Farr West, Utah, in Weber County, adopts its own zoning ordinance and building codes, so zoning approval and building permits for a house inside city limits come from Farr West City rather than the county123. Septic permits in Weber County come from the Weber-Morgan Health Department4, but Farr West's code makes private septic tanks unlawful where public sewer is available5.
At a glance
- Zoning
- Farr West City's own Uniform Zoning Ordinance1
- Building permit
- Applied for through Farr West City's online permit portal67
- Building codes
- City adopts the IBC, IRC, NEC, IPC and other standards2
- Septic
- Private septic tanks are unlawful where public sewer is available; Weber-Morgan Health issues Weber County septic permits54
- Minimum lot size
- 43,560 sq ft in A-1 and A-1-R; 15,000 sq ft in R-1-158
- Accessory dwelling
- Detached units need a city conditional use permit9
- Short-term rental of a DADU
- Rentals under 30 days are prohibited10
- Wells
- Utah water right and Start Card required11
Who to call
Building permits
Farr West City Building Department
Building permit applications, plan review and inspections inside Farr West city limits
1896 North 1800 West, Farr West, UT 84404
Septic permits
Weber-Morgan Health Department, Environmental Health Division
Septic (onsite wastewater) permits, plan review and inspections, and private well permits for Weber and Morgan Counties
477 23rd Street, Ogden, UT 84401
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in Farr West means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Farr West, Utah have zoning, and what does it mean for lots, setbacks and homes?
Yes. Farr West City enforces its own Uniform Zoning Ordinance for land inside city limits1. Weber County's zoning covers only unincorporated land, so the county's residential estates zone rules do not govern a Farr West lot12.
The city's residential standards are published by district. In the A-1 and A-1-R zones a single-family lot needs at least 43,560 square feet, and in R-1-15 the minimum is 15,000 square feet8. Single-family dwellings in these zones must sit at least 30 feet back from a city road and 40 feet from a state road, with a 30-foot rear setback and a 10-foot minimum side setback13. Maximum building height is 35 feet14.
Which district a parcel is in depends on the official zoning map, so confirm it with Farr West City before you buy15. We could not confirm Farr West's rules on living in an RV, camping, or a tiny home on a lot; ask city hall at7 before you plan on any of them.
Do you need a building permit in Farr West, and who issues it?
Farr West City adopts the International Building Code, International Residential Code, National Electrical Code and other standards for all construction in the city2. A new home application goes through the city's online portal and the city's building official reviews the plans6. Weber County's Building Inspection Division issues building permits only for unincorporated Weber County, so it is the wrong counter for a Farr West address3.
We could not find the city's general rule on exactly which projects need a permit, so ask the7 before starting work on a shed, deck or remodel. The city's page does say that owner-builder forms apply when homeowners act as their own general contractor, and that accessory buildings do not need one7.
How do septic permits work inside Farr West?
Start with sewer. Farr West's code requires a house or building used for occupancy to connect to the public sewer when the property abuts a street or right-of-way holding the system, or when the sewer is within 300 feet of the property line16. Connection is at the owner's expense and is due within 60 days after official notice16. The same chapter makes private privies, septic tanks and cesspools unlawful, subject to its stated exceptions5.
For a lot that is allowed an onsite system, the Weber-Morgan Health Department handles septic permits in Weber County4. Its permit requires a site and soil evaluation, and a conventional system carries a $375 permit fee plus a $40 state fee17. We could not confirm which agency administers septic permits specifically inside the city, so call the18 to verify before you rely on a septic design.
Can you live in an RV or tiny home in Farr West?
We could not confirm any Farr West rule on RV occupancy, temporary camping or tiny-home living, so do not assume any of them is allowed; ask Farr West City before you buy or move anything onto a lot7.
The city does allow one related option, a detached accessory dwelling unit, with conditions. A DADU needs a city conditional use permit and must meet city building, health and fire codes9. It must be a single-family slab-on-grade unit of 400 to 1,000 square feet, and the owner must live in the main residence9. Renting a DADU for fewer than 30 days is prohibited10. A DADU or group of accessory buildings may cover no more than 20 percent of a rear yard19.
Building a home in Farr West: the steps, in order
- Confirm the zoning district and lot standards with Farr West City15.
- Check whether public sewer reaches the lot, because the city's code limits private septic where it does16. If it does not, contact the18 about an onsite system4.
- Get site plan approval, which the city requires before a building permit is submitted7.
- Gather the application package: engineered plans, a site plan, RESCheck, structural calculations, SWPPP documents, and culinary and secondary water receipts6.
- Submit through the city's online portal; the city's stated average for the permit process is 10-14 days6.
- Pay the invoice the city sends after the building official and the storm-water manager approve; the permit opens once payment is processed6.
- Schedule inspections with 24 hours notice7.
What stays with Weber County, and what should you check before buying in Farr West?
The county's rules for unincorporated land are on the Weber County page; they do not apply inside Farr West3.
Water: a Utah water right must exist before a shallow well is built, and the Start Card issued on approval of the water right is the permit to construct the well11. The Weber-Morgan Health Department lists a private well or spring permit fee of $80018. A new-home application also needs culinary and secondary water receipts6.
Costs: Weber County's effective property tax rate is 0.6 percent20, with a median annual bill of $2,41521. These are county-level figures, not Farr West's alone.
Watch-outs
- Farr West's septic rule has exceptions the city code states, and we could not confirm which agency permits septic inside city limits, so confirm with the Weber-Morgan Health Department and the city before buying a lot without sewer access518.
- Zoning district standards differ by zone, so confirm a parcel's district on the official zoning map or with Farr West City before relying on lot size or setback numbers15.
- We could not confirm Farr West's floodplain, RV, tiny-home or agricultural-building rules; ask the Farr West City Building Department before you buy7.
- Weber County's building, driveway and floodplain offices serve unincorporated land, so do not use them for a Farr West address3.
Sources
- Farr West City Code § 17.04.010, Short Title (Farr West), quoted and re-checked
- Farr West City Code § 15.04.010, Codes and Standards (Farr West), quoted and re-checked
- Building Inspection, quoted and re-checked
- Utah Administrative Code R317-4, Onsite Wastewater Systems, quoted and re-checked
- Farr West City Code § 13.04.030, Use of Public Sewers Required (Farr West), quoted and re-checked
- Building a New Residential Home — Farr West City (Farr West), quoted and re-checked
- Farr West City Building Department (farrwestcity.net)
- Farr West City Code § 17.44.190, Site Development Standards for All Residential Zones (Farr West), quoted and re-checked
- Farr West City Code § 17.44.220, Detached Accessory Dwelling Units (Farr West), quoted and re-checked
- Farr West City Code § 17.44.220, Detached Accessory Dwelling Units (Farr West), quoted and re-checked
- Utah Division of Water Rights — Water Well Drilling Information (Farr West), quoted and re-checked
- webercountyutah.gov, quoted and re-checked
- Farr West City Code § 17.44.190, Site Development Standards for All Residential Zones (Farr West), quoted and re-checked
- Farr West City Code § 17.44.190, Site Development Standards for All Residential Zones (Farr West), quoted and re-checked
- Farr West City Code § 17.44.190, Site Development Standards for All Residential Zones (Farr West), quoted and re-checked
- Farr West City Code § 13.04.030, Use of Public Sewers Required (Farr West), quoted and re-checked
- Water Quality | Weber-Morgan Health Department, quoted and re-checked
- Weber-Morgan Health Department, Environmental Health Division (webermorganhealth.gov)
- Farr West City Code § 17.44.220, Detached Accessory Dwelling Units (Farr West), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.