Unincorporated Hardin County, Texas has no zoning ordinance, but the Floodplain Administration requires a Development Residential Permit before any work starts, and the permit fee doubles if you begin first123. A separate permit covers placing a manufactured home4. Septic permits come from the Hardin County Environmental Health Department or TCEQ, depending on the system and jurisdiction5.
At a glance
- Building / development permit
- Development Residential Permit required before work starts; fee $100 for the first 1,000 sq ft plus $25 per additional 100 sq ft, doubled if work starts first643
- Zoning
- None; the county's permit program covers development, floodplain, manufactured homes and subdivisions, not zoning districts1
- Manufactured home placement
- Separate permit required before the home is placed, $100 per home4
- Septic permits
- Required; the county Subdivision Regulations name the Hardin County Environmental Health Department or TCEQ, depending on the system and jurisdiction578
- RV / tiny home / manufactured home living
- Not restricted by zoning, but a manufactured home still needs its own placement permit94
- Culvert permit
- All roadside culverts must be installed by the county; $50 permit fee, plus $400 installation charge for each culvert after the first410
- Owner-builder exemption
- Not stated on the county's site; unconfirmed11
- Driveway onto a state highway
- Needs a TxDOT permit (Form 1058), not a county permit12
Who to call
Building permits
Hardin County Floodplain Administration
Development Residential Permits, manufactured home placement permits, electrical permits, and culvert permits for unincorporated Hardin County; also administers the county's floodplain ordinance.
225 Crocker Street, Kountze, TX 77625
Septic permits
Hardin County Environmental Health Department
OSSF (septic) permitting for property in Hardin County subdivisions, alongside TCEQ; the county's website does not list a direct phone or address for this department, so start with the general county courthouse line.
Contact details are copied from each office’s official page and were checked against it on October 10, 2026.
Off-grid gear
Going off-grid in Hardin County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Hardin County, Texas?
Unincorporated Hardin County, Texas requires a Development Residential Permit before most construction begins, issued by the county's Floodplain Administration64. The county defines development broadly: any man-made change to real estate, including buildings and other structures, mining, dredging, filling, grading, paving, excavation, drilling, or storage of equipment or materials4. The permit fee is $100 for the first 1,000 square feet plus $25 for each additional 100 square feet, though fees can be waived on some non-residential outbuildings depending on use4. Placing a manufactured home on the property needs its own separate permit, at $100 per home, and it's the buyer or homeowner's responsibility to obtain it, not the dealer or transporter4. No work of any kind may start until the permit is issued, the residential permit expires if work does not begin within 6 months, and the fee doubles if you begin before getting a required permit133. The county's page does not say whether this program also applies inside incorporated cities, so ask the Floodplain Administration if your parcel is near city limits14.
Who is the Hardin County building department, and how do you reach them?
Hardin County's development, floodplain, manufactured home, electrical, and culvert permits are all issued through the Floodplain Administration at 225 Crocker Street, Kountze, TX 77625, phone (409) 246-5250, email permits@hardincountytx.gov4. Before running electrical service from Entergy or SHECO to new construction, you need a separate $30 electrical permit from the same office4. If you'll need a driveway culvert on a county road, the county installs the first one at no charge beyond a $50 permit fee, and charges $450 for each additional culvert on the same property4. The county doesn't install culverts on state highways or private roads, so a state-highway driveway routes through TxDOT instead412. Inside a subdivision, a driveway culvert permit is required and the Road and Bridge Department must approve the culvert size and grade10.
Does Hardin County have zoning?
Hardin County has no zoning ordinance; its permit program covers development, floodplain, manufactured homes, electrical service, and culverts, not zoning districts1. Texas gives counties zoning power only in narrow, specifically named situations15. We could not confirm the zoning rules of each city in Hardin County, so ask the city if your parcel lies inside city limits. Because there's no zoning, the county sets no minimum home size, minimum lot size, setback, lot-coverage limit, or building-height limit by ordinance, and doesn't restrict RVs, tiny homes, manufactured homes, or accessory dwellings through zoning9. That doesn't mean there's no process: the Development Residential Permit and manufactured-home placement permit above still apply to most new structures64.
How do septic permits work in Hardin County?
Hardin County's Subdivision Regulations say an on-site sewage facility (OSSF, commonly called septic) is permitted by the Hardin County Environmental Health Department or by TCEQ, and which one applies depends on the system and jurisdiction58. Texas requires a permit and approved plan to construct, install, alter, extend or repair an OSSF, and where no local jurisdiction is authorized the TCEQ regional office is the permitting authority7. Subdivisions that use OSSFs must have an approved OSSF Subdivision Plan under 30 Texas Administrative Code 285.4(c)16. The county's website does not list a direct phone number or address for the Environmental Health Department, so call the county courthouse switchboard to be routed8. A 10-acre exemption can apply only if every condition is met: a TCEQ-licensed site evaluator or engineer signs off, the tract holds a single-family home on at least 10 acres, all system parts sit at least 100 feet from the property line, and effluent stays on the property7.
Can you live in an RV or tiny home on your land in Hardin County?
Because unincorporated Hardin County has no zoning, there's no zoning-based restriction on living in an RV, a tiny home, or a manufactured home on your own land9. That said, if you place a manufactured home on the property, Hardin County's Floodplain Administration requires its own placement permit, at $100 per home, and the buyer or homeowner is responsible for getting it, not the dealer4. Any other structure or development on the land, including a tiny home built or moved in, likely triggers the county's Development Residential Permit and its per-square-foot fee64. Confirm with the Floodplain Administration how they'll treat your specific setup before you buy or move one in4.
Building a home in Hardin County: the steps, in order
- Contact the Hardin County Floodplain Administration (409-246-5250) before you buy, to confirm the flood zone and what the Development Residential Permit will require4.
- Submit the Development Residential Permit application; budget $100 for the first 1,000 square feet plus $25 per additional 100 square feet4.
- If you're placing a manufactured home, apply for the separate $100 manufactured home placement permit before the home arrives4.
- Apply for the $30 electrical permit before Entergy or SHECO will connect service4.
- If you need a roadside culvert for your driveway, apply for the county's culvert permit; the first culvert installs free beyond the $50 permit fee, and in a subdivision Road and Bridge must approve its size and grade410.
- Contact the Hardin County Environmental Health Department for an OSSF (septic) permit if the property isn't on sewer8.
- Before splitting a tract, check whether a plat is needed: Hardin County requires one when an owner divides a tract outside city limits into 4 or more parts, with limited exceptions such as agricultural use and lots over 10 acres17.
- If your driveway will connect to a state highway rather than a county road, apply to TxDOT for a driveway permit on Form 1058 instead of a county culvert permit12.
What to check before you buy land in Hardin County
Confirm the flood zone with the Floodplain Administration before you buy, since permit requests inside a Special Flood Hazard Area must comply with the Hardin County Floodplain Ordinance4. Hardin County's soils are a real constraint for septic: none of the county's soils are rated free of severe limits for a conventional drain field, so budget for an engineered or alternative OSSF system and confirm site evaluation requirements with the Environmental Health Department early188. The county is heavily wooded, at 85.7% forest cover, and gets 60.3 inches of rain a year, both of which affect site clearing and drainage planning1920. If your access road will need a culvert on a county road, budget the $450 charge for anything beyond the first one, or the separate TxDOT process if you're on a state highway412. There's no county zoning to check on a specific parcel, so verify any subdivision plat restrictions directly, since Hardin County's own Subdivision Regulations can set stricter OSSF lot-size rules than the state minimum9.
Watch-outs
- Two official Hardin County pages give different street numbers for the Floodplain Administration's physical address on Crocker Street; call the office first to confirm the exact address before visiting in person4.
- The county's website does not publish a direct phone number or address for the Environmental Health Department that issues septic permits; call the county courthouse switchboard to be routed8.
- Starting work before the Development Residential Permit issues can double the permit fee, and the permit lapses if work does not begin within 6 months313.
- Whether Hardin County has adopted a building code or requires a certificate of occupancy is unconfirmed; the permit application only states the applicant consents to reasonable inspections to verify compliance21.
Sources
- Hardin County - Permits (2026 county census)
- Permits | Hardin County, Texas, quoted and re-checked
- Permits | Hardin County, Texas, quoted and re-checked
- Hardin County Floodplain Administration (hardincountytx.gov)
- Hardin County Subdivision Manual, quoted and re-checked
- Permits | Hardin County, Texas (2026 county census)
- Getting a Permit for an OSSF - Such as a Septic System, quoted and re-checked
- Hardin County Environmental Health Department (hardincountytx.gov)
- Texas law on county zoning and building authority
- Hardin County Subdivision Manual, quoted and re-checked
- Exemptions to Electrician Licensing (2026 county census)
- Section 4: Driveway Permits, Design, and Materials (Texas statewide rule), quoted and re-checked
- Hardin County Development Residential Permit Application, quoted and re-checked
- Permits | Hardin County, Texas, quoted and re-checked
- Local Government Code Chapter 231, County Zoning Authority (Texas statewide rule), quoted and re-checked
- Hardin County Subdivision Manual, quoted and re-checked
- Hardin County Subdivision Manual, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Wooded share of land: Bolthole Index county data
- Annual precipitation: Bolthole Index county data
- Hardin County Development Residential Permit Application, quoted and re-checked
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.