Unincorporated Travis County, Texas requires a Basic Development Permit for residential and commercial construction outside city limits1. New houses and duplexes face limited residential-code requirements and professional-builder inspection rules23. Travis County lacks zoning authority over unincorporated land; city zoning can apply inside municipalities45. Travis County handles septic permits where county jurisdiction applies; Austin Water and LCRA handle their respective areas678.
At a glance
- Building permit
- A county Basic Development Permit is required for construction outside city limits19
- Residential code
- New houses and duplexes must follow the applicable limited IRC standard2
- Building inspections
- Professional builders or remodelers submit 3 inspection reports; manufactured homes are excluded from the new-home inspection rule310
- Zoning
- No county zoning in unincorporated areas; city zoning varies inside municipalities45
- Septic permit
- Separate septic application; Travis County, Austin Water or LCRA handles review depending on the parcel11678
- RV or tiny-home living
- No county zoning rule in unincorporated areas, but development, septic and floodplain requirements can still apply411112
- Owner-builder
- Some state trade-license exemptions apply, but a blanket county construction exemption is unconfirmed13
- Driveway access
- A county permit is generally required for access to a maintained county road; TxDOT handles state highways14
Who to call
Building permits
Travis County Development Services
Issues the development permit required to build a new single-family house, duplex or manufactured home outside Travis County's city limits, and administers floodplain, driveway and subdivision permits for the same unincorporated and ETJ areas
700 Lavaca, Suite 540, Austin, TX 78701
Septic permits
Travis County Development Services - On-Site Sewage Facility (OSSF) Program
Reviews plans, issues permits, and schedules and performs inspections for on-site sewage facilities (septic systems) in unincorporated Travis County, as TCEQ's authorized agent
700 Lavaca, Suite 540, Austin, TX 78701
Contact details are copied from each office’s official page and were checked against it on October 12, 2026.
Off-grid gear
Going off-grid in Travis County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Travis County, Texas?
Travis County requires a Basic Development Permit for residential and commercial construction outside incorporated city limits1. The permit is a county development permit rather than a full municipal-style building permit, and property in a city's extraterritorial jurisdiction may also need municipal approval9. New single-family houses and duplexes in unincorporated Travis County must follow the applicable International Residential Code standard, while qualifying manufactured and modular homes are outside that county residential-code definition2. Professional builders of new single-family homes must arrange at least 3 third-party inspections: foundation before concrete, framing and mechanical before wall covering, and completion; manufactured homes do not have that inspection requirement10. Professional builders or remodelers of one- and two-family dwellings must submit 3 inspection reports on completion, covering foundation, framing/mechanical and final inspections3. The county has a published fee schedule, but applicants should use the current schedule for their location because fee categories differ inside and outside Austin's extraterritorial jurisdiction15.
Who issues building permits in Travis County, and how do you apply?
Travis County Development Services administers the county's building-related development permit and can be reached at (512) 854-421516. The office is at 700 Lavaca, Suite 540, Austin, Texas, and its permit mailing address is P.O. Box 1748, Attn: Permits, Austin, TX 7870116. Basic Development Permit applications are submitted online through MyPermitNow, where applicants upload the relevant site plans, checklists, engineering materials, project data and construction-cost estimate17. Development Services returns review comments through the same system, and separate driveway or septic applications may be necessary17. Austin issues building permits for work within its zoning jurisdiction, subject to specified exemptions18. Elgin, a city mainly in Bastrop County that reaches into Travis County, also issues its own building permits inside city limits19. Septic approval remains separate: Austin Water handles septic systems in its full jurisdiction and applicable annexed areas; Travis County remains the septic authority where county jurisdiction applies206. For an Elgin septic project, ask Travis County Development Services to confirm the authorized permitting jurisdiction before applying2116.
Does Travis County have zoning?
Travis County does not have zoning authority over unincorporated land, so the county cannot use zoning to control property use, building height or size, or residential density there4. Austin administers its own zoning districts and site-development rules inside city limits22. Elgin, which reaches into Travis County from Bastrop County, also administers city zoning23. Septic jurisdiction is separate: Austin Water handles septic systems in its applicable jurisdiction, while Travis County handles septic systems where county jurisdiction applies206. No county zoning does not mean a rural parcel is unrestricted: the Basic Development Permit, residential-code standard, subdivision rules and floodplain requirements can still govern a project122412. Before relying on that answer, confirm whether the parcel is within city limits or a city's extraterritorial jurisdiction, because municipal rules may change the permit path95.
How do septic permits work in Travis County?
Travis County requires a separate septic application where an on-site wastewater system will be used11. Travis County's nonresidential checklist requires septic construction approval before the development permit, with a possible written placement-responsibility exception; for a home, ask Development Services to confirm the approval sequence2516. Required septic inspections depend on the system and project26. Travis County is the authorized agent for unincorporated areas and municipalities covered by interlocal agreements, but Austin regulates systems in its applicable jurisdiction and on properties fronting Lake Austin or its tributaries6277. LCRA regulates the Lake Travis area, but county materials describe conflicting boundaries; ask the responsible authority to confirm the parcel before applying8. Travis County's septic inspection team is reached at 512-854-4438, and inspection requests must enter MyGovernmentOnline before 2 p.m. on the previous working day28. Only about 4.2% of Travis County soils are rated “not limited” for a conventional drain field, so a site evaluation may materially affect the system design and budget29. State law has a narrow exemption for a qualifying single-family system on at least 10 acres, subject to every listed condition and any stricter local rule30.
Can you live in an RV or tiny home in Travis County?
Unincorporated Travis County has no county zoning rule that sets RV occupancy, tiny-home occupancy, a zoning-based minimum home size or residential setbacks31. That answer does not waive the Basic Development Permit for construction outside city limits or the county's limited residential-code rules for a new house or duplex12. A tiny home treated as industrialized housing follows the applicable state industrialized-housing code and permitting framework rather than escaping regulation because it is small3233. Any occupied setup still needs a lawful wastewater solution; Travis County requires a separate septic application where an on-site system is used, while Austin or LCRA may be the responsible authority in their areas1178. Ask Travis County Development Services to confirm the wastewater approval sequence for the proposed home16.
What are the steps to build a home in Travis County?
- Confirm whether the parcel is outside corporate city limits and whether a municipal extraterritorial jurisdiction adds another approval layer9.
- Check the plat, subdivision status and floodplain constraints before fixing the house, driveway and septic locations2412.
- Apply online for the Basic Development Permit and upload the applicable plans, checklists, engineering documents, project data and cost estimate17.
- Confirm whether Travis County, Austin Water or LCRA handles septic, and ask Development Services which septic approvals must precede the home's development permit67816.
- Obtain a Travis County driveway permit for access to a maintained county road, or work with TxDOT for a state-highway connection14.
- For professional-builder or remodeler work covered by the residential standards, submit the foundation, framing/mechanical and final inspection reports on completion3.
What should you check before buying land in Travis County?
Start with jurisdiction: city limits, a municipal extraterritorial jurisdiction, Lake Austin frontage and the Lake Travis area can change which office reviews zoning, development or septic work5978. Check floodplain mapping and the recorded plat before choosing a building site, because floodplain approval and subdivision rules operate even where county zoning does not1224. Confirm legal road access and budget for a driveway permit if the connection is to a maintained county road14. For subdivision projects, document water and wastewater availability for every lot and phase; public-water proposals need supply documentation, while septic proposals use the county's OSSF planning route34. Private-well permitting can depend on the applicable groundwater conservation district, so identify the district before assuming a well is exempt35. Finally, account for difficult septic soils: only about 4.2% of Travis County soils are rated “not limited” for a conventional drain field, so a site evaluation may identify a need for an engineered system29.
Watch-outs
- County zoning is absent only in unincorporated Travis County; incorporated cities may impose their own zoning rules45.
- The county's Lake Travis materials give different septic-jurisdiction distances, so confirm the parcel boundary with Travis County Development Services and LCRA before applying8.
- A professional builder's residential project requires at least 3 construction inspections, while manufactured homes are excluded from that inspection rule10.
- We could not confirm a blanket county owner-builder exemption; state trade-license exemptions are limited and do not erase local permit or inspection requirements13.
Sources
- Development Services, quoted and re-checked
- Chapter 480. Residential Construction Standards, quoted and re-checked
- Travis County Code: Chapter 480, quoted and re-checked
- traviscountytx.gov, quoted and re-checked
- traviscountytx.gov, quoted and re-checked
- On-Site Sewage Facility (Septic System) Permit, quoted and re-checked
- austintexas.gov, quoted and re-checked
- Permit Enforcement, quoted and re-checked
- Environmental Review of Development Proposals, quoted and re-checked
- Single Family Home / Manufactured Home Permit, quoted and re-checked
- On-Site Sewage Facility (Septic System) Permit, quoted and re-checked
- Chapter 464. Regulations for Floodplain Management, quoted and re-checked
- Exemptions to Electrician Licensing (Texas statewide rule), quoted and re-checked
- Driveway Permit, quoted and re-checked
- FY2026 Development Related Fees Schedule, quoted and re-checked
- Travis County Development Services (traviscountytx.gov)
- MyPermitNow Application Process, quoted and re-checked
- Austin: Homeowner's Permit (Travis County), quoted and re-checked
- Elgin: Building Division (Travis County), quoted and re-checked
- Austin: On-Site Sewage Facilities (Travis County), quoted and re-checked
- Elgin: Getting a Permit for an OSSF - Such as a Septic System (Travis County), quoted and re-checked
- Austin: Zoning Resources & Site Regulations (Travis County), quoted and re-checked
- Elgin: Planning & Development (Travis County), quoted and re-checked
- Chapter 482. Travis County Development Regulations, quoted and re-checked
- traviscountytx.gov, quoted and re-checked
- On-Site Sewage Facility (Septic System) Permit, quoted and re-checked
- Permit Enforcement, quoted and re-checked
- Travis County Development Services - On-Site Sewage Facility (OSSF) Program (traviscountytx.gov)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Getting a Permit for an OSSF - Such as a Septic System (Texas statewide rule), quoted and re-checked
- Texas law on county zoning and building authority
- Industrialized Housing and Buildings – Adoption of New Code Editions (Texas statewide rule), quoted and re-checked
- tdlr.texas.gov (Texas statewide rule), quoted and re-checked
- Groundwater Availability Regulation, quoted and re-checked
- Water Code Chapter 36 — Groundwater Conservation Districts (Texas statewide rule), quoted and re-checked
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.