Bolthole Index

Hemphill County, Texas

Building permits, zoning and septic rules in Hemphill County, Texas

38Index Score / 100
#231 of 254 in Texas

Unincorporated Hemphill County, Texas does not require a general county building permit for a site-built home and has no county zoning12. Inside Canadian, the city requires building permits for work covered by its building code and administers municipal zoning34. Septic permits remain with TCEQ Region 1 throughout Hemphill County, and well registration or permitting remains with the Hemphill County Underground Water Conservation District56.

At a glance

Building permit
No general county building permit in unincorporated areas; Canadian requires city building permits for work covered by its building code13
Zoning
No county zoning in unincorporated areas; Canadian has municipal zoning24
Septic permit
Generally required through TCEQ Region 1 unless a state exception applies75
RV living
Private-land occupancy rules were not confirmed; county park rules do not answer the question8
Tiny homes
No county zoning restriction in unincorporated areas; Canadian zoning applies inside the city24
Well permit
Register an exempt well or obtain the applicable district permit before drilling6
Subdivision plat
State law generally requires plats outside municipalities, with a limited agricultural-use exception910

Who to call

Septic permits

TCEQ Region 1 Office (Amarillo)

On-site sewage facility (OSSF/septic) permits for Hemphill County; TCEQ's own authorized-agent lookup shows Hemphill County has no city or county authorized agent, so this TCEQ regional office is the direct permitting authority

806-353-9251

5809 S. Western St. STE 260, Amarillo, TX 79110

Also useful

Hemphill County Judge's Office

General county contact for road-crossing permits, questions about the county's RV and camping areas, and any county business without its own dedicated department

806-323-6521

400 Main Street, Suite 200, Canadian, TX 79014

Contact details are copied from each office’s official page and were checked against it on October 9, 2026.

Off-grid gear

Going off-grid in Hemphill County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Hemphill County, Texas?

Unincorporated Hemphill County does not require a general county building permit for an ordinary site-built home1. Industrialized and modular housing is different: state installation or alteration requirements can apply outside a municipality11. A qualifying purchaser installing an industrialized house or residential modular component for personal use may obtain a residential installation permit instead of registering as an industrialized builder; that state permit does not waive inspections or mandatory codes12. Inside Canadian, the city requires a building permit before work covered by its building code begins; the cited code provision covers buildings other than single-family residential structures, so ask the city what code and permit process applies to a house3. Septic permits still go through TCEQ Region 1, and wells still go through the Hemphill County Underground Water Conservation District56.

Who issues building, septic and road permits in Hemphill County?

Hemphill County has no general building-permit or inspection department for ordinary site-built homes in unincorporated areas1. Canadian issues city building permits for work governed by its building code and publishes a city permit-fee schedule; its separate street-cut repair fees apply to utility or licensed-plumber cuts within the city, not rural construction313. TCEQ Region 1 issues septic permits throughout Hemphill County because there is no local OSSF agent514. The County Judge's Office handles underground crossings, road cuts and waterline crossings on county roads1516. A driveway connecting to a state highway requires TxDOT approval17. We could not confirm a county-road driveway or culvert rule, so ask the County Judge's Office about access before construction16.

Does Hemphill County have zoning?

Unincorporated Hemphill County has no county zoning, so the county does not set zoning districts, minimum dwelling size, minimum lot size, setbacks, lot coverage or building height there2. That answer does not erase septic, well, subdivision, floodplain, deed-restriction or access requirements. Inside Canadian, municipal zoning applies, and the city uses a variance process4. Canadian also requires building permits for work covered by its adopted building code, while septic permits remain with TCEQ Region 1 and wells remain with the Hemphill County Underground Water Conservation District356. For land outside another incorporated municipality, confirm city-limit and extraterritorial-jurisdiction status before assuming the unincorporated-county answer controls9.

How do septic permits work in Hemphill County?

A septic permit and approved plan are generally required to construct, alter, repair, extend or operate an on-site sewage facility in Hemphill County7. TCEQ Region 1 is the permitting authority because Hemphill County has no local OSSF agent514. The state exemption for a qualifying large tract applies only when every condition is met, including a licensed site evaluation, a single-family dwelling as the only dwelling on the tract, no nuisance or groundwater pollution, on-property effluent disposal and the required property-line separation18. Grandfathered systems and specified emergency repairs have separate limited exceptions18. Only 32.9% of county soils are free of severe limitations for a conventional drain field, so obtain the site evaluation before fixing the house location19.

Can you live in an RV or tiny home on your land in Hemphill County?

Unincorporated Hemphill County has no county zoning restriction on tiny-home or manufactured-home occupancy, but that does not answer sanitation, floodplain, deed-restriction or utility requirements2. We could not confirm a rule that answers long-term RV occupancy on unincorporated private land; ask the County Judge's Office before using an RV as a residence16. The county's published RV limits cover public campgrounds, not private property8. Inside Canadian, city zoning applies to the parcel, while septic permits still go through TCEQ Region 1 and wells still go through the water district456. An RV, tiny home or manufactured home using an OSSF generally needs septic approval unless a state exception applies7.

Building a home in Hemphill County: the steps, in order

  1. Confirm whether the parcel is inside Canadian or another municipality; unincorporated Hemphill County has no general county building permit or county zoning, while Canadian has city zoning and building-permit rules1243.
  2. Confirm the tract was legally divided. State law generally requires a subdivision plat outside municipalities, while a qualifying agricultural, farm, ranch, wildlife-management or timber-production division may be exempt910.
  3. Ask TCEQ Region 1 for the septic permit process and arrange the site evaluation714.
  4. Register an exempt well or obtain the applicable district permit before drilling6.
  5. Obtain TxDOT approval for state-highway access or county approval for an underground crossing, road cut or waterline crossing1715.
  6. If the project uses industrialized or modular housing, confirm the separate state requirements before installation11.

What should you check before buying land in Hemphill County?

Start with septic suitability: only 32.9% of Hemphill County soils are free of severe limitations for a conventional drain field19. Confirm that a divided tract has any required plat approval and tax certificate; an agricultural-use plat exemption is limited and does not remove septic, floodplain, water-district or municipal rules2010. Plan water before closing because every new exempt or non-exempt well must be registered or permitted through the Hemphill County Underground Water Conservation District before drilling6. The county averages 23.3 inches of precipitation a year and experiences severe drought in 32.3% of years2122. The effective property-tax rate is about 1.2%, with a median annual bill near $2,5022324.

Watch-outs

  • Do not use the septic form posted on Hemphill County's website: it is labeled for Hill County; Hemphill County septic permits go to TCEQ Region 1514.
  • Canadian's building permits and zoning apply inside the city; septic permits remain with TCEQ Region 1 and wells remain with the Hemphill County Underground Water Conservation District3456.
  • The county's public-campground rules do not answer whether an RV may be occupied long term on private land; ask the County Judge's Office816.

Sources

  1. Hemphill County, Texas - official county site (2026 county census)
  2. Texas law on county zoning and building authority
  3. Division 2: Building Code — City of Canadian, TX, quoted and re-checked
  4. City of Canadian Notice of Public Hearing, quoted and re-checked
  5. TCEQ OSSF Authorized Agent search (OARS) (2026 county census)
  6. Hemphill County Underground Water Conservation District 2022 Management Plan, quoted and re-checked
  7. Getting a Permit for an OSSF - Such as a Septic System, quoted and re-checked
  8. Parks and Recreation, quoted and re-checked
  9. Texas Local Government Code Chapter 232, County Regulation of Subdivisions, quoted and re-checked
  10. Texas Local Government Code Chapter 232, County Regulation of Subdivisions, quoted and re-checked
  11. Justification for Adoption of Administrative Rules — Industrialized Housing and Buildings, quoted and re-checked
  12. Justification for Adoption of Administrative Rules — Industrialized Housing and Buildings, quoted and re-checked
  13. City of Canadian Ordinance No. 772, quoted and re-checked
  14. TCEQ Region 1 Office (Amarillo) (tceq.texas.gov)
  15. Hemphill County Forms, quoted and re-checked
  16. Hemphill County Judge's Office (co.hemphill.tx.us)
  17. Section 4: Driveway Permits, Design, and Materials (Texas statewide rule), quoted and re-checked
  18. Getting a Permit for an OSSF - Such as a Septic System, quoted and re-checked
  19. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  20. Hemphill County Clerk, quoted and re-checked
  21. Annual precipitation: Bolthole Index county data
  22. Share of years in severe drought: Bolthole Index county data
  23. Effective property tax rate: Bolthole Index county data
  24. Median property tax bill: Bolthole Index county data

Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Hemphill County requires no county building permit for a home.

RuleHemphill CountyWheeler CountyRoberts CountyLipscomb CountyGray CountyOchiltree CountyCollingsworth County
Building permitNot requiredNot requiredNot requiredNot requiredNot requiredNot requiredNot required
County zoningNoNoNoNoNoNoNo
Septic permitsTCEQ Region 1TX Commission on Env. QualityTCEQ Region 1TCEQTCEQ Region 1TCEQTCEQ

County locator

Hemphill County in Texas

38
County map
Hemphill County highlighted among the Texas counties · colored by Index score

How Hemphill County scores

Seclusion86100% ev.
Self-Sufficiency1296% ev.
Admin Boringness8790% ev.
Durability25100% ev.
Property Autonomy71100% ev.
Carry Cost8096% ev.

Evidence strength: 97%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$181kTypical home
1.2%Property tax
$1,181Land / acre
23.3"Annual rain
32.3% of yrsSevere drought
36.7 / yr (+25.5)Mid-century 100°F days
29 daysMid-century dry spell
1.6" (+2.8%)Mid-century 1-day rain
1.35×Wildfire change factor
100%Forward climate coverage
$3,042Home insurance / yr
-2.9% / yrInsurance growth
0%Nonrenewal rate
single ZIP shrunk to state medianInsurance basis
93,099People within 2 hr
3,327Radius comparison (15 mi)
3.5People / sq mi
0.1%Federal land
83.5%Land at 15% slope or less
32.9%Soils rated "not limited" for septic (strict USDA rating)
187,956 acWorkable land screen
0.8%Wooded land
1.6 tonsBiomass / forest ac
58.7°FAvg temp

Scout Hemphill County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Hemphill County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Hemphill County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Canadian

Answers from the rulebook for Hemphill County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Hemphill County rules

  • Local zoningVaries (with conditions)

    Aggregate conclusion for local zoning within Hemphill County; incorporated municipalities may administer their own zoning rules, while this claim does not attribute each municipal ordinance to the county.

    • The official source confirms zoning regulation within the City of Canadian; applicability depends on whether property is within Canadian or another local jurisdiction.
    • The source concerns a zoning variance and does not establish countywide zoning in unincorporated Hemphill County.
    “The zoning variance would apply to the following described property. Section 77, Block 42, H & TC. The address is: 1 Main Street, Canadian, Texas 79014 Hemphill County, Texas.”
  • Zoning districts · by state lawNo county rule

    Unincorporated Hemphill County: no county rule sets this, because Hemphill County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing co.hemphill.tx.us.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Minimum dwelling size · by state lawNo county rule

    Unincorporated Hemphill County: no county rule sets this, because Hemphill County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing co.hemphill.tx.us.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Minimum lot size · by state lawNo county rule

    Unincorporated Hemphill County: no county rule sets this, because Hemphill County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing co.hemphill.tx.us.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Setbacks · by state lawNo county rule

    Unincorporated Hemphill County: no county rule sets this, because Hemphill County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing co.hemphill.tx.us.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Lot coverage · by state lawNo county rule

    Unincorporated Hemphill County: no county rule sets this, because Hemphill County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing co.hemphill.tx.us.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Building height · by state lawNo county rule

    Unincorporated Hemphill County: no county rule sets this, because Hemphill County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing co.hemphill.tx.us.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Living in an RVLimited

    RV occupancy at Hemphill County Recreation Park and the county-operated camping/RV area at Lake Marvin

    • The Recreation Park has 26 RV slots with water, electricity, and a sewage dump.
    • The Recreation Park charges $20 per night and limits stays to 5 nights.
    • Recreation Park sites are first come, first served with no reservations.
    • Lake Marvin has a few camping and RV areas with water and electricity only.
    • Lake Marvin charges $20 per night and limits stays to 5 nights.

    maximum stay: 5 nights · nightly fee: 20 USD · Recreation Park RV slots: 26 slots

    “There are 26 RV slots available with water, electricity and a sewage dump on site. The cost is $20 per night with a maximum stay of 5 nights. There are no reservations, it is simply a first come, first serve basis. The second area is 12 miles out of town located at Lake Marvin. This site has a few camping and RV areas, but only has water and electricity available. The cost is $20 per night with a maximum stay of 5 nights.”
  • Camping on your landLimited

    Temporary camping at Hemphill County Recreation Park and the county-operated camping/RV area at Lake Marvin

    • Hemphill County identifies two camping areas.
    • The Recreation Park and Lake Marvin both impose a maximum stay of 5 nights.
    • The fee is $20 per night at both areas.
    • Recreation Park is first come, first served with no reservations.
    • Lake Marvin provides water and electricity but no sewage dump is stated.

    maximum stay: 5 nights · nightly fee: 20 USD

    “Hemphill County has 2 camping areas available. The main area is the Hemphill County Recreation Park. This park is located on North 6th Street across from the Rodeo Grounds. There are 26 RV slots available with water, electricity and a sewage dump on site. The cost is $20 per night with a maximum stay of 5 nights. There are no reservations, it is simply a first come, first serve basis. The second area is 12 miles out of town located at Lake Marvin. This site has a few camping and RV areas, but only has water and electricity available. The cost is $20 per night with a maximum stay of 5 nights.”
  • Tiny homes · by state lawNo county rule

    Unincorporated Hemphill County: no county rule sets this, because Hemphill County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing co.hemphill.tx.us.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Manufactured homes · by state lawNo county rule

    Unincorporated Hemphill County: no county rule sets this, because Hemphill County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing co.hemphill.tx.us.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Accessory dwellings · by state lawNo county rule

    Unincorporated Hemphill County: no county rule sets this, because Hemphill County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing co.hemphill.tx.us.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Well permitLimited

    New exempt and non-exempt groundwater wells constructed within the boundaries of the Hemphill County Underground Water Conservation District, whose boundaries are coterminous with Hemphill County.

    • The District requires each new exempt or non-exempt well within its boundaries to be registered or permitted under District rules.
    • Domestic, livestock, rig-supply, monitoring, and Texas Water Code §36.121 wells covered by the exempt-well subchapter must be registered.
    • Exempt wells do not require a production permit but remain subject to District registration and production limitations.
    • Existing and new domestic and livestock wells are limited to beneficial use without waste or no more than 50,000 gallons per day (35 gallons per minute), whichever is less.
    • An exempt well loses its exemption if its nature changes so it no longer qualifies; the owner must notify the District in writing within 30 days of changed circumstances.
    • A non-exempt well requires the applicable District permit under the District rules.

    domestic or livestock exempt-well production limit: <= 50000 gallons per day (or beneficial use without waste, whichever is less) · domestic or livestock exempt-well flow limit: <= 35 gallons per minute (alternative expression of the 50,000-gallon-per-day limit) · changed-circumstances notice: <= 30 days (after facts that may cause loss of exemption)

    “Each year, the District will require all new exempt or non-exempt wells that are constructed within the boundaries of the District to be registered or permitted with the District in accordance with the District Rules.”
    One more reviewed finding on this topic
    • Limited — Water wells within the jurisdiction of the Hemphill County Underground Water Conservation District, whose jurisdiction encompasses all of Hemphill County
      “Yes, all wells are to be registered or permitted through the District and all new wells must be registered or permitted prior to drilling.”
  • Agricultural exemptionAvailable

    Exemption from county subdivision plat requirements for qualifying land divisions outside municipal limits in Hemphill County.

    • The land must be used primarily for agricultural use as defined by Section 1-d, Article VIII, Texas Constitution, or for farm, ranch, wildlife-management, or timber-production use within Section 1-d-1, Article VIII, Texas Constitution.
    • The owner must divide the tract into two or more parts without laying out a part of the tract described by Local Government Code Section 232.001(a)(3).
    • If the tract ceases to be used primarily for the qualifying use, the platting requirements apply.
    • The exemption concerns subdivision platting; it does not eliminate other applicable requirements such as septic, floodplain, water-district, or municipal/ETJ rules.

    qualifying land use: primarily agricultural, farm, ranch, wildlife management, or timber production · minimum division: two or more parts

    “the land is to be used primarily for agricultural use, [...] or for farm, ranch, wildlife management, or timber production use”
    One more reviewed finding on this topic
    • Available (with conditions) — Division of a tract into two or more parts outside the limits of a municipality where the land will be used primarily for qualifying agricultural, farm, ranch, wildlife-management, or timber-production purposes.
      “A county may not require the owner of a tract of land located outside the limits of a municipality who divides the tract into two or more parts to have a plat of the subdivision prepared if: (1) the owner does not lay out a part of the tract described by Section 232.001(a)(3); and (2) the land is to be used primarily for agricultural use, as defined by Section 1-d, Article VIII, Texas Constitution, or for farm, ranch, wildlife management, or timber production use within the meaning of Section 1-d-1, Article VIII, Texas Constitution.”
  • Subdividing landRegulated (with conditions)

    Subdivision plats presented for recording in Hemphill County.

    • The Hemphill County Clerk states that plats are recorded after Commissioners’ Court approval and must have a tax certificate.
    • The page does not state the substantive county platting thresholds, standards, or any agricultural exception.
    “Plats (After approval from Commissioners’ Court/Must have Tax Certificate)”
    2 more reviewed findings on this topic
    • Regulated (with conditions) — Subdivision of land outside the limits of a municipality in Hemphill County.
      “Sec. 232.001. PLAT REQUIRED. (a) The owner of a tract of land located outside the limits of a municipality must have a plat of the subdivision prepared if the owner divides the tract into two or more parts to lay out: (1) a subdivision of the tract, including an addition; (2) lots; or (3) streets, alleys, squares, parks, or other parts of the tract intended by the owner of the tract to be dedicated to public use.”
    • Limited — Subdivision plat requirements administered for land in Hemphill County outside incorporated municipality limits.
      “The owner of a tract of land located outside the limits of a municipality must have a plat of the subdivision prepared”
  • Permit processPartial

    Road-crossing applications and permits administered by Hemphill County.

    • The official page identifies permit categories but does not provide the full application steps, review standards, approval timeline, or fees.
    “ROAD CROSSING APPLICATIONS / PERMITS UNDERGROUND CROSSING ROAD CUTTING WATERLINE CROSSING”
  • County-wide zoningAbsent

    Texas counties generally cannot zone unincorporated land, and Hemphill County has no zoning or planning department listed on its official site.

    Hemphill County, Texas - official county site ↗Scouted from the county site, not yet independently re-checked

Texas rules that apply here

  • Building permitLimited

    Industrialized housing and permanent industrialized buildings installed or altered in Hemphill County, including unincorporated areas.

    • Alteration permits are required for portable industrialized-building alterations.
    • Alteration permits are required for alterations during installation outside a municipality.
    • Post-installation alterations are outside the Texas Department of Licensing and Regulation's jurisdiction.
    • Alteration permits are not required for alterations during installation inside a municipality.
    • An installation or alteration permit may not be issued for a structure taller than 75 feet.
    • The rule concerns industrialized housing and buildings; it does not apply to mobile homes or HUD-code manufactured homes, site-built or non-modular construction, and other listed exemptions.

    maximum structure height for installation or alteration permit: <= 75 feet (An installation permit or alteration permit shall not be issued above 75 feet.)

    “(B) Alteration permits are required for alterations of industrialized housing or permanent industrialized buildings during installation outside the jurisdiction of a municipality. Alterations of industrialized housing or permanent industrialized buildings after installation do not fall under the jurisdiction of the department. (C) Alteration permits are not required for alterations of industrialized housing or permanent industrialized buildings during installation inside the jurisdiction of a municipality.”
    One more reviewed finding on this topic
    • Limited — Industrialized housing or buildings installed in Texas, including purchasers or lessees acquiring a unit for their own or their company’s use.
      “A person who is a retailer of industrialized housing or buildings, or who is responsible for the assembly, connection, and on-site construction and erection of an industrialized house or building for persons other than themselves, must be registered as an industrialized builder. Subcontractors do not require the registration unless required by other applicable state laws. For example, electricians, HVAC contractors, and plumbers must be licensed in accordance with the applicable state law. If you are purchasing or leasing an industrialized house or building for your own use, or your company's use, you may file for an installation permit in lieu of registering as an industrialized builder.”
  • Owner-builder exemptionAvailable (with conditions)

    A person purchasing an industrialized house or residential modular component for personal use who takes responsibility for some or all installation-related construction in Hemphill County.

    • The purchaser must be using the industrialized house or residential modular component for the person's own use.
    • If purchased from an industrialized builder, the purchaser may be responsible for some aspect of installation construction; if purchased from a manufacturer, the purchaser must be responsible for all installation construction.
    • The residential installation permit is filed in lieu of registering as an industrialized builder.
    • A separate application is required for each building.
    • The application must identify all construction to be completed by the permit holder, including any site work affecting code compliance.
    • The permit must be posted at the installation site.
    • The residential installation permit fee is $75 for each building containing industrialized housing or modular components.
    • This is an exemption from industrialized-builder registration, not an exemption from applicable installation inspections or mandatory building codes.

    residential or commercial installation permit fee: per 75 USD per building

    “A person who purchases an industrialized house or residential modular component from an industrialized builder for the person's own use and who is responsible for some aspect of the construction related to the installation of the house may file for a residential installation permit in lieu of registering as an industrialized builder.”
    2 more reviewed findings on this topic
    • Conditional — An owner performing electrical, plumbing, or air-conditioning and refrigeration work on the owner's own residence or homestead in Texas.
      “A person who perform electrical work on a dwelling that they own and reside in is not required by the state to be licensed as electricians.”
    • Conditional — Electrical work on a dwelling owned and occupied by the property owner in Texas.
      “A person who perform electrical work on a dwelling that they own and reside in is not required by the state to be licensed”
  • Building code adoptedPartial

    Industrialized housing and buildings, modules, and modular components governed by the Texas Industrialized Housing and Buildings program.

    • The mandatory state code adoption applies to industrialized housing and buildings, modules, and modular components, not all construction statewide.
    • The effective date is July 1, 2024.
    • The International Existing Building Code applies to alterations of portable industrialized buildings.
    • Manufacturers already certified for Texas must have design-package documents reviewed and approved to the new editions with an approval date on or after July 1, 2024, unless the manufacturer elected to transition before the effective date under Department rule 70.70(a)(5)(B).
    • Construction begun on or after July 1, 2024 must comply with the new code editions and approved design packages.
    • Construction begun before July 1, 2024, or before a manufacturer's effective transition date, must meet the stated completion, inspection, and labeling deadline to remain eligible for a Texas decal.

    effective date: 2024-07-01 · International Building Code: 2021 Edition (including appendices C, F, and K) · International Residential Code: 2021 Edition (including appendices AG, AH, AK, AP, AQ, and AT) · International Fuel Gas Code: 2021 Edition · International Mechanical Code: 2021 Edition · International Plumbing Code: 2021 Edition · International Energy Conservation Code: 2015 Edition · National Electrical Code: 2020 Edition · International Existing Building Code: 2021 Edition (for alterations of portable industrialized buildings)

    “July 1, 2024, all industrialized housing and buildings, modules, and modular components shall comply with the following codes, as amended in §70.101 of the IHB Rules:”
    One more reviewed finding on this topic
    • Partial — Industrialized housing and buildings, modules, and modular components built for Texas under the Industrialized Housing and Buildings program.
      “Effective July 1, 2024, all industrialized housing and buildings, modules, and modular components shall comply with the following codes, as amended in §70.101 of the IHB Rules:”
  • Who permits septicMixed (with conditions)

    OSSF permitting, inspection, and administration throughout Texas.

    • TCEQ administers the program in areas where no local jurisdiction has been authorized.
    • A local governmental entity may administer the program only after an order, ordinance, or resolution is approved by TCEQ.
    • The authorized agent administers the program within its approved area of jurisdiction.
    • Local programs may adopt requirements more stringent than state minimums.
    “The authorized agent is responsible for the proper implementation of Texas Health and Safety Code, Chapter 366, 30 TAC Chapter 285, including reviewing OSSF permit applications, conducting inspections, investigating complaints, and more.”
    One more reviewed finding on this topic
    • Mixed — On-site sewage facilities, including septic systems, throughout Texas
      “TCEQ is not often the OSSF permitting authority. [...] The TCEQ regional office will be the permitting authority in locations where a local jurisdiction has not been authorized.”
  • Septic permitLimited

    Qualifying OSSFs in Texas, including Hemphill County, that fall within the state-recognized 10-acre, grandfathered, or emergency-repair exceptions.

    • The 10-acre exemption requires compliance with all other requirements, including planning, construction, and installation standards of 30 TAC 285.
    • The property must receive a site evaluation conducted by a TCEQ-licensed Site Evaluator or Professional Engineer.
    • The system must serve a single-family dwelling on a tract of land that is 10 acres or larger.
    • The OSSF must not cause a nuisance or pollute groundwater.
    • All parts of the OSSF must be at least 100 feet from the property line.
    • Effluent must be disposed of on the property.
    • The single-family dwelling must be the only dwelling on the tract.
    • Grandfathered status requires installation before a local program had an authorized program or before September 1, 1989, whichever is earlier; the system must not be creating a nuisance, must not be in need of repair, and must not have had a significant increase in use or otherwise been altered.
    • Emergency repairs must be reported to the permitting authority in writing within 72 hours after repairs have begun.

    minimum qualifying tract size: >= 10 acres · minimum setback for all OSSF parts from property line: >= 100 feet · emergency-repair reporting deadline: <= 72 hours (after repairs have begun)

    “An OSSF may be exempt from permitting if it complies with all other requirements, including planning, construction, and installation standards of 30 TAC 285 AND meets the “10 acre rule”: the property receives a site evaluation conducted by a TCEQ licensed Site Evaluator or a Professional Engineer (PE), serves a single family dwelling on a tract of land that is 10 acres or larger, is not causing a nuisance or polluting groundwater, all parts of the OSSF are at least 100 feet from the property line, the effluent is disposed of on the property, AND the single family dwelling is the only dwelling located on the tract of land. A permit is also not required for emergency repairs (replacing tank lids, inlet and outlet devices, repairing risers and riser caps, repairing or replacing disinfection devices, repairing damaged drip irrigation tubing, repair of solid lines, and ETC.), but they must be reported to the permitting authority in writing within 72 hours after repairs have begun.”
    4 more reviewed findings on this topic
    • Required — Construction, installation, alteration, extension, or repair of an on-site sewage facility, including septic systems, in Texas, including Hemphill County.
      “A permit is required to construct, install, alter, extend, or repair an OSSF.”
    • Required — Construction, installation, alteration, extension, repair, and operation of an OSSF, including septic systems and holding tanks, in Texas, including Hemphill County unless a valid exception applies.
      “Permits are required for on-site sewage facilities (OSSFs) including septic systems and holding tanks. This page offers guidance on selecting a system and installer. A permit and approved plan are required to construct, alter, repair, extend, and operate an OSSF.”
    • Required — Construction, installation, alteration, extension, or repair of an OSSF in Texas
      “A permit is required to construct, install, alter, extend, or repair an OSSF. [...] An OSSF may be exempt from permitting if it complies with all other requirements, including planning, construction, and installation standards of 30 TAC 285 AND meets the “10 acre rule”:”
    • Required — Construction, installation, alteration, extension, repair, and operation of OSSFs in Texas, subject to stated exemptions and local requirements.
      “A permit and approved plan are required to construct, alter, repair, extend, and operate an OSSF.”
  • Septic inspectionLimited

    OSSF installation and, where applicable, maintenance inspections in Texas

    • Authorized agents or their designated representatives inspect system installation.
    • Some permitting authorities impose more stringent requirements.
    • Maintenance-provider inspection and reporting requirements apply to systems and circumstances governed by 30 TAC §285.91(4).
    • Electronic monitoring may reduce reporting to every six months where the stated monitoring conditions apply.

    reduced maintenance reporting interval with qualifying electronic monitoring: 6 months (only where the system uses the specified electronic monitoring, automatic notification, and disinfection monitoring)

    “Many times, the AA has a "designated representative" (DR) to assist them with their responsibilities, which include reviewing plans for constructing, altering, extending or repairing each OSSF; issuing permits; and inspecting system installation. [...] If the system uses an electronic monitor, automatic radio or telephone to notify the maintenance provider of system or component failure and to monitor the amount of disinfection in the system, reporting may be reduced to every six months.”
    One more reviewed finding on this topic
    • Limited — OSSFs using secondary treatment or drip irrigation in Texas.
      “A system using secondary treatment or drip irrigation must be inspected by a valid maintenance company once every four months, or be maintained by the single family homeowner, where allowed.”
  • Off-grid sanitationLimited

    Off-grid wastewater sanitation through an OSSF in Texas.

    • An OSSF generally requires a permit and approved plan before construction, installation, alteration, extension, repair, or operation.
    • A qualifying single-family dwelling on a tract of at least 10 acres may use the 10-acre permitting exemption only if every stated site-evaluation, setback, nuisance, groundwater, on-site disposal, and single-dwelling condition is met.
    • Local permitting authorities may impose requirements more stringent than state minimums.
    • Emergency repairs are exempt from permitting only for the listed repair types and must be reported in writing within 72 hours after repairs begin.

    10-acre exemption tract size: >= 10 acres (all TCEQ conditions must be satisfied) · 10-acre exemption OSSF setback: >= 100 feet from property line (all parts of the OSSF)

    “An OSSF may be exempt from permitting if it complies with all other requirements, including planning, construction, and installation standards of 30 TAC 285 AND meets the “10 acre rule”:”
    2 more reviewed findings on this topic
    • Limited — Use of an on-site sewage facility instead of a public sewer connection in Hemphill County, Texas
      “all parts of the OSSF are at least 100 feet from the property line,”
    • Limited — Composting toilets used as on-site sewage facility treatment systems in Texas.
      “Composting toilets will be approved by the executive director provided the system has been tested and certified under NSF International Standard 41 (1999) or under any other standards approved by the executive director.”
  • Driveway accessRequired

    New or modified access driveways connecting property to a Texas state highway right of way.

    • A local public agency may receive access driveway permitting authority for state highways, but TxDOT approval remains required for drainage impacts on the state highway system before local approval.
    • No access driveway is permitted within a flared or widened right-of-way section at an intersection of a state highway with another highway, road, or street.
    • All entrances and exits, including radii, must be confined within the permittee's property frontage.
    • One-way 45-to-90-degree driveways are permitted for connections to one-way frontage roads or lane-divided highways; otherwise the driveway angle must be 75 to 90 degrees.
    • ADAAG and Texas Accessibility Standards apply.

    private residential driveway maximum width: <= 24 feet (Except as increased by permissible radii.) · driveway-to-pavement radius: >= 15 feet

    “A driveway must be constructed in accordance with a fully executed driveway permit”
  • county zoning authorityLimited

    Texas counties adopting zoning regulations for specified unincorporated or otherwise specially defined areas.

    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    • Other Chapter 231 subchapters address special areas including the Amistad Recreation Area in Val Verde County, military zones, certain lakes, the El Paso Mission Trail Historical Area, Lake Somerville, and Falcon Lake in Zapata County.
    • The cited statute was enacted effective September 1, 1987; the Falcon Lake subchapter was added effective June 15, 2007, and amended effective September 1, 2009.

    Padre Island distance from publicly owned park or recreational development: <= 2 miles (Area must be outside a municipality and in Cameron or Willacy County.) · Padre Island distance from beach, wharf, or bathhouse: <= 2 miles (The beach, wharf, or bathhouse must be used by at least 500 persons annually.)

    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
    One more reviewed finding on this topic
    • Limited — County zoning authority over unincorporated land in Texas, where a specific statutory grant applies.
      “As you suggest, a county has very limited and specific zoning authority, and none that may be used to regulate construction or operation of the proposed facility.”
  • county building authorityLimited

    Texas counties adopting and enforcing fire-code building permits for specified buildings in unincorporated areas and applying residential building-code standards in certain counties.

    • Under Section 233.061, the county must have a population over 250,000 or be adjacent to a county with a population over 250,000.
    • Under Section 233.062, the fire code applies only to commercial establishments, public buildings, and multifamily residential dwellings consisting of four or more units constructed in an unincorporated area.
    • The fire code does not apply to an industrial facility having a fire brigade that conforms to Occupational Health and Safety Administration requirements.
    • A covered applicant must submit a plan and a commissioners-court-set application fee; the county must issue or deny the permit within 30 days, and failure to act within 30 days approves the construction for purposes of the subchapter.
    • The fire code must conform to the International Fire Code or Uniform Fire Code as those codes existed on May 1, 2005, or establish protective measures exceeding those standards; later editions may be adopted.
    • Residential standards under Section 233.152 apply only if the county adopts a resolution or order and the county is within 50 miles of an international border or has a population over 100.
    • Those residential standards apply only to new single-family-house or duplex construction beginning after September 1, 2009; manufactured or modular structures governed by Occupations Code Chapters 1201 or 1202 are excluded from the definition of new residential construction.
    • A municipality's building code controls in its extraterritorial jurisdiction, and Section 233.152 does not authorize county prior approval of new residential construction or county zoning regulations.
    • Fire-code inspection and permit fees may be charged under a fee schedule based on building type, limited to amounts necessary to administer and enforce the subchapter; inspection fees must be reasonable and reflect approximate inspection costs.

    county population threshold for fire-code authority: > 250000 persons (A county adjacent to a county over 250,000 also qualifies.) · multifamily residential dwelling threshold: >= 4 units (The fire code applies only to covered buildings constructed in an unincorporated area.) · residential-code border distance: <= 50 miles (Alternative qualification is county population over 100.) · application decision period: 30 days (If the commissioners court does not issue or deny the permit within 30 days after receiving the application and fee, construction is approved for purposes of the subchapter.) · residential standards effective construction date: > 2009-09-01 (Applies only to new residential construction that begins after September 1, 2009.)

    “The commissioners court of a county with a population of over 250,000 or a county adjacent to a county with a population of over 250,000 may adopt a fire code and rules necessary to administer and enforce the fire code. [...] The fire code applies only to the following buildings constructed in an unincorporated area of the county: (1) a commercial establishment; (2) a public building; and (3) a multifamily residential dwelling consisting of four or more units.”
    One more reviewed finding on this topic
    • Limited — County fire-code adoption and building-permit authority for specified buildings in unincorporated areas of qualifying Texas counties, including multifamily residential dwellings of four or more units.
      “The commissioners court of a county with a population of over 250,000 or a county adjacent to a county with a population of over 250,000 may adopt a fire code and rules necessary to administer and enforce the fire code.”

Inside cities and towns in Hemphill County

Municipal rules found while researching the county. They apply inside that city or town, not to unincorporated land.

  • Building code adoptedPartial

    Buildings and structures within the City of Canadian other than single-family residential structures.

    • The adopted code is the 2018 edition of the International Building Code.
    • A copy of the IBC must be kept in the city secretary’s office and made available for public inspection during normal business hours.
    • The code is amended to insert City of Canadian, Texas; a fee schedule is attached for Section 108.2; City of Canadian, Hemphill County, Texas and specified dates are inserted into Section 1612.3; and October 21, 2019 is inserted into Section 3410.2.
    • A building permit is required for work that must conform to the city building code, including construction, enlargement, alteration, improvement, removal, relocation, or demolition; work may not begin before the permit is obtained from city hall.
    • The city code provides a permit fee schedule through section 3.01.001.
    • This claim is partial because the cited IBC provision expressly excludes single-family residential structures; it does not establish the applicable residential code.

    code edition: 2018 International Building Code (Applies to buildings and structures other than single-family residential structures) · building permit: required (For work that must conform to the city building code) · permit fee schedule: section 3.01.001

    “From and after the effective date of this section, the International Building Code (“IBC”), 2018 edition, published by the International Code Council, regulating the erection, construction, enlargement, alteration, repair, moving, removal, demolition, conversion, remodeling, occupancy, equipment, use, height, area and maintenance of all buildings or structures, other than single-family residential structures, is hereby adopted by reference as though set out completely in detail.”
  • Local zoningPresent (with conditions)

    Land and structures within the corporate limits of the City of Canadian, Hemphill County, Texas.

    • The cited notice concerns a zoning-variance application before the City Council of Canadian.
    • The cited property was subject to allowable-coverage limits under Article 14, Section 06, Subsection 284, Paragraph C of the City zoning ordinance.
    • The notice states that the public hearing would occur on March 17, 2025; it does not establish the zoning status of areas outside the City of Canadian.
    “CITY OF CANADIAN NOTICE OF PUBLIC HEARING [...] The purpose of the public hearing is to receive public comment on an Application for a Zoning Variance.”
    3 more reviewed findings on this topic
    • Present (with conditions) — Zoning regulation administered by the City of Canadian within the City of Canadian, Hemphill County, Texas.
      “The purpose of the public hearing is to receive public comment on an Application for a Zoning Variance.”
    • Present (with conditions) — Zoning within the City of Canadian, Texas, including a zoning ordinance and variance process.
      “The purpose of the public hearing is to receive public comment on an Application for a Zoning Variance. [...] The applicant wishes to add 20,000 square feet to an existing warehouse, which exceeds the allowable coverage of a property under the terms of Article 14, Section 06, Subsection 284, Paragraph C of the Zoning Ordinance.”
    • Present (with conditions) — Zoning within the incorporated City of Canadian, Hemphill County, Texas.
      “The purpose of the public hearing is to receive public comment on an Application for a Zoning Variance. [...] The applicant wishes to add 20,000 square feet to an existing warehouse, which exceeds the allowable coverage of a property under the terms of Article 14, Section 06, Subsection 284, Paragraph C of the Zoning Ordinance.”
  • Permit feesPublished (with conditions)

    Street-cut repair permit fees administered by the City of Canadian within the city limits.

    • The fee schedule concerns street cuts made by other utilities or licensed plumbers in the city.
    • Ordinance No. 772 was passed April 21, 2025 and became effective upon posting April 28, 2025.

    Class A street-cut repair fee: 16.5 USD per square foot (Good-condition street classification.) · Class B street-cut repair fee: 13.5 USD per square foot (Fair-condition street classification.) · Class C street-cut repair fee: 10.5 USD per square foot (Poor-condition street classification.)

    “The City of Canadian passed the following ordinance on April 21, 2025 and it will become effective upon this posting, April 28, 2025 [...] (1) Class A (good condition): $ 11.00 $ 16.50 per square foot of repairs. (2) Class B (fair condition): $ 9.00 $ 13.50 per square foot of repairs. (3) Class C (poor condition): $ 7.00 $ 10.50 per square foot of repairs.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Inspections — General building inspections for construction in unincorporated Hemphill County.
  • Certificate of occupancy — Certificates of occupancy for buildings in unincorporated Hemphill County.
  • Mandatory utility hookup — Requirement or availability of public water or sewer connections for property in Hemphill County.
  • Building in a floodplain — Development in mapped or regulated floodplain areas of Hemphill County.
  • Short-term rentals — Short-term rental use in unincorporated Hemphill County.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Hemphill County, Texas

Is Hemphill County a good place to live off-grid or homestead?

Hemphill County scores 38/100 on the Bolthole Index, a marginal county profile. Its strengths: low administrative friction for a quiet rural property and deep seclusion — about 3,327 people within 15 miles. Watch-outs: thin water margin (23.3″/yr rainfall) and elevated mid-century heat, water, rain, or wildfire exposure.

Do you need a building permit in Hemphill County, Texas?

Hemphill County does not require a county building permit for a home in unincorporated areas, and it has no county-wide zoning. Onsite septic is permitted by TCEQ Region 1 (Amarillo) OSSF program. Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

Can you live in an RV or tiny home on your land in Hemphill County?

Living in an RV on your own land in Hemphill County is limited to specific cases: RV occupancy at Hemphill County Recreation Park and the county-operated camping/RV area at Lake Marvin The Recreation Park has 26 RV slots with water, electricity, and a sewage dump. The Recreation Park charges $20 per night and limits stays to 5 nights. A tiny home is allowed. Confirm with the county before relying on it.

How much does land cost in Hemphill County, Texas?

Land in Hemphill County runs about $1,181 per acre, based on the latest county data.

What is the water situation in Hemphill County?

Hemphill County gets about 23.3" of rain a year, with severe drought in roughly 32.3% of years.

How remote is Hemphill County?

A typical private-land location has about 3,327 people within 15 miles and 381,189 within 100 miles. These radius catchments are the published fallback where road routing is unavailable.

How Hemphill compares in Texas

Compare side-by-side →See all 254 Texas counties ranked →