Cameron, Texas requires a building permit before new construction or renovations inside city limits, issued through the city's code enforcement office at city hall1. The city has its own zoning, with a zoning map and rezoning and special use permit forms2. Septic permits anywhere in Milam County come from the Milam County Health Department, not the city3.
At a glance
- Building permit
- Required inside Cameron city limits for new construction and renovations1
- Permit fee
- New residential: $0.075 per sq ft plus inspection fees, $50 minimum4
- Inspections
- $50 per inspection for building, electrical, mechanical and plumbing5
- Zoning
- Yes, the city has a zoning map and zoning change forms2
- Certificate of occupancy
- Required after construction and inspections are complete6
- Septic permits
- Milam County Health Department (countywide)3
- Private wells
- Registered with Post Oak Savannah Groundwater Conservation District7
Who to call
Building permits
City of Cameron Code Enforcement / Building Permits
Building permits, inspections, certificates of occupancy, zoning change applications and contractor licenses inside Cameron city limits
100 S. Houston Ave, Cameron, TX 76520
Septic permits
Milam County Health Department
On-site sewage facility (septic) permits and inspections for Milam County
908 N Crockett Suite B, Cameron TX, 76520
Contact details are copied from each office’s official page and were checked against it on October 14, 2026.
Off-grid gear
Going off-grid in Cameron means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Cameron, Texas have zoning?
Yes. The City of Cameron publishes a zoning map and takes applications for zoning changes, re-zoning and special use permits through its code enforcement office2. Inside city limits, then, a lot's district decides what can be built or parked on it, unlike unincorporated Milam County.
We could not confirm the district rules themselves, so we cannot tell you minimum lot sizes, setbacks, or whether an RV, tiny home or manufactured home is allowed on a given lot. Download the city's zoning map from the code enforcement page and ask the code enforcement officer which district a specific address sits in before you buy89.
Do you need a building permit in Cameron, and who issues it?
Yes. The City of Cameron asks that a building permit application be completed before any new construction or renovation begins inside city limits9. The city's code enforcement office issues the permit1.
The city's posted fee for new residential construction is $0.075 per square foot plus inspection fees, with a minimum permit of $504. Each building, electrical, mechanical and plumbing inspection is $50, multiplied by the number of inspections the codes require for a single-family structure5. The fee page is dated April 2021, so confirm current amounts with the office.
Building contractors working in the city pay a $50 annual license fee and supply a $1,000 bond or proof of liability insurance9.
How do you reach the Cameron building permit office?
Building permits are handled by Cameron's Code Enforcement / Building Permits office at City Hall, 100 S. Houston Ave, Cameron, TX 76520, phone 254-697-6646, email camcode@camerontexas.net9. The office lists its hours as Monday to Friday, 8:00 am to 9:30 am and 1:00 pm to 2:30 pm9.
Submit the building permit application by email or deliver it to city hall10. When construction and inspections are finished, apply for the certificate of occupancy at city hall6.
How do septic permits work in Cameron, Texas?
Septic permits are a county matter. The Milam County Health Department is the permitting authority for on-site sewage facilities in Milam County11, and a designated representative of that department permits and inspects every system built, altered, extended or repaired in the county3.
The county application lists $410 for a conventional or low-pressure dosing system, and an Authorization to Construct must be issued before work begins12. A re-inspection costs $100 each time13.
We could not confirm whether the city of Cameron adds its own septic rules inside city limits, or which lots are on city sewer. Ask the City of Cameron water and wastewater department and the county health office at 254-697-703911.
Can you live in an RV or tiny home in Cameron?
We could not confirm Cameron's rules for living in an RV, camping on a lot, or placing a tiny home or manufactured home, because those depend on the city's zoning district and the district text was not available to us. Ask the code enforcement office at 254-697-6646 before you move anything onto a lot9.
Milam County's RV park and tiny house regulations apply only outside municipal city limits, so they do not govern a lot inside Cameron14.
Building a home in Cameron: the steps, in order
- Ask the code enforcement office which zoning district the lot is in and what that district allows9.
- Complete the city building permit application and email or deliver it to city hall10.
- Pay the permit fee and schedule the required inspections4.
- Get septic approval from the Milam County Health Department if the lot is not on city sewer11.
- Finish construction and inspections, then apply for the certificate of occupancy6.
What stays with Milam County, and what to check before you buy in Cameron
Septic permits stay with the Milam County Health Department3. Private wells anywhere in Milam County fall inside the Post Oak Savannah Groundwater Conservation District; a household well must be registered and needs a Certificate to Drill and a $100 deposit before drilling7.
County soils matter for septic: about 14.5% of Milam County soils rate as not limited for a conventional drain field, so expect a site evaluation and possibly an engineered system on a lot without sewer15.
For land outside Cameron city limits the county's rules apply instead; see the Milam County page.
Watch-outs
- We could not confirm the text of Cameron's zoning ordinance, so setbacks, lot sizes and RV or tiny home rules for a specific lot must come from the code enforcement office8.
- The city's posted permit fee schedule is dated April 2021, so confirm current fees before budgeting4.
- Milam County's development permit and RV park rules apply to unincorporated land, not to lots inside Cameron city limits16.
Sources
- City of Cameron Code Enforcement / Building Permits (Cameron), quoted and re-checked
- City of Cameron Code Enforcement / Building Permits (Cameron), quoted and re-checked
- Milam County Health Department OSSF Application, quoted and re-checked
- City of Cameron Code Enforcement / Building Permits (Cameron), quoted and re-checked
- City of Cameron Code Enforcement / Building Permits (Cameron), quoted and re-checked
- City of Cameron Code Enforcement / Building Permits (Cameron), quoted and re-checked
- Drilling & Wells FAQs, quoted and re-checked
- City of Cameron Code Enforcement / Building Permits (Cameron), quoted and re-checked
- City of Cameron Code Enforcement / Building Permits (camerontexas.net)
- City of Cameron Code Enforcement / Building Permits (Cameron), quoted and re-checked
- Milam County Health Department (milamcounty.net)
- Milam County Health Department OSSF Application, quoted and re-checked
- Milam County Health Department OSSF Application, quoted and re-checked
- Milam County RV Park Regulations, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Development Permit Application - Approved 25-05-12, quoted and re-checked
Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.