Zoning, building permits and sewer rules in the Borough of New Salem, Pennsylvania

The Borough of New Salem in York County, Pennsylvania has its own zoning ordinance, Chapter 240, with a zoning hearing board and a zoning enforcement officer1. Building permits are required under the Uniform Construction Code the borough adopted, and applicants deal with both the building code official and the zoning enforcement officer2. We could not confirm who issues septic permits here; ask the borough office first.

At a glance

Zoning
Yes, borough ordinance with four zones: SF, VC, MU and GR13
Building permit
Required under the Pennsylvania Uniform Construction Code, adopted by the borough42
Occupancy certificate
Required, issued together with the zoning use and occupancy certificate5
Minimum lot (SF zone)
15,000 sq ft with public water and sewer; 1 acre with neither6
Setbacks (SF zone)
35 ft front, 10 ft each side, 30 ft rear7
Public sewer
Buildings within 200 feet of the sewer system must connect8
Septic permits
A local agency issues them; the agency for New Salem is unconfirmed9

Who to call

Building permits

Borough of New Salem building code official and zoning enforcement officer

Building permits, inspections and use and occupancy certificates inside New Salem borough, coordinated with zoning

Planning & zoning

York County Planning Commission

Municipal contact lookup for York County; it does not issue building permits

717-771-9870

28 E Market Street, 3rd Floor, York, PA 17401

Online permits →

Contact details are copied from each office’s official page and were checked against it on October 14, 2026.

Off-grid gear

Going off-grid in Borough of New Salem means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does New Salem have zoning, and what does it mean for lot size and setbacks?

Yes. The Borough of New Salem in York County zones its own land under Chapter 240, with a zoning map, a zoning hearing board and a zoning enforcement officer1. The borough has four zones: single-family residential (SF), village center (VC), mixed-use (MU) and general residential (GR)3.

In the SF zone, the minimum lot depends on utilities: 15,000 square feet with public water and sewer, 20,000 with one of them, and 1 acre with neither6. SF setbacks are 35 feet in front, 10 feet on each side and 30 feet in the rear7. Impervious surface may cover no more than 45% of an SF lot10, and a principal building may rise 2 1/2 stories but not over 30 feet11.

Farm buildings on an existing farm are allowed by right in SF and are exempt from the height limits only12. We could not confirm the rules for RVs, tiny homes, accessory dwellings or manufactured homes; ask the zoning enforcement officer before you plan around them.

Do you need a building permit in New Salem, and who issues it?

Yes. New Salem borough has adopted Pennsylvania's Uniform Construction Code as its municipal building code4. The applicant pays a fee at the time of application and requests permits from both the borough's building code official and its zoning enforcement officer213.

Inspections and occupancy certificates run through the same two offices: final building inspections are conducted together with the zoning inspections14, and a use and occupancy certificate is required under both the construction code and Chapter 2405.

The York County Planning Commission does not issue building permits; the municipality does15. We did not find a published borough fee schedule or confirm which exemptions the borough applies, so ask the borough office for current fees.

How do septic and sewer work inside New Salem?

New Salem has a public sewer system, and an improved property with a building any part of which is within 200 feet of it must connect: apply for the permit within 30 days of borough notice and connect within 90 days8. In the SF zone, public water is also required where capacity is available and extension is feasible8.

Where no sewer is available, Pennsylvania requires a permit from the local agency before an on-lot sewage system is installed or used9. Local agencies may be municipalities, groups of municipalities or county health departments16. We could not confirm which agency serves New Salem, so ask the borough office before you buy a lot without sewer access.

A lot on neither public water nor sewer needs 1 acre in the SF zone, so on-lot sewage is the main reason to check lot size first6.

Building a home in New Salem: the steps, in order

  1. Confirm the zone (SF, VC, MU or GR) and the lot standards that apply to it with the zoning enforcement officer3.
  2. Check whether public sewer is within 200 feet, and plan for connection if it is8.
  3. Apply to both the building code official and the zoning enforcement officer, and pay the permit fee2.
  4. If the driveway meets a state highway, apply for a PennDOT highway occupancy permit; PennDOT usually issues it within 30 days when the application is complete17.
  5. Schedule inspections; final inspections are coordinated with zoning inspections14.
  6. Obtain the use and occupancy certificate before moving in5.

What stays with York County, and what should you check before you buy?

York County does not run zoning for the borough: zoning and land use policy is delegated to municipalities18. For land outside the borough, see the York County page, because each township sets its own rules.

As a county-level reference, York County's effective property tax rate is 1.7%19 and the median property tax bill is $3,947 a year20. Floodplain development requires a permit from the municipality21, and the borough also has a construction-in-flood-prone-areas chapter we have not reviewed. Private water wells are not subject to state construction standards, and homeowners may drill their own on their own land22.

Watch-outs

  • We could not confirm who issues septic permits in New Salem, whether RVs or tiny homes are allowed, or what the borough's building permit fees are; ask the borough office before you buy2.
  • A building permit and zoning approval are separate steps here, and a use and occupancy certificate is required under both codes5.
  • The 200-foot sewer connection rule is mandatory once the borough gives notice, with a 30-day permit deadline and a 90-day connection deadline8.
  • County-level references such as property tax describe York County, not the borough alone19.

Sources

  1. Chapter 240 Zoning, Article III Zone Regulations (Borough of New Salem), quoted and re-checked
  2. Chapter 80 Construction Codes, Uniform (Borough of New Salem), quoted and re-checked
  3. Chapter 240 Zoning, Article III Zone Regulations (Borough of New Salem), quoted and re-checked
  4. Chapter 80 Construction Codes, Uniform (Borough of New Salem), quoted and re-checked
  5. Chapter 80 Construction Codes, Uniform (Borough of New Salem), quoted and re-checked
  6. Chapter 240 Zoning, Article III Zone Regulations (Borough of New Salem), quoted and re-checked
  7. Chapter 240 Zoning, Article III Zone Regulations (Borough of New Salem), quoted and re-checked
  8. Chapter 170 Sewers and Sewage Disposal, connection article (Borough of New Salem), quoted and re-checked
  9. 25 Pa. Code § 72.22. Permit issuance (Pennsylvania statewide rule), quoted and re-checked
  10. Chapter 240 Zoning, Article III Zone Regulations (Borough of New Salem), quoted and re-checked
  11. Chapter 240 Zoning, Article III Zone Regulations (Borough of New Salem), quoted and re-checked
  12. Chapter 240 Zoning, Article III Zone Regulations (Borough of New Salem), quoted and re-checked
  13. Borough of New Salem building code official and zoning enforcement officer (ecode360.com)
  14. Chapter 80 Construction Codes, Uniform (Borough of New Salem), quoted and re-checked
  15. York County Planning Commission (ycpc.org)
  16. Act 537 Sewage Facilities (Pennsylvania statewide rule), quoted and re-checked
  17. Apply for a PennDOT Highway Occupancy Permit (Pennsylvania statewide rule), quoted and re-checked
  18. Data Center Development in York County, quoted and re-checked
  19. Effective property tax rate: Bolthole Index county data
  20. Median property tax bill: Bolthole Index county data
  21. PennsylvaniA Floodplain Development Guide (Pennsylvania statewide rule), quoted and re-checked
  22. Apply for a Water Well Drillers License and Rig Permit (Pennsylvania statewide rule), quoted and re-checked

Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Borough of New Salem

Borough of New Salem’s own rules

  • Building permitRequired

    Construction inside New Salem borough

    • Applicant requests permits from both the building code official and zoning enforcement officer
    • UCC exemptions not reviewed
    “at the time of application for a building permit the applicant shall pay an appropriate fee.”
  • Building code adoptedAdopted

    Construction inside New Salem borough

    • Pennsylvania Uniform Construction Code adopted; later UCC updates apply automatically
    • Prior 1993 building permit ordinance repealed for permits issued after effective date
    “the uniform construction code (hereinafter referred to as the "code" or "ucc") contained in 34 pa. code, chapters 401-405, as may be amended from time to time, is hereby adopted and incorporated herein by reference as the municipal building code of the borough of new salem.”
  • InspectionsRequired

    Construction inside New Salem borough

    • Final inspections coordinated with zoning inspections
    “final inspections and occupancy certificates as required under or issued in conjunction with the code shall be conducted and issued with, and at the same time as, final inspections and use and occupancy certificates required by chapter 240, zoning.”
  • Certificate of occupancyRequired

    Buildings inside New Salem borough

    • Use and occupancy certificates required under both UCC and Chapter 240, issued together
    “final inspections and occupancy certificates as required under or issued in conjunction with the code shall be conducted and issued with, and at the same time as, final inspections and use and occupancy certificates required by chapter 240, zoning.”
  • Local zoningPresent

    Land inside New Salem borough

    • Zoning Chapter 240 with zoning map; administered with a zoning hearing board and zoning enforcement officer
    “the borough of new salem is divided into the zones enumerated below and shown on the map entitled”
  • Zoning districtsPublished

    Zones in New Salem borough

    • Four zones: SF, VC, MU, GR
    “sf single-family residential zone vc village center zone mu mixed-use zone gr general residential zone”
  • Minimum lot sizeSpecified

    Single-family residential (SF) zone, inside New Salem borough

    • Depends on public water/sewer availability
    • Other zones (VC, MU, GR) have separate tables; GR single-family detached 6,000 sq ft with public water and sewer

    lot area, public water and sewer: >= 15000 sq ft · lot area, public water or sewer: >= 20000 sq ft · lot area, neither: >= 43560 sq ft

    “all uses 15,000 80 20,000 100 1 acre (43,560 square feet) 150”
  • SetbacksSpecified

    Single-family residential (SF) zone, inside New Salem borough

    • GR zone uses the same 35/10/30 setbacks

    front setback: >= 35 feet · each side setback: >= 10 feet · rear setback: >= 30 feet

    “(1) front setback: 35 feet. (2) each side setback: 10 feet. (3) rear setback: 30 feet.”
  • Lot coverageSpecified

    Single-family residential (SF) zone, inside New Salem borough

    • At least 55% of lot must be open area
    • GR zone allows 75% impervious

    max impervious coverage: <= 45 percent

    “not more than 45% of the lot area may be covered with an impervious surface, e.g., driveways, parking areas, walkways, buildings and structures.”
  • Building heightSpecified

    Single-family residential (SF) zone, inside New Salem borough

    • Accessory buildings: two stories, not over 25 feet
    • Farm buildings exempt
    • GR zone: three stories, not over 35 feet

    principal building height: <= 30 feet (farm buildings exempt)

    “the height limit for a principal building shall be 2 1/2 stories, but not over 30 feet.”
  • Mandatory utility hookupWater and sewer (with conditions)

    Improved property inside New Salem borough adjoining the sewer system

    • Sewer: building within 200 feet of the sewer system must connect; apply for permit within 30 days of borough notice and connect within 90 days
    • Water: SF zone requires public water if capacity is available and extension is feasible

    sewer connection distance: <= 200 feet

    “the owner of any improved property adjoining or adjacent to the sewer system that has a building or buildings of which any part is within 200 feet of the sewer system shall connect such building on the improved property with the sewer system”
  • Agricultural exemptionConditional

    Farm buildings in SF zone, inside New Salem borough

    • Farm buildings on an existing farm are by-right in SF; exemption covers height limits only
    “farm buildings shall be exempted from the aforementioned height requirements.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Borough of New Salem or York County directly.

  • Owner-builder exemption — Owner-builder in New Salem borough
  • Minimum dwelling size — Dwellings in New Salem borough
  • Living in an RV — RV occupancy in New Salem borough
  • Camping on your land — Camping in New Salem borough
  • Tiny homes — Tiny homes in New Salem borough
11 more unanswered
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Driveway access
  • Short-term rentals
  • Permit fees
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Borough of New Salem publishes no rule on the point, not that none exists. York County’s page lists the county offices to call.

← All of York County: county rules, score and offices