Bolthole Index

Maverick County, Texas

Zoning, building permits and septic rules in Eagle Pass, Texas

The City of Eagle Pass, Texas has its own zoning ordinance1 and requires construction inside city limits to follow its adopted building codes2. Building permits and certificates of occupancy go through the city Planning Department3. Septic permits are a separate question: the Maverick County authorized agent is listed for unincorporated county only4, and we could not confirm who permits septic inside city limits.

At a glance

Zoning
Yes: the city has a zoning ordinance with named districts15
Building permit
Required inside city limits; applied for with the city Planning Department63
Building codes
City adopted the 2015 International codes and the 2014 NEC2
Certificate of occupancy
Required; the city form lists a $40 fee67
Septic permits
Texas requires a permit; who issues it inside city limits is unconfirmed84
RV or tiny home living
Not confirmed; ask the Planning Department3
Subdivisions
Regulated; final plats need Planning and Zoning Commission and City Council approval9

Who to call

Planning & zoning

City of Eagle Pass Planning Department

City zoning, certificates of occupancy and building permit applications inside Eagle Pass city limits.

(830) 773-7781

3295 Bob Rogers Drive, Eagle Pass, Texas 78852

Online permits →

Septic permits

Maverick County OSSF (Septic) Authorized Agent

Septic (OSSF) permits for unincorporated Maverick County, as TCEQ's authorized agent; TCEQ lists its area served as unincorporated county.

(830) 776-8027

500 Quarry St, Eagle Pass, TX 78852

Contact details are copied from each office’s official page and were checked against it on October 24, 2026.

Off-grid gear

Going off-grid in Eagle Pass means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does Eagle Pass, Texas have zoning, and what does it mean for lot size and setbacks?

Yes. The City of Eagle Pass zones land inside city limits through the zoning districts and regulations in Appendix A of its Code of Ordinances1. The published ordinance establishes districts such as R-5 Garden Home and R-6 Third One-Family5. Which district a parcel sits in decides what you can build, so confirm it with the Planning Department before you buy.

Dimensional rules differ by district. In the R-5 Garden Home district, a single-family lot needs at least 4,500 square feet and an average width of at least 45 feet10. R-5 requires a front yard of at least 10 feet and a rear yard of at least 10 feet, with 10 feet between buildings11. Buildings in R-5 may not exceed two and one-half stories or 35 feet12. We have not confirmed the numbers for other districts, a minimum home size or lot coverage limits, so ask the Planning Department for the district your parcel is in.

Do you need a building permit in Eagle Pass, and who issues it?

Inside Eagle Pass city limits, construction follows the city's Code of Ordinances and the codes the city has adopted: the 2015 International Building, Residential, Fire, Mechanical, Plumbing, Existing Building and Energy Conservation Codes, the 2014 National Electrical Code and the 2012 Texas Accessibility Standards2. The city's Planning Department takes building permit applications3, and the city lists an online permit portal for submittals.

A certificate of occupancy is also required before a building or premises is used or occupied, except for agricultural use of vacant land, and is applied for together with the building permit6. The city's application lists inspection categories including zoning requirements, gas, sewer, final electrical, mechanical, plumbing and building, and off-street parking13. The certificate of occupancy fee on the city form is $407. We could not confirm an owner-builder exemption inside city limits, so assume a permit applies and ask the Planning Department.

How do septic permits work inside Eagle Pass?

Texas requires a permit and approved plan to construct, install, alter, extend or repair a septic system (OSSF)8. The Maverick County septic authorized agent is listed by TCEQ with its area served as unincorporated county4. We could not confirm who issues septic permits for a lot inside Eagle Pass city limits, or whether a new home there must connect to city water and sewer. Ask the city Planning Department first, then the county septic agent.

The state's 10-acre exemption for a single-family dwelling8 is unlikely to matter on a city lot, because it requires a tract of at least 10 acres. For soils, about 20% of Maverick County soils rate as not limited for a conventional drain field14. That is a strict rating, so expect a site evaluation and possibly an engineered system if septic is allowed on your lot.

Can you live in an RV or tiny home in Eagle Pass?

We could not confirm an Eagle Pass rule on living in an RV, camping on private land, or occupying a tiny home, manufactured home or accessory dwelling inside city limits. The zoning ordinance excerpts we reviewed do not state an RV-occupancy rule. Because the city zones by district, the answer depends on the district and on the city's Certificate of Occupancy requirement6. Call the Planning Department at (830) 773-77813 with the parcel address and ask in writing before you move anything onto the lot.

Building a home in Eagle Pass: the steps, in order

  1. Ask the city Planning Department which zoning district the parcel is in and what that district allows3.
  2. Check lot size, setbacks and height for that district; for R-5 the figures are in the zoning section above10.
  3. If the land would be divided, note that final plats need Planning and Zoning Commission and City Council approval9.
  4. Settle water and sewer or septic: confirm with the city and the county septic agent who issues septic permits for the address4.
  5. Apply for the building permit and the certificate of occupancy together6, building to the city's adopted codes2.
  6. Pass the city's inspections, then collect the certificate of occupancy13.

What stays with Maverick County, and what to check before you buy in Eagle Pass?

City rules apply only inside Eagle Pass city limits. For land outside the city, use the Maverick County page, where unincorporated rules differ: the county's septic authorized agent serves unincorporated county4. Septic permitting for the address, any private well, and floodplain questions are not answered by the city's zoning rules, so confirm each with the office that handles it. The city publishes a floodplain development permit application, but we could not confirm when it is required, so ask the Planning Department about the parcel's flood zone.

For budgeting, Maverick County's effective property tax rate is 1.4%15 and its median property tax bill is $2,112 a year16. Annual precipitation averages 19.7 inches17.

Watch-outs

  • We could not confirm who issues septic permits inside Eagle Pass city limits; ask the city Planning Department and the county septic agent before you rely on a septic system4.
  • The only dimensional rules we confirmed are for the R-5 Garden Home district, so a parcel in another zoning district may have different lot size, setback and height limits10.
  • The city requires a certificate of occupancy before premises are used or occupied, except agricultural use of vacant land6.
  • We could not confirm rules on RVs, tiny homes, accessory dwellings, short-term rentals or driveway access inside city limits; ask the Planning Department3.

Sources

  1. Ordinance No. 2020-01 (Eagle Pass), quoted and re-checked
  2. Certificate of Occupancy Permit Application (Eagle Pass), quoted and re-checked
  3. City of Eagle Pass Planning Department (eaglepasstx.gov)
  4. Maverick County OSSF (Septic) Authorized Agent (www6.tceq.texas.gov)
  5. Ordinance No. 2020-01 (Eagle Pass), quoted and re-checked
  6. Certificate of Occupancy Permit Application (Eagle Pass), quoted and re-checked
  7. Certificate of Occupancy Permit Application (Eagle Pass), quoted and re-checked
  8. Getting a Permit for an OSSF - Such as a Septic System, quoted and re-checked
  9. Ordinance No. 2023-10 (Eagle Pass), quoted and re-checked
  10. mcclibraryfunctions.azurewebsites.us (Eagle Pass), quoted and re-checked
  11. mcclibraryfunctions.azurewebsites.us (Eagle Pass), quoted and re-checked
  12. mcclibraryfunctions.azurewebsites.us (Eagle Pass), quoted and re-checked
  13. Certificate of Occupancy Permit Application (Eagle Pass), quoted and re-checked
  14. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  15. Effective property tax rate: Bolthole Index county data
  16. Median property tax bill: Bolthole Index county data
  17. Annual precipitation: Bolthole Index county data

Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Eagle Pass

Eagle Pass’s own rules

  • Building code adoptedAdopted (with conditions)

    Building construction inside Eagle Pass city limits.

    • The city document lists the 2015 IBC, 2015 IRC, 2015 IFC, 2014 NEC, 2015 IMC, 2015 IPC, 2015 IEBC, 2015 IECC, and 2012 Texas Accessibility Standards.
    “All building construction is required to comply with provisions of the City of Eagle Pass Code of Ordinances and the 2015 International Building Code (IBC), the 2015 International Residential Code for One and Two Family Dwellings (IRC), the 2015 International Fire Code (IFC), the 2014 National Electrical Code (NEC), the 2015 International Mechanical Code (IMC), the 2015 International Plumbing Code (IPC), the 2015 International Existing Building Code (IEBC), the 2015 International Energy Conservation Code (IECC), and the 2012 Texas Accessibility Standards.”
  • InspectionsRequired

    Structures and sites seeking a certificate of occupancy inside Eagle Pass city limits.

    • The listed inspection categories are zoning district requirements, gas installation, sewer, final electrical/mechanical/plumbing/building, and off-street parking.
    “A Certificate of Occupancy/Certificate of Compliance will be issued once the structure and site have been inspected and approved for compliance with all applicable building codes and city ordinances.”
  • Certificate of occupancyRequired

    Premises used, occupied, or changed in use inside Eagle Pass city limits.

    • Vacant land used for agricultural uses is excepted. Certificates are applied for with the building-permit application and issued after conforming construction or structural alterations are complete.
    “until a certificate of occupancy and compliance shall have been issued”
  • Local zoningPresent (with conditions)

    Land inside Eagle Pass city limits.

    • Land use remains subject to the applicable zoning district and ordinance provisions.
    “WHEREAS, Appendix A, Section 7 of the City of Eagle Pass, Texas (“City”) Code of Ordinances contains the zoning districts and regulations governing the City of Eagle Pass, Texas;”
  • Zoning districtsPublished (with conditions)

    Zoning districts inside Eagle Pass city limits.

    • The opened ordinance establishes at least R-5 Garden Home and R-6 Third One-Family dwelling districts.
    “WHEREAS, Appendix A, Section 7 of the City of Eagle Pass, Texas (“City”) Code of Ordinances contains the zoning districts and regulations governing the City of Eagle Pass, Texas;”
  • Subdividing landRegulated (with conditions)

    Construction of new subdivisions inside Eagle Pass city limits.

    • Final plats require Planning and Zoning Commission and City Council approval.
    “Plat requirements are specified in Chapter 23 of our local code of ordinances.”
  • Permit feesPublished (with conditions)

    Certificate-of-occupancy permit applications inside Eagle Pass city limits.

    • The form separately lists a $25 business-permit charge.

    certificate of occupancy: 40 USD (Listed on the city CO permit application)

    “CERTIFICATE OF OCCUPANCY $40.00 O CHECK CHECK NO.: BUSINESS PERMIT $25.00”

Rules another office applies inside Eagle Pass

Eagle Pass does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Minimum lot sizeSpecified

    R-5 Garden Home district inside Eagle Pass city limits.

    • Applies to lots with a single-family dwelling; minimum average width is 45 feet.

    minimum lot area: >= 4500 square feet (Single-family dwelling lot in R-5 Garden Home district) · minimum average lot width: >= 45 feet (Single-family dwelling lot in R-5 Garden Home district)

    “four thousand and five hundred (4,500) square feet”
  • SetbacksSpecified

    R-5 Garden Home district inside Eagle Pass city limits.

    • Only one side-yard setback is required; buildings must have 10-foot minimum separation.

    front yard: >= 10 feet (R-5) · rear yard: >= 10 feet (R-5) · building separation: >= 10 feet (R-5)

    “The minimum depth of such front yard shall be ten (10) feet. No structures will be permitted in the front yard setback area.”
  • Building heightSpecified

    R-5 Garden Home district inside Eagle Pass city limits.

    maximum building height: <= 35 feet (Maximum is also two and one-half stories in R-5)

    “No building shall exceed two and one-half (2½) stories or thirty-five (35) feet in height.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Eagle Pass or Maverick County directly.

  • Owner-builder exemption — Owner-built residential construction inside Eagle Pass city limits.
  • Minimum dwelling size — Single-family residential districts inside Eagle Pass city limits.
  • Lot coverage — Residential zoning districts inside Eagle Pass city limits.
  • Living in an RV — Residential RV occupancy on private land inside Eagle Pass city limits.
  • Camping on your land — Temporary camping on private land inside Eagle Pass city limits.
13 more unanswered
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Eagle Pass publishes no rule on the point, not that none exists. Maverick County’s page lists the county offices to call.

← All of Maverick County: county rules, score and offices