Gunter, Texas requires a city building permit before anyone builds a building or installs a fence anywhere in the city1. Gunter also has its own zoning ordinance, so lot size, setbacks and home size depend on the zoning district2. We could not confirm who issues septic permits inside Gunter city limits; ask Grayson County's septic office and the city. Grayson County's no-permit rule for houses covers only unincorporated land3.
At a glance
- Building permit
- Required in Gunter for buildings and fences, issued before construction1
- Zoning
- Yes, the City of Gunter Zoning Ordinance applies inside city limits2
- Building code
- 2021 International Residential Code, as amended4
- Septic
- Authority inside city limits not confirmed; Grayson County runs the septic program in the county5
- Minimum home size
- 1,800 sq ft in SF-1; 1,000 sq ft in Agricultural (excluding garage)67
- Minimum lot size
- 9,000 sq ft in SF-1; 87,120 sq ft in Agricultural89
- Flood development
- Permit required in special flood hazard areas10
Who to call
Planning & zoning
City of Gunter Development Services
Building permit applications, planning and development forms inside Gunter city limits
105 N. 4th Street, Gunter, TX 75058
Septic permits
Grayson County On-Site Sewage Facilities (Designated Representative)
Septic (OSSF) permits in Grayson County as a TCEQ authorized agent; whether this office covers addresses inside Gunter city limits is unconfirmed
Grayson County Courthouse, 100 W. Houston, Ste. G-3, Sherman, Texas 75090
Planning & zoning
Grayson County Development Services Supervisor
Development certificates, driveway and culvert applications, floodplain determinations and platting for unincorporated Grayson County, not for land inside Gunter
Grayson County Courthouse, 100 W. Houston, Ste. 3rd. Floor, Sherman, Texas 75090
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in Gunter means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Gunter, Texas?
Yes. The City of Gunter makes it unlawful to build or erect any building, or to install a fence, anywhere in the city without first applying for a building permit and receiving approval1. Applications go on the city's form with two complete sets of plans and two plat plans, and the permit issues only after plan review is complete and all fees are paid1112.
The city has adopted the 2021 International Residential Code, as amended4. After the permit issues and before a certificate of occupancy, the Building Inspector conducts foundation, plumbing, electrical and framing inspections13.
This differs from the land just outside the city. Grayson County does not issue building permits for single-family houses in unincorporated areas3, but that rule does not follow you inside Gunter's limits.
Who issues building permits in Gunter, and how do you reach them?
Gunter's Development Services department handles development in the city14. Its office is at 105 N. 4th Street, Gunter, TX 75058, with phone 903-433-518514. The city also runs a Development Portal with residential and commercial permit forms14.
Construction permit, inspection, water and tap fees are set by the city council by resolution, so ask Development Services for the current amounts before you budget11. Do not call the county planning counter in Sherman for a permit on a Gunter address: that office serves unincorporated Grayson County15.
Does Gunter have zoning, and what does it mean for lot size, setbacks and home size?
Yes. Gunter has its own zoning ordinance, and the city divides itself into districts216. The rules differ by district.
In the Agricultural district, the minimum lot is 87,120 square feet, the minimum dwelling is 1,000 square feet excluding garage, and setbacks are 35 feet front, 15 feet side and 30 feet rear9717. Maximum building height there is 35 feet18.
In the SF-1 Single-Family district, the minimum lot is 9,000 square feet, the minimum dwelling is 1,800 square feet excluding garage, and setbacks are 30 feet front, 10 feet side and 25 feet rear8619. Lot coverage in SF-1 is capped at 40 percent20.
An accessory dwelling unit in Gunter cannot be rented or sublet as a short-term or long-term rental21.
How do septic permits work in Gunter, Texas?
We could not confirm which office administers septic systems inside Gunter city limits; no city provision we reviewed names one. In Grayson County generally, a septic permit is required for any new or replacement septic system, and the county's septic program acts as an authorized agent of TCEQ225. Texas requires a permit to construct, install, alter, extend or repair an on-site sewage facility statewide23.
If Gunter's public sewer is not available at your lot, call Grayson County's septic office24 and Gunter Development Services14 before you buy, and ask who permits the system at your address. Grayson County requires hookup to a public sewage system for parcels within 100 feet of one unless written approval says otherwise25.
Farmland-type soils here are rarely rated well for conventional drain fields: about 7% of Grayson County soils are rated not limited, so expect a site evaluation and possibly an engineered system26.
Can you live in an RV or tiny home on your land in Gunter?
We could not confirm a Gunter rule for tiny-home occupancy; no code provision we reviewed classifies or regulates it. The city's zoning ordinance and building permit requirement apply to buildings of any type inside city limits12, so call Gunter Development Services before you place a tiny home or RV for living14.
Grayson County's Lake Ray Roberts RV park limit of 14 days per month applies in that county zoning district, not as a Gunter rule27.
Building a home in Gunter: the steps, in order
- Confirm the zoning district for your lot with Gunter Development Services, then check its minimum lot, home size and setbacks1614.
- Ask Development Services and Grayson County's septic office who permits septic at your address if no public sewer reaches the lot24.
- Submit the city's building permit form with two sets of plans and two plat plans12.
- Pay the fees the city sets, which are due before the permit issues11.
- Build to the 2021 International Residential Code, as amended4.
- Schedule the foundation, plumbing, electrical and framing inspections before you seek a certificate of occupancy13.
What stays with Grayson County, and what should you check before buying in Gunter?
Land outside Gunter city limits falls under Grayson County, where there is no county zoning outside the Lake Ray Roberts and North Texas Regional Airport districts28. See the Grayson County page for the unincorporated rules.
Within Gunter, check flood status: development in special flood hazard areas needs a floodplain development permit10. A driveway built with permitted work must not interfere with street or alley drainage or create a public hazard, as the City Manager determines29. A driveway onto a state highway needs a separate TxDOT permit30.
Grayson County's effective property tax rate is 1.3 percent31.
Watch-outs
- Grayson County does not require building permits for single-family houses, but that applies to unincorporated land32; we could not confirm an owner-builder exemption inside Gunter, so ask Development Services before you start14.
- Private wells and off-grid sanitation inside Gunter city limits are unconfirmed; ask Development Services and the county septic office before you buy1424.
- Gunter has an Agricultural zoning district, but we could not confirm a farm-building exemption from the city building permit requirement, so assume the permit applies161.
Sources
- Article 3.02 Administration and Enforcement — City of Gunter, TX (Gunter), quoted and re-checked
- Exhibit 14A Zoning Ordinance — City of Gunter, TX (Gunter), quoted and re-checked
- Grayson County Development Services (2026 county census)
- Article 3.03 Technical and Construction Codes and Standards — City of Gunter, TX (Gunter), quoted and re-checked
- Grayson County TX - OSSF Permitting Requirements (2026 county census)
- Appendix I: District Regulations — City of Gunter Zoning Ordinance (Gunter), quoted and re-checked
- Appendix I: District Regulations — City of Gunter Zoning Ordinance (Gunter), quoted and re-checked
- Appendix I: District Regulations — City of Gunter Zoning Ordinance (Gunter), quoted and re-checked
- Appendix I: District Regulations — City of Gunter Zoning Ordinance (Gunter), quoted and re-checked
- Article 3.05 Flood Damage Prevention — City of Gunter, TX (Gunter), quoted and re-checked
- Article 3.02 Building Permit Submittal Requirements and Fees — City of Gunter, TX (Gunter), quoted and re-checked
- Article 3.02 Building Permit Submittal Requirements and Fees — City of Gunter, TX (Gunter), quoted and re-checked
- Exhibit 14A §38 Building Permits and Certificates of Occupancy — City of Gunter, TX (Gunter), quoted and re-checked
- City of Gunter Development Services (guntertx.gov)
- Grayson County Development Services Supervisor (co.grayson.tx.us)
- Exhibit 14A Zoning Ordinance — City of Gunter, TX (Gunter), quoted and re-checked
- Appendix I: District Regulations — City of Gunter Zoning Ordinance (Gunter), quoted and re-checked
- Appendix I: District Regulations — City of Gunter Zoning Ordinance (Gunter), quoted and re-checked
- Appendix I: District Regulations — City of Gunter Zoning Ordinance (Gunter), quoted and re-checked
- Appendix I: District Regulations — City of Gunter Zoning Ordinance (Gunter), quoted and re-checked
- Exhibit 14A §§15 and 30 — City of Gunter, TX (Gunter), quoted and re-checked
- Development Services | Grayson County Tx., quoted and re-checked
- Getting a Permit for an OSSF - Such as a Septic System (Texas statewide rule), quoted and re-checked
- Grayson County On-Site Sewage Facilities (Designated Representative) (co.grayson.tx.us)
- An Order Entitled On-Site Sewage Facilities, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Lake Ray Roberts Land Use Ordinance, quoted and re-checked
- Development Services | Grayson County Tx., quoted and re-checked
- Article 3.02 Administration and Enforcement — City of Gunter, TX (Gunter), quoted and re-checked
- Section 4: Driveway Permits, Design, and Materials (Texas statewide rule), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Grayson County Development Services, quoted and re-checked
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.