Naples City, in Uintah County, Utah, runs its own zoning under Title 17 and adopts the International Residential Code for houses12. The city lists a basic building permit and names a building official at City Hall3. Septic permits for Uintah County come from TriCounty Health Department, not the city4. We could not confirm the city's own septic, RV or fee rules.
At a glance
- Zoning
- Yes. The city is divided into zones under Title 1715
- Building permit
- City lists a basic building permit; apply at City Hall3
- Building code
- Most recently adopted International Residential Code for houses2
- Septic
- Approved septic is an allowed utility option; TriCounty Health permits septic in Uintah County64
- Minimum house size (RA-1)
- 750 square feet7
- Minimum lot (RA-1)
- 20,000 square feet8
- Driveway access
- City lists a driveway access permit3
Who to call
Building permits
City of Naples City Hall (building official and permits)
Building permits, conditional use permits, re-zone applications, driveway access permits and subdivision applications inside Naples City
1420 E. 2850 S. Naples, UT 84078
Septic permits
TriCounty Health Department — Vernal Office
Septic (onsite wastewater) applications, construction permits and inspections in Uintah County
133 South 500 East, Vernal, UT, 84078
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in Naples means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Naples, Utah have zoning, and what does it mean for lots and RVs?
Yes. Naples City divides the land inside city limits into zones, and land uses in each zone are limited by Title 171. The city publishes agricultural, residential-agricultural, residential, commercial, industrial and airport districts5.
District matters. In the RA-1 Residential-Agricultural Zone, a one-family dwelling must have at least 750 square feet of floor area7, permitted residential and agricultural uses need a 20,000 square foot lot8, a house and attached garage or carport may cover no more than 40 percent of the lot9, and structures top out at 34 feet10. Other districts have their own numbers.
We could not confirm Naples City's rules for living in an RV, tiny-home occupancy or temporary camping on private land. Ask the city's building official before parking a camper on a lot.
Do you need a building permit in Naples, and who issues it?
Naples City adopts the most recently adopted edition of the International Residential Code for detached single-family and two-family dwellings on individual lots2. The city's forms page lists a basic building permit, a conditional use permit and a driveway access permit3.
The city's building official handles inspections of used moved-in homes and used manufactured homes, which must meet the current IRC or HUD standards11. We could not confirm the city's full building-permit process, fee schedule or owner-builder rules, so call City Hall at the number below before you plan costs3.
Outside city limits, Uintah County Community Development issues building permits for unincorporated land; see the Uintah County page for those rules.
How do septic permits work in Naples, Utah?
Naples City's code accepts either a sewer or an approved septic system as the sanitation connection for a house, alongside water, gas and electric126. A lot without city sewer therefore needs an approved septic system.
Onsite wastewater systems in Uintah County are permitted and inspected by TriCounty Health Department4. We could not confirm a separate city septic permit, so start with the TriCounty Vernal office13.
Soil is a real question: across Uintah County, about 21.8% of soils rate not limited for a conventional drain field, so many lots need a site evaluation or an engineered system14.
Building a home in Naples, Utah: the steps, in order
- Confirm the lot's zoning district and that it is a legally subdivided parcel recorded with the Uintah County Recorder15. Ask City Hall for the zoning map5.
- Check the district's minimum lot, house size and height rules8.
- Contact TriCounty Health about a septic site evaluation and construction permit if no sewer is available13.
- Apply for the basic building permit and, if you need it, a driveway access permit at City Hall3.
- Build to the adopted International Residential Code, or use a HUD-labeled manufactured home2.
- Connect the required utilities permanently before occupancy12.
What stays with Uintah County, and what to check before you buy in Naples?
Septic permits come from TriCounty Health Department for the whole of Uintah County, city or not4. The county's own building and zoning rules cover unincorporated land only, so a parcel just outside Naples City is governed by the Uintah County page, not the city.
Utah requires a permit for shallow wells16; the city's own well rules are unconfirmed. Federal land makes up about 58.7% of Uintah County17, and the county's effective property tax rate is 0.5%18. The state highway access application is listed on the city's forms page if your driveway meets a state road3.
Watch-outs
- We could not confirm Naples City's building permit fees, application process or owner-builder rules; call the building official at City Hall3.
- A manufactured home in Naples City must carry a U.S. Department of Housing and Urban Development-approved insignia2.
- Zoning numbers such as the 20,000 square foot lot apply to RA-1; other districts differ8.
Sources
- Chapter 17.75: ZONES - City of Naples, UT (Naples), quoted and re-checked
- Chapter 17.80: SINGLE-FAMILY AND TWO-FAMILY DWELLING STANDARDS - City of Naples, UT (Naples), quoted and re-checked
- City of Naples City Hall (building official and permits) (naplescityut.gov)
- TriCounty Health Department - Wastewater & Septic Systems (2026 county census)
- Chapter 17.75: ZONES - City of Naples, UT (Naples), quoted and re-checked
- Chapter 17.80: SINGLE-FAMILY AND TWO-FAMILY DWELLING STANDARDS - City of Naples, UT (Naples), quoted and re-checked
- Chapter 17.85: RESIDENTIAL-AGRICULTURAL ZONE RA-1 - City of Naples, UT (Naples), quoted and re-checked
- Chapter 17.85: RESIDENTIAL-AGRICULTURAL ZONE RA-1 - City of Naples, UT (Naples), quoted and re-checked
- Chapter 17.85: RESIDENTIAL-AGRICULTURAL ZONE RA-1 - City of Naples, UT (Naples), quoted and re-checked
- Chapter 17.85: RESIDENTIAL-AGRICULTURAL ZONE RA-1 - City of Naples, UT (Naples), quoted and re-checked
- Chapter 17.80: SINGLE-FAMILY AND TWO-FAMILY DWELLING STANDARDS - City of Naples, UT (Naples), quoted and re-checked
- Chapter 17.80: SINGLE-FAMILY AND TWO-FAMILY DWELLING STANDARDS - City of Naples, UT (Naples), quoted and re-checked
- TriCounty Health Department — Vernal Office (tricountyhealthut.gov)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Chapter 17.80: SINGLE-FAMILY AND TWO-FAMILY DWELLING STANDARDS - City of Naples, UT (Naples), quoted and re-checked
- Water Well Drilling Information (Utah statewide rule), quoted and re-checked
- Federal land share: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.