Bolthole Index

Chesterfield County, Virginia

Building permits, zoning and septic rules in Chesterfield County, Virginia

55Index Score / 100
#85 of 133 in Virginia

Chesterfield County, Virginia requires a permit before most residential construction, structural work, alteration or demolition1. The county conducts inspections, requires a certificate of occupancy before a new house is occupied and administers countywide zoning234. The Chesterfield Health District handles septic and private-well permitting5.

At a glance

Building permit
Required before most construction, alteration or demolition1
Zoning
Yes, countywide; look up the parcel's district and overlays67
Septic permits
Chesterfield Health District58
Owner-builder exemption
Contractor-license exemption for one primary residence per 24 months; code still applies9
Septic soil suitability
15% of soils rate favorably for a conventional drain field10
Typical home value
$416,58711
Effective property tax rate
0.8% (about $2,636/year on the typical home)1213
Wooded share of land
84.9%14

Who to call

Building permits

Chesterfield County Building Inspection Department

Reviews plans, issues residential building permits and performs inspections in Chesterfield County under the Virginia Uniform Statewide Building Code; the automated inspection scheduling line is 804-751-4444

804-751-4990

9800 Government Center Parkway, Chesterfield, VA 23832

Zoning

Chesterfield County Planning Department

Administers Chesterfield County's Zoning Ordinance and reviews zoning amendment applications and proposals

804-748-1050

9800 Government Center Parkway, Chesterfield, VA 23832

Septic permits

Chesterfield & Colonial Heights Health Department - Environmental Health (Virginia Department of Health)

State health department office that issues onsite sewage (septic) and private well construction permits for Chesterfield County

804-748-1691

9501 Lucy Corr Circle, Chesterfield, VA 23832

Roads & driveways

VDOT Central Office Land Use Permit Section

Issues land use / entrance permits for driveways and other work connecting to VDOT-maintained highways in Chesterfield County

804-640-3222

Contact details are copied from each office’s official page and were checked against it on October 10, 2026.

Off-grid gear

Going off-grid in Chesterfield County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Chesterfield County, Virginia?

Yes. Chesterfield County requires a permit before residential construction, reconstruction, enlargement, alteration, demolition or structural work begins; ordinary repairs and cosmetic work are among the listed exceptions1. Chesterfield County enforces the 2021 edition of the Virginia building codes15. Inspections depend on the project scope, and the homeowner or contractor schedules them as work advances2. A new house needs final building approval and all applicable county-department approvals before Chesterfield County issues its certificate of occupancy3. A qualifying farm building used for farming rather than residence can be exempt from the building code, but floodplain rules still apply16. Virginia's owner-builder exemption applies to contractor licensing for a person who performs or supervises construction of no more than one primary residence for their own use in any 24-month period; it does not eliminate building, trade, health, zoning or occupancy approvals17.

Who is the Chesterfield County building department, and how do you reach them?

Chesterfield County's Building Inspection Department is at 9800 Government Center Parkway, Chesterfield, and its main number is 804-751-499018. For a house or addition, contact Planning about setbacks and easements, assemble the required documents, then submit the application and construction documents; the application and inspections depend on the project's scope19. The county states a goal of reviewing residential plans within 10 working days20. Chesterfield County publishes residential permit fees, which are paid with the application; minor work under $500 can be fee-exempt only when no electrical, gas, mechanical or plumbing permit is required21. The homeowner or contractor schedules inspections as work advances2.

Does Chesterfield County have zoning?

Yes. Chesterfield County administers countywide zoning under Chapter 19.2, which became effective January 1, 2026622. The county publishes the current ordinance and a zoning-and-development map237. Minimum lot area depends on the zoning district and use, while setbacks come primarily from each district's dimensional-standards table and can change with overlays, use restrictions or parcel-specific exceptions2425. Major subdivisions, meaning division into two or more lots for residential use, go through county subdivision review, and minor and family subdivisions follow separate procedures26. We could not confirm one countywide answer for minimum dwelling size, building height, accessory dwellings, RV occupancy or tiny-home occupancy. Call the Planning Department at 804-748-1050 with the parcel and proposed use27.

How do septic permits work in Chesterfield County?

The Chesterfield Health District, part of the Virginia Department of Health, handles onsite sewage and private-well permits5. A written construction permit is required before an onsite sewage system is built, expanded or modified, and permit conditions may apply288. Chesterfield County also requires Health Department approval during the house-permit process when a home will use a well or septic system20. Only 15% of Chesterfield County soils rate without severe limits for a conventional drain field, so confirm public-sewer availability or septic feasibility before treating a lot as buildable10. We could not confirm a universal local septic-inspection requirement; ask Environmental Health at 804-748-1691 about the specific project29.

Can you live in an RV or tiny home on your land in Chesterfield County?

We could not confirm a countywide rule allowing RV residence, temporary camping on private land or tiny-home occupancy in Chesterfield County. Start with the parcel's zoning district and current use standards7. Manufactured homes are not a workaround: in several named districts, Chesterfield County bars their use as dwellings or accessory structures except where Chapter 19.2 specifically allows it30. The Board of Zoning Appeals may allow a temporary manufactured home for no more than seven years under listed circumstances, including when a principal residence in certain districts becomes uninhabitable because of fire or an Act of God30. Give the Planning Department the parcel address, district, exact unit and intended occupancy before buying or placing it27.

Building a home in Chesterfield County: the steps, in order

  1. Look up the parcel's zoning district and confirm its use, lot-area and setback standards with the Planning Department7242527.
  2. If creating lots, determine which county subdivision review applies31.
  3. Identify buffers, easements and floodplains on the plans; Chesterfield County says structures may not be located in those identified areas32.
  4. For a well or septic home, obtain Health Department approval205.
  5. If public water or wastewater facilities are part of the development, obtain county utilities-plan approval before construction or building-permit issuance3334.
  6. Submit the residential application and construction documents, pay the published fees and wait for permit issuance1921.
  7. Call for the required inspections, then obtain final departmental approvals and the certificate of occupancy before moving into a new house23.

What to check before you buy land in Chesterfield County

Check the parcel's zoning district, minimum lot area and setbacks before relying on a listing's description of what can be built, and investigate county subdivision review if the tract will be divided7242531. Have the site plan identify every buffer, easement and floodplain, because Chesterfield County's residential requirements say structures may not be located in those identified areas32. Only 15% of county soils rate without severe limits for a conventional septic drain field, so verify public-sewer availability or obtain a site evaluation10. Public utility plans require county approval when a development needs public water or wastewater facilities, but the source does not say every residential parcel must connect3334. The effective property-tax rate is about 0.8%, and the median annual bill is about $2,6361213. We could not confirm current short-term-rental or accessory-dwelling rules; ask Planning about those uses27.

Watch-outs

  • Chesterfield County's current Zoning Ordinance became effective January 1, 2026, so older district guidance may be obsolete22.
  • Virginia's owner-builder exemption covers contractor licensing for no more than one owner-occupied primary residence in a 24-month period; the building code still applies9.
  • Chesterfield County's published residential fee schedule runs from July 1, 2026 through June 30, 2027, so verify fees if applying after that period21.

Sources

  1. Residential Permits and Inspections Processes, quoted and re-checked
  2. Residential Permits and Inspections Processes, quoted and re-checked
  3. Requirements for Building a House or Addition, quoted and re-checked
  4. Zoning Ordinance Modernization Project, quoted and re-checked
  5. Onsite Sewage (Septic) & Well Water Program, quoted and re-checked
  6. Ordinances, Policies and Regulations, quoted and re-checked
  7. Ordinances, Policies and Regulations, quoted and re-checked
  8. 12VAC5-610-240. Permits; general, quoted and re-checked
  9. § 54.1-1101. Exemptions; failure to obtain certificate of occupancy; penalties, quoted and re-checked
  10. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  11. Typical home value (Zillow): Bolthole Index county data
  12. Effective property tax rate: Bolthole Index county data
  13. Median property tax bill: Bolthole Index county data
  14. Wooded share of land: Bolthole Index county data
  15. Residential Project Requirements and Application Submittal, quoted and re-checked
  16. Code of Virginia § 36-99. Provisions of Code; modifications (Virginia statewide rule), quoted and re-checked
  17. § 54.1-1101. Exemptions; failure to obtain certificate of occupancy; penalties, quoted and re-checked
  18. Chesterfield County Building Inspection Department (chesterfield.gov)
  19. Residential Permits and Inspections Processes, quoted and re-checked
  20. Requirements for Building a House or Addition, quoted and re-checked
  21. Residential Building Inspection Fee Schedule, quoted and re-checked
  22. Ordinances, Policies and Regulations, quoted and re-checked
  23. Zoning Ordinance Modernization Project, quoted and re-checked
  24. Site Plan Checklist, quoted and re-checked
  25. Site Plan Checklist, quoted and re-checked
  26. Subdivision Review, quoted and re-checked
  27. Chesterfield County Planning Department (chesterfield.gov)
  28. 12VAC5-610-240. Permits; general, quoted and re-checked
  29. Chesterfield & Colonial Heights Health Department - Environmental Health (Virginia Department of Health) (vdh.virginia.gov)
  30. Chapter 19.2 Chesterfield County Zoning Ordinance Modernization, quoted and re-checked
  31. Ordinances, Policies and Regulations, quoted and re-checked
  32. Residential Project Requirements and Application Submittal, quoted and re-checked
  33. Chesterfield Water and Sewer Specifications and Procedures - Fifth Edition, quoted and re-checked
  34. Construction, Developers and Commercial Customers, quoted and re-checked

Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Chesterfield County requires a building permit for a home.

RuleChesterfield CountyRichmond CityColonial Heights CityPowhatan CountyPetersburg CityHenrico CountyHopewell City
Building permitRequiredRequiredRequiredRequiredRequiredRequiredRequired
County zoningYesYesYesYesYesYesYes
Septic permitsVA Dept. of HealthVA Dept. of HealthVDHVA Dept. of HealthVA Dept. of HealthVA Dept. of HealthVDH

County locator

Chesterfield County in Virginia

55
County map
Chesterfield County highlighted among the Virginia counties · colored by Index score

How Chesterfield County scores

Seclusion22100% ev.
Self-Sufficiency68100% ev.
Admin Boringness43100% ev.
Durability80100% ev.
Property Autonomy66100% ev.
Carry Cost64100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$417kTypical home
0.8%Property tax
$8,136Land / acre
46.6"Annual rain
1.3% of yrsSevere drought
7.9 / yr (+7.2)Mid-century 100°F days
13.1 daysMid-century dry spell
2.26" (+8.3%)Mid-century 1-day rain
1.43×Wildfire change factor
100%Forward climate coverage
$1,273Home insurance / yr
3% / yrInsurance growth
1.82%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
379,946People within 30 min
4,395,625People within 2 hr
454,195Radius comparison (15 mi)
906.4People / sq mi
0.7%Federal land
88.1%Land at 15% slope or less
15%Soils rated "not limited" for septic (strict USDA rating)
38,480 acWorkable land screen
84.9%Wooded land
78.2 tonsBiomass / forest ac
58.5°FAvg temp

Scout Chesterfield County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Chesterfield County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Answers from the rulebook for Chesterfield County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Chesterfield County rules

  • Building permitRequired

    Residential construction, reconstruction, enlargement, alteration, demolition, and structural work in Chesterfield County.

    • A permit is required before work begins.
    • Ordinary repairs and cosmetic work are excluded in the examples provided by the county.
    • New houses, additions, structural work, and other listed projects require permits.
    “Whenever you construct, reconstruct, enlarge, alter or demolish a structure, a permit is required before starting the work.”
    One more reviewed finding on this topic
    • Required — Construction, reconstruction, enlargement, alteration, or demolition of structures in Chesterfield County.
      “Whenever you construct, reconstruct, enlarge, alter or demolish a structure, a permit is required before starting the work.”
  • Building code adoptedAdopted (with conditions)

    Residential construction reviewed by Chesterfield County Building Inspection.

    • The county page states it is enforcing the 2021 code edition of the Virginia Library of Building Codes.

    code edition: 2021

    “Chesterfield County is currently enforcing the 2021 code edition of the Virginia Library of Building Codes.”
  • InspectionsRequired

    Residential building and structural projects requiring county permits.

    • Required inspections depend on project type.
    • Final building inspection occurs after all sub-trade final inspections and other required departmental inspections are approved.
    • Inspection timing varies by inspection type.
    “At various points along the way, the homeowner/contractor schedules an inspection to verify that the work has been done in compliance with the approved construction documents and the code.”
    One more reviewed finding on this topic
    • Required — Residential houses, additions, conversions, and finishing-off-space projects, depending on scope and construction details.
      “The following inspections are typically required for new homes, additions, conversions and finishing off space depending on the scope of work and specific construction details.”
  • Certificate of occupancyLimited

    Commercial buildings and tenant spaces in Chesterfield County.

    • A Certificate of Occupancy is required before occupancy of a new building or tenant space.
    • A Certificate of Occupancy is required before a change of occupancy classification.
    • A Certificate of Occupancy is required whenever permits have been issued for renovation of a building or tenant space.
    • If a renovated building or tenant space has a valid Certificate of Occupancy, final inspection approvals serve as the Certificate of Occupancy.
    • A building or tenant space cannot be stocked before issuance of the Certificate of Occupancy unless approved by the Commercial Building Inspector.
    • Required approvals include exit stairs; grade exit lobbies, corridors, or passageways; elevator shaft enclosures and third-party elevator inspection where applicable; required exit and emergency lighting and generator where provided; final special-inspection report where applicable; removal of trash and construction debris; all associated subcontractor final inspections; all departmental final inspections; and other inspection-process items required for occupancy.
    • A Temporary Certificate of Occupancy may be issued when a clear certificate cannot be issued because of departmental final-inspection issues such as landscaping, paving, or lot stabilization; a TCO allows additional time for compliance and approval for an additional fee.
    “A Certificate of Occupancy (CO) is required prior to occupancy of a new building or tenant space, prior to a change of occupancy classification of a building or tenant space, or whenever permits have been issued for renovation of a building or tenant space.”
    One more reviewed finding on this topic
    • Required — New houses in Chesterfield County before occupancy.
      “For a new house, once you have obtained an approved final building inspection and approvals from all applicable county departments, you will be issued a Certificate of Occupancy (CO) and will be allowed to move in.”
  • County-wide zoningPresent (with conditions)

    Countywide zoning ordinance administered by Chesterfield County.

    • The county zoning ordinance includes zoning amendments, conditional uses, zoning deviations, resource protection area exceptions, and amendments of conditions.
    • The current Chapter 19.2 ordinance was adopted 09/17/2025 and became effective 01/01/2026.
    “The zoning application process is designed to help prepare zoning amendment applications for public hearing by the Planning Commission and the Board of Supervisors.”
    2 more reviewed findings on this topic
    • Present — County zoning ordinance administered by Chesterfield County.
      “ZOMod will replace all current zoning districts with their nearest equivalent new districts.”
    • Present — Countywide zoning ordinance administered by Chesterfield County.
      “View the subdivision (Chapter 17.1) and zoning (Chapter 19.2) ordinances of the County Code.”
  • Local zoningPresent

    County-administered zoning throughout Chesterfield County, including zoning districts and development standards under Chapter 19.2.

    • The county ordinance replaced Chapter 19.1 effective January 1, 2026.
    “The Zoning Ordinance Modernization (ZOMod) project is a comprehensive re-write of the Zoning Ordinance, which is necessary to fully implement future visions for Chesterfield. The new Zoning Ordinance is live and is effective as of Jan. 1, 2026.”
    2 more reviewed findings on this topic
    • Present — Countywide aggregate zoning regulation in Chesterfield County, including zoning districts and county planning review.
      “The new Zoning Ordinance is live and is effective as of Jan. 1, 2026.”
    • Present (with conditions) — County zoning regulation within Chesterfield County, including parcel-specific district standards.
      “View the subdivision (Chapter 17.1) and zoning (Chapter 19.2) ordinances of the County Code.”
  • Zoning districtsPublished (with conditions)

    Zoning districts and parcel-specific zoning designations in Chesterfield County.

    • The county provides the current zoning ordinance and a zoning-and-development ordinances map.
    • District-specific dimensional and use standards must be consulted for the affected parcel.
    “View the Zoning and Development Ordinances Map.”
    2 more reviewed findings on this topic
    • Published — County zoning districts and ordinance standards.
      “ZOMod will replace all current zoning districts with their nearest equivalent new districts.”
    • Published — Zoning districts and associated development-ordinance designations for Chesterfield County parcels.
      “View the Zoning and Development Ordinances Map.”
  • Minimum lot sizeDistrict specific (with conditions)

    Minimum lot area for development governed by Chesterfield County zoning; the applicable value depends on the parcel's Article 2 zoning district and any overlay, zoning case, or other applicable development standard.

    • The County checklist requires the zoning district and any zoning case establishing the site's zoning to be specified.
    • Dimensional standards are located at the end of each zoning district in the ordinance.
    • Development standards are based largely on the specific zoning district and/or overlay district.
    • Existing standards and conditions approved by previous zoning actions remain in place under the County's ZOMod transition information.
    “Lot means a single recorded partitioned land area set off by metes and bounds and occupied, or intended to be occupied, by a principal building or buildings and accessory buildings and uses, together with such open spaces as are required under this C hapter and having not less than the minimum area required by this C hapter for a lot in the district in which it is situated and fronting on a road except as otherwise permitted.”
  • SetbacksDistrict specific (with conditions)

    Building, driveway, parking, front-yard, side-yard, and rear-yard setbacks for development governed by Chesterfield County zoning; the applicable values depend on the parcel's Article 2 zoning district and any overlay district.

    • The County checklist requires the site plan to identify building, driveway, and parking setbacks for front, side, and rear yards.
    • Development standards are based largely on the specific zoning district and/or overlay district.
    • Setback exceptions may be allowed by a variance, zoning case, or setback averaging along a major arterial street under Section 19.2-37.
    • Side and rear setbacks may increase based on building height under Section 19.2-37.G.
    • Employment EG and WD Districts have increased setbacks under Sections 19.2-20 and 19.2-21.
    • Overlay districts may supersede standard buffer requirements; the checklist identifies Village Overlay and Urban Corridor Overlay rules.
    • There are no setback requirements from a railroad right of way under Section 19.2-37.D.2.d.
    “Be aware that setbacks are primarily listed in the Dimensional Standards tables within each Zoning District in Article 2.”
  • Manufactured homesLimited

    Use of manufactured homes and temporary manufactured homes under Chesterfield County's current zoning ordinance.

    • In the RC, SR, SC, SU, TR, UR, NB, and MU Districts, a manufactured home or trailer may not be used for a dwelling, garage, storage building, boathouse, or other accessory use, except as otherwise specified in Chapter 19.2; government buildings are exempt.
    • Temporary manufactured-home permits may be granted by the Board of Zoning Appeals for a period not exceeding seven years, with or without conditions.
    • Temporary manufactured homes may be permitted under the ordinance's listed circumstances, including a valid permit approved before January 1, 2026; an A, RC, SR, SC, SU, or AR District where the principal residence was rendered uninhabitable by fire or Act of God; or a CC, EC, EG, or WD District where a manufactured home was legally on the property within the preceding six months.
    • The ordinance uses a principal-use matrix and district-specific restrictions; this claim does not treat the cited district restrictions as a uniform prohibition in every zoning district.

    maximum temporary manufactured-home permit period: <= 7 years

    “Temporary manufactured home permits may be granted by the Board of Zoning Appeals for a time period not to exceed seven years, and with or without conditions, under any one of the following circumstances:”
  • Who permits septicState (with conditions)

    Onsite sewage and private-well permitting and environmental-health services for Chesterfield County.

    • The Chesterfield Health District operates under the Virginia Department of Health.
    “Offering permits for private wells, sewage systems, and sewage disposal”
    One more reviewed finding on this topic
    • State (with conditions) — Onsite sewage and well-water administration in the Chesterfield Health District.
      “Offering permits for private wells, sewage systems, and sewage disposal”
  • Mandatory utility hookupConditional

    Development projects requiring public water or wastewater utility facilities or connections.

    • Utilities plan approval is required for development.
    • Before construction of a public utility facility and issuance of any building permits, water and/or wastewater plans must be submitted and approved.
    • The source does not establish that every residential parcel must connect to public utilities.
    “Development in Chesterfield County requires utilities plan approval.”
  • Subdividing landRegulated (with conditions)

    Commercial and residential subdivision requests in Chesterfield County.

    • Major subdivisions include division into two or more lots for residential or residential townhouse use.
    • Minor subdivisions and family subdivisions have separate procedures and eligibility requirements.
    • Applications proceed through county review and applicable county and state checklists.
    “The subdivision review team reviews and makes recommendations relating to subdivision (commercial and residential) requests.”
    One more reviewed finding on this topic
    • Regulated (with conditions) — Subdivision and related development approvals in Chesterfield County.
      “View the subdivision (Chapter 17.1) and zoning (Chapter 19.2) ordinances of the County Code.”
  • Building in a floodplainRequired

    Residential construction plan submittals where floodplains are present.

    • Residential application materials require identifying all floodplains on the property.
    • No structure may be located in identified floodplains under the cited residential requirements.
    “All buffers, easements or floodplains located on your property (no structure may be located in these areas).”
  • Permit feesPublished (with conditions)

    Residential building inspection and permit fees in Chesterfield County.

    • Fees are paid at application.
    • The residential schedule is effective 07/01/2026 through 06/30/2027.
    • Minor work under $500 may be fee-exempt when no electrical, gas, mechanical, or plumbing permit is required.
    • Accessibility ramps for single-family dwellings may be fee-exempt when medical-need proof is provided.

    fee schedule effective start: 2026-07-01 · fee schedule effective end: 2027-06-30 · minor work cost threshold: < 500 USD (and no electrical, gas, mechanical, or plumbing permit is required)

    “The Chesterfield County residential fee schedule effective 7/1/2026 through 6/30/2027 only pertains to residential construction.”
  • Permit processPublished (with conditions)

    County review of water and sewer plans for development projects.

    • A professional engineer or qualified professional surveyor must design the plans.
    • Plans are reviewed and revisions must be resubmitted for final review.
    • A letter of approval is sent when county criteria are met.
    • Four additional plan sets are required after approvals for construction purposes.
    “The plans will be reviewed, and a review comments reference will be provided to the engineer. When the revisions are made, the engineer must resubmit the plans for final review. A letter of approval will be sent when all the County criteria are met. Four sets of additional plans shall be sent once all the approvals are granted for construction purposes.”
    2 more reviewed findings on this topic
    • Published (with conditions) — Residential permit and inspection applications in Chesterfield County.
      “The type of permit application you submit and inspections you need depends on the scope of your project.”
    • Published (with conditions) — Residential house and addition permit process in Chesterfield County.
      “Complete the permit application(s), submit the construction documents and pay the required fees.”

Virginia rules that apply here

  • Owner-builder exemptionConditional

    A person performing or supervising construction, removal, repair, or improvement of one primary residence owned by that person and for that person's own use, for contractor-licensing purposes.

    • The exemption is limited to no more than one primary residence owned by the person and for the person's own use during any 24-month period.
    • The exemption from contractor licensing does not exempt the work from the Virginia Uniform Statewide Building Code.
    • If the person is exempt under subdivision A 7 and conveys the property to a third-party purchaser, the person must obtain a certificate of occupancy before conveyance unless the purchaser acknowledges in writing that no certificate of occupancy has been issued and consents to acquire the property without one.
    • The exemption concerns Chapter 11 contractor licensing; applicable building permits and inspections remain governed by the Uniform Statewide Building Code.

    primary residences per 24-month period: <= 1 residence (residence must be owned by the person and for the person's own use)

    “Any person who performs or supervises the construction, removal, repair, or improvement of no more than one primary residence owned by him and for his own use during any 24-month period;”
    2 more reviewed findings on this topic
    • Available (with conditions) — A person constructing, removing, repairing, or improving no more than one primary residence owned by that person and for that person's own use during any 24-month period.
      “Any person who performs or supervises the construction, removal, repair, or improvement of no more than one primary residence owned by him and for his own use during any 24-month period;”
    • Available (with conditions) — Contractor-licensing exemption for an owner constructing or supervising construction of a primary residence for the owner’s own use.
      “Any person who performs or supervises the construction, removal, repair, or improvement of no more than one primary residence owned by him and for his own use during any 24-month period;”
  • Accessory dwellingsAllowed (with conditions)

    Accessory dwelling units on residential dwelling lots in single-family residential zoning districts, under Virginia Code § 15.2-2292.4 effective July 1, 2027.

    • The ADU must be attached or detached, provide complete independent living facilities, be on the same lot as a proposed or existing primary residence, and include facilities for living, sleeping, eating, cooking, and sanitation.
    • The locality must treat ADUs as a permitted accessory use in single-family residential zoning districts, subject to the statute's listed exceptions and conditions.
    • An applicant must first obtain an ADU permit from the locality; the locality may charge no more than $500 for that permit, in addition to applicable inspection, site, or building permit fees.
    • Localities may require a rental lease term of at least 30 consecutive days; replacement or dedicated parking; floor-area, lot-coverage, and impervious-area limits of at least 350 square feet on lots under 2,500 square feet and at least 500 square feet on lots of 2,500 square feet or greater; building-code, water, sewer, septic, emergency-access, flood-zone, stormwater, historic-district, corridor-protection, and Air Installations Compatible Use Zone compliance; owner occupancy of either the ADU or primary dwelling at application; an ADU no more than 500 feet from the primary dwelling; no ADU on a residential lot with more than one dwelling unit; and no separate sale or subdivision from the primary dwelling.
    • Localities may not require rear or side setbacks greater than those applicable to the primary dwelling or accessory structures, more restrictive ADU restrictions regarding height, rear or side setbacks, lot size or coverage, or building frontage than for single-family dwellings in the same zoning area, restrictive covenants concerning an ADU on a qualifying lot, public-street improvements except for repair or reconstruction of construction-related disturbance, or consanguinity or affinity between occupants.
    • The statute does not supersede private contracts, recorded declarations, condominium instruments, common-interest-community declarations, cooperative instruments, or property-owners'-association declarations.
    • The statute does not apply to existing ADU permits approved before July 1, 2027.
    • The statute does not restrict a locality from passing before July 1, 2027, an ADU ordinance or amendment that substantially complies with the statute.
    • The statute does not apply to a locality that adopted an ADU ordinance before January 1, 2026.

    ADU permit fee maximum: <= 500 USD (Additional inspection, site, or building permit fees may apply.) · minimum floor-area limit on lots under 2,500 square feet: >= 350 square feet (Locality may impose limits on floor area, lot coverage, and impervious area.) · minimum floor-area limit on lots of at least 2,500 square feet: >= 500 square feet (Locality may impose limits on floor area, lot coverage, and impervious area.) · maximum ADU distance from primary dwelling: <= 500 feet (A locality may require this limit.) · effective date: 2027-07-01

    “§ 15.2-2292.4. (Effective July 1, 2027) Development and use of accessory dwelling units. [...] Zoning ordinances for single-family residential zoning districts shall be deemed to include accessory dwelling units as a permitted accessory use, and no locality shall require compliance with any other requirements except as provided in this section.”
  • Septic permitRequired

    Construction, operation, expansion, or modification of a sewage disposal or handling system in Virginia.

    • A written construction permit is required before construction, expansion, or modification.
    • A written operation permit is required for sewage disposal systems constructed after the effective date of the chapter.
    • Permit conditions may be imposed and must be followed.
    • The $75 statutory onsite sewage permit application fee may be waived for applicants below federal poverty guidelines or applications for a pit privy or repair of a failing onsite sewage system; the fee is refunded if the Department denies a permit for land on which the applicant seeks to construct a principal residence.

    onsite sewage permit application fee: 75 USD (Statutory fee; waiver and refund provisions apply as stated in § 32.1-164(C).)

    “No person or owner shall construct, operate, expand or modify a sewage disposal or handling system without a written permit from the commissioner.”
    One more reviewed finding on this topic
    • Required — Construction, operation, expansion, or modification of an onsite sewage disposal system in Chesterfield County.
      “No person or owner shall cause or allow the construction, expansion or modification of a sewage disposal system without the written construction permit from the commissioner which authorizes the construction or modifications.”
  • Septic inspectionLimited

    Installation of sewage disposal systems statewide.

    • For installations not pursuant to a design certified by a licensed professional engineer or onsite soil evaluator, no part may be covered or used until inspected, corrected if necessary, and approved by the district or local health department, unless expressly authorized.
    • Installations under a certified professional engineer or onsite soil evaluator design are exempt from the local-health-department inspection requirement in 12VAC5-610-320 and instead require the certifier's inspection report under 12VAC5-610-330.
    • The rule is inapplicable to a Type III septage disposal facility.
    “This section shall not apply to any sewage disposal system installation that is pursuant to a design certified by a licensed professional engineer or onsite soil evaluator.”
  • Agricultural exemptionConditional

    Farm buildings and structures under the Virginia Uniform Statewide Building Code.

    • A farm building or structure is not used for residential purposes, is located on property where farming operations take place, and is used primarily for a listed farm use.
    • The exemption does not apply to a building or portion of a building on a farm that is operated as a restaurant and licensed by the Board of Health under Chapter 2 (§ 35.1-11 et seq.) of Title 35.1.
    • Farm buildings and structures in a flood plain or mudslide-prone area remain subject to applicable flood-proofing or mudslide regulations.
    • A qualifying agritourism farm building or structure where the public is invited to enter and which is used for display, sampling, or sale described in § 36-99 must have portable fire extinguishers, a simple written emergency plan, and the required exemption sign.
    “Notwithstanding the provisions of this section, farm buildings and structures shall be exempt from the provisions of the Building Code, except for a building or a portion of a building located on a farm that is operated as a restaurant as defined in § 35.1-1 and licensed as such by the Board of Health pursuant to Chapter 2 (§ 35.1-11 et seq.) of Title 35.1.”
  • Driveway accessRequired

    Construction or modification of entrances connecting to VDOT-maintained highways and activities in VDOT highway right-of-way.

    • The requirement applies to state-maintained highways and right-of-way under VDOT jurisdiction.
    • Entrance location and design must comply with VDOT access-management regulations and design standards.
    • Applications are typically obtained through the VDOT district or residency office serving the locality.
    • An existing entrance also requires a land-use permit when modified because of a change in land use, traffic volume, or type of traffic.
    “Anyone who plans to work or perform an activity on or crossing any right of way under the jurisdiction of the Department must first obtain a land use permit. These include activities such as installation of utilities, construction of private and commercial entrances, landscaping, the temporary use of the right-of-way, as well as numerous other types of activities.”
  • Short-term rentalsLimited

    Residential dwelling use as a short-term rental in Virginia.

    • Existing local authority to regulate short-term rentals through general land-use and zoning authority is preserved.
    • A locality may adopt a registration ordinance, and a registration ordinance may impose a penalty up to $500 per violation for an operator required to register.
    • A locality may limit a lessee or sublessee to one short-term rental within the locality.
    • For a residential dwelling also legally occupied by the property owner as the primary residence, a local ordinance enacted after December 31, 2023, or a later amendment, may not require a special exception, special use, or conditional use permit for short-term rental use.
    • Private contracts, condominium instruments, common-interest-community declarations, cooperative instruments, and property-owners-association declarations are not superseded.

    registration penalty: <= 500 USD per violation (Only where a locality adopts a registry ordinance and the operator is required to register.) · owner-occupied primary residence special-use permit prohibition date: > 2023-12-31 (Applies to local ordinances enacted after this date or subsequent amendments.)

    “Except as provided in this section, nothing herein shall be construed to prohibit, limit, or otherwise supersede existing local authority to regulate the short-term rental of property through general land use and zoning authority.”
  • Campground & park staysLimited

    Recreational vehicles and other camping units offered as campsites in Virginia campgrounds, including facilities with three or more campsites and travel-trailer camps; this claim does not establish a general residential right to occupy an RV outside the specified campground framework.

    • A campground includes land or facilities accommodating camping units for periods of overnight or longer and includes travel trailer camps.
    • A campground must be permitted by the Virginia Department of Health and is inspected annually by local health department staff.
    • Offering three or more campsites may require a campground permit, including short-term or online-advertised camping.
    • Temporary campground permits allow up to 14 days of temporary camping, consecutively or nonconsecutively, within a 60-day period.
    • Temporary campgrounds must provide at least one portable toilet per 75 campers, make sewage-tank pumping available when RVs are present, and provide an acceptable water source.
    • The statutory definition excludes property where an individual owner may choose to camp, provided the owner is not prohibited or encumbered by covenants, restrictions, or conditions from providing sanitary facilities within the owner's property lines.
    • Other exclusions include summer camps, migrant labor camps, parks for manufactured homes, construction camps, and storage areas for unoccupied camping units.

    minimum campsites for campground definition: >= 3 campsites (The individual-owner camping exception and other statutory exclusions apply.) · temporary campground permit duration: <= 14 days (In a 60-day period, consecutively or nonconsecutively.) · temporary campground permit period: 60 days · portable toilets: per 1 per 75 campers (Temporary campgrounds.)

    “"Campground" means any area, place, parcel, or tract of land, by whatever name called, on which three or more campsites are occupied or intended for occupancy, or facilities are established or maintained, wholly or in part, for the accommodation of camping units for periods of overnight or longer [...] "Camping unit" means any device or vehicular type structure for use as temporary living quarters or shelter during periods of recreation, vacation, leisure time, or travel, including any tent, tent trailer, travel trailer, camping trailer, pickup camper, or motor home.”
    One more reviewed finding on this topic
  • county zoning authorityGeneral

    Virginia counties adopting and administering zoning ordinances over unincorporated territory statewide.

    • The zoning power is exercised by county governing bodies through ordinance.
    • County zoning jurisdiction covers unincorporated territory; incorporated areas are under municipal jurisdiction.
    • The statute permits regulation of land uses, structures, dimensional standards, open spaces, and excavation or mining, including residential and flood-plain uses.
    “For the purpose of zoning, the governing body of a county shall have jurisdiction over all the unincorporated territory in the county, and the governing body of a municipality shall have jurisdiction over the incorporated area of the municipality.”
  • county building authorityGeneral

    Virginia counties administering and enforcing the Uniform Statewide Building Code and issuing building permits for construction, including residential construction, in county jurisdiction.

    • Virginia's building code is a Uniform Statewide Building Code adopted by the State Board; it supersedes county building codes and regulations.
    • The county's role is local administration and enforcement through a local building department, not independent adoption of a conflicting county building code.
    • A county without a building department or local board of Building Code appeals must enter an agreement with another county, municipality, agency, or approved state agency for enforcement and appeals.
    • A town with a population of less than 3,500 may elect to administer and enforce the Building Code; if it does not, the county administers and enforces the Code for that town.
    • Buildings may be inspected before completion and are not deemed compliant until approved by the inspecting authority; inspections under $2,500 construction cost may be waived at the inspecting authority's discretion.
    • Building permit and enforcement fees may be levied by the local governing body.
    • Farm buildings and structures are exempt from the Building Code except for a farm building or portion operated as a licensed restaurant; farm buildings in flood plains or mudslide-prone areas remain subject to applicable flood-proofing or mudslide regulations.

    small-town population threshold: < 3500 people (The town may elect to administer and enforce the Building Code; otherwise the county administers it for the town.) · inspection-waiver construction cost threshold: < 2500 USD (The inspecting authority may waive inspection at its discretion.)

    “Enforcement of the provisions of the Building Code for construction and rehabilitation shall be the responsibility of the local building department. [...] Whenever a county or a municipality does not have such a building department or board of Building Code appeals, the local governing body shall enter into an agreement with the local governing body of another county or municipality or with some other agency, or a state agency approved by the Department for such enforcement and appeals resulting therefrom.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Minimum dwelling size — Minimum dwelling size under county zoning districts.
  • Lot coverage — Lot coverage under county zoning districts.
  • Building height — Building height under county zoning districts.
  • Living in an RV — Residential or long-term occupancy of recreational vehicles in Chesterfield County.
  • Camping on your land — Temporary camping on private property.
3 more unanswered
  • Tiny homes
  • Off-grid sanitation
  • Well permit

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Water rights & wells in Chesterfield County

Whether a new home can legally get its own water here — the sub-state groundwater regime, from Virginia’s water agency.

Over-appropriated / declining

The aquifer here is over-appropriated and declining. A domestic well is usually still permit-exempt, but long-term supply is a genuine risk.

Household wellExempt — no permit or water right

Household wells are exempt from the groundwater withdrawal permit even inside a Groundwater Management Area, but a private well in a GWMA must be registered with DEQ within 30 days (Va. Code 62.1-258); a permit is triggered only at 300,000 gal/month.

Limit: < 300,000 gal/month (no withdrawal permit)

Virginia DEQ — Ground Water Withdrawal Permitting ↗
  • Eastern Virginia Groundwater Management Areapartial of county

    DEQ has imposed mandatory withdrawal reductions on large Coastal Plain permittees because permitted demand exceeds sustainable aquifer yield (declining heads, land subsidence, saltwater-intrusion risk). Household wells (<300,000 gal/mo) are exempt but must be registered. The I-95-west counties (Fairfax, Chesterfield, Hanover, Henrico, Prince William, Spotsylvania, Stafford, Caroline) are included only east of I-95.

    Virginia DEQ / 9VAC25-600-20 ↗

Regulated-riparian state (large uses permitted). Groundwater rules change and basin boundaries follow the aquifer, not the county line — confirm current well and appropriation rules with the Virginia state water agency before you buy or drill.Groundwater governance as of Jul 2026, cited to each administering agency.

Living off-grid in Chesterfield County, Virginia

Is Chesterfield County a good place to live off-grid or homestead?

Chesterfield County scores 55/100 on the Bolthole Index, a solid county profile. Its strengths: mixed durability signals and strong self-sufficiency basics: 46.6″/yr rainfall plus 84.9% wooded land. Watch-outs: about 379,946 people within a 30-minute drive.

Do you need a building permit in Chesterfield County, Virginia?

Chesterfield County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by Virginia Department of Health (Chesterfield Health District). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Chesterfield County, Virginia?

Land in Chesterfield County runs about $8,136 per acre, based on the latest county data.

What is the water situation in Chesterfield County?

Chesterfield County gets about 46.6" of rain a year, with severe drought in roughly 1.3% of years. On water rights, Chesterfield County lies in the Eastern Virginia Groundwater Management Area — DEQ has imposed mandatory withdrawal reductions on large Coastal Plain permittees because permitted demand exceeds sustainable aquifer yield (declining heads, land subsidence, saltwater-intrusion risk). Household wells (<300,000 gal/mo) are exempt but must be registered. The I-95-west counties (Fairfax, Chesterfield, Hanover, Henrico, Prince William, Spotsylvania, Stafford, Caroline) are included only east of I-95..

How remote is Chesterfield County?

A representative private-land location has about 379,946 people within a 30-minute drive and 4,395,625 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Chesterfield compares in Virginia

Compare side-by-side →See all 133 Virginia counties ranked →