper Burrell Township
Confirm the zoning district and whether the use you want, including an RV or tiny home, is allowed. Ask about floodplain status: the township code has a floodplain management chapter, and Pennsylvania requires a permit for development in a Special Flood Hazard Area20.
For context, Westmoreland County's median property tax bill is about $2,473 a year at an effective rate of 1.3%2122, and the typical home value is about $215,43823. These are county-level figures, not township-specific.
Watch-outs
- Westmoreland County does not issue building permits or run zoning, so the county planning counter is the wrong office for Upper Burrell Township parcels10.
- We could not confirm township rules on RV living, tiny homes, accessory dwellings or minimum home size; ask the township office before you buy.2
- We could not confirm which sewage enforcement agency covers Upper Burrell Township; ask the township office before you spend on soil testing.4
- Permit fees are set by township resolution and can change, so ask for the current fee schedule9.
Sources
- Upper Burrell Township Forms, Permits & Fee Schedule (Upper Burrell Township), quoted and re-checked
- Chapter 350 Zoning — Township of Upper Burrell, PA (Upper Burrell Township), quoted and re-checked
- Subdivision, Development & Zoning, quoted and re-checked
- Municipal On Lot Sewage Service Areas, quoted and re-checked
- Chapter 119 Construction Codes, Uniform — Township of Upper Burrell, PA (Upper Burrell Township), quoted and re-checked
- Upper Burrell Township Forms, Permits & Fee Schedule (Upper Burrell Township), quoted and re-checked
- Contractor Licensing (Pennsylvania statewide rule), quoted and re-checked
- Chapter 350 Zoning — Township of Upper Burrell, PA (Upper Burrell Township), quoted and re-checked
- Chapter 119 Construction Codes, Uniform — Township of Upper Burrell, PA (Upper Burrell Township), quoted and re-checked
- Westmoreland County Department of Planning and Development (westmorelandcountypa.gov)
- Upper Burrell Township Municipal Office (upperburrelltwp.com)
- Upper Burrell Township Forms, Permits & Fee Schedule (Upper Burrell Township), quoted and re-checked
- Article IV R-A Agricultural Residential District — Township of Upper Burrell, PA (Upper Burrell Township), quoted and re-checked
- Article V R-1 Single-Family Residential District — Township of Upper Burrell, PA (Upper Burrell Township), quoted and re-checked
- Westmoreland County FAQ (septic handled by state DEP) (2026 county census)
- Pennsylvania DEP Bureau of Water Quality Management (Westmoreland County) (westmorelandcountypa.gov)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Apply for a PennDOT Highway Occupancy Permit (Pennsylvania statewide rule), quoted and re-checked
- Chapter 292 Subdivision and Land Development — Township of Upper Burrell, PA (Upper Burrell Township), quoted and re-checked
- PennsylvaniA Floodplain Development Guide (Pennsylvania statewide rule), quoted and re-checked
- Median property tax bill: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
- Typical home value (Zillow): Bolthole Index county data
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.