Mathews County, Virginia

Building permits, zoning and land rules in Mathews County, Virginia

65Index Score / 100
#61 of 133 in Virginia

Mathews County, Virginia requires a building permit before constructing, enlarging, altering, moving, renovating or demolishing a building, and separate trade permits may also be needed1. County zoning controls permissible uses and development density, while the Virginia Department of Health handles septic and private-well approvals234.

At a glance

Building permit
Required for new construction and many alterations; separate trade permits may apply1
Building code
2021 Virginia Uniform Statewide Building Code, effective January 18, 20245
Zoning
County zoning applies; permitted uses and density vary by district67
Septic and wells
VDH construction, inspection and operation approval required389
Owner-builder
Allowed conditionally with an Owner's Affidavit identifying the state-law exemption claimed10
RV / tiny home living
Rural-district travel-trailer habitation is temporary and needs a conditional-use permit; tiny houses have a state code path but remain subject to county zoning11126
Inspections
Required at each phase of permitted construction13
Private well
Apply through the local Health Department; inspection is required before use14

Who to call

Building permits

Mathews County Building Department

Building applications, plan review, permits, inspections, building-code questions and county floodplain administration

804-725-7171

Lgreve@mathewscountyva.gov

50 Brickbat Road, Suite 102, Mathews, VA 23109

Online permits →

Planning & zoning

Mathews County Planning, Zoning & Wetlands

Zoning, subdivisions, erosion and sediment rules, wetlands administration and long-range land-use planning

804-725-4034

P.O. Box 839, Mathews, VA 23109

Septic permits

Mathews County Health Department Environmental Health

Local Virginia Department of Health contact for environmental health, including onsite sewage and private-well questions

804-725-7131

536 Church Street, Mathews, VA 23109

Online permits →

Contact details are copied from each office’s official page and were checked against it on October 9, 2026.

Off-grid gear

Going off-grid in Mathews County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Mathews County, Virginia?

Yes. Mathews County requires a building permit before a person or company erects, constructs, enlarges, alters, moves, converts, renovates, remodels, rehabilitates or demolishes a building or structure1. Separate building, plumbing, electrical and mechanical permits are required when those trades are part of the work, and inspections are required for each phase of construction15. The Virginia Uniform Statewide Building Code applies to new construction, additions, maintenance, repairs, renovations and changes of use in Mathews County16. The published building schedule sets a $50 minimum permit fee and adds a 2% state education surcharge17. Ordinary repairs and other code exceptions can differ from regulated construction, so describe the exact scope of work to the Building Department before starting118. A certificate of occupancy is generally required before occupancy or a change of occupancy, with exceptions for an IRC accessory structure and certain additions19.

Who is the Mathews County building department, and how do you reach it?

The Mathews County Building Department accepts permit applications, reviews construction documents and plans, issues permits and performs inspections18. The department says the preferred application method is to complete the fillable forms on its Building Applications and Forms page and email them to Lgreve@mathewscountyva.gov18. The office is at 50 Brickbat Road, Suite 102, Mathews, Virginia, and its phone number is 804-725-717118. The same department administers the county Floodplain Management Ordinance and maintains the FEMA flood maps18. Any work or development in a special flood hazard area needs a signed Flood Zone Development Permit, and an existing structure needs a substantial-improvement determination20. Mathews County reviews the permit application and construction documents before issuing a permit, and the issued permit must be posted before inspections proceed21.

Does Mathews County have zoning?

Yes. Mathews County's Planning, Zoning & Wetlands office administers and enforces the Zoning Ordinance, Subdivision Ordinance, Erosion and Sediment Ordinance and wetlands program622. A parcel's zoning district controls which uses are allowed and its development density; changing the zoning-map designation can change both7. The office administers subdivision review, with fees of $100 plus $15 per lot for a minor subdivision and $500 plus $25 per lot for a major subdivision23. Major site-plan review costs $350, minor review costs $150, and the ordinance allows 60 days for site-plan review2425. A short-term vacation rental also requires a zoning permit and executed use agreement before renting26. We could not confirm one countywide numeric answer for minimum lot size, home size, setbacks, lot coverage or building height; ask Planning, Zoning & Wetlands for the parcel's district standards22.

How do septic and well permits work in Mathews County?

The Virginia Department of Health's Three Rivers Health District handles onsite sewage permits in Mathews County3. A construction permit authorizes a septic system at a specified location, remains valid for 18 months and does not transfer when ownership changes8. After a new system is installed and inspected, the Health Department must issue an operation permit before the local building official can issue a certificate of occupancy27. The Mathews County Health Department's Environmental Health line is 804-725-7131 at 536 Church Street in Mathews28. A private well requires a construction permit before drilling, must be safely separated from contamination sources, and costs $300; approval for use follows a local Health Department inspection, the driller's construction report and satisfactory bacteriological results for a drinking well14. Only 8.7% of county soils are rated without severe limitations for a conventional drain field, so settle septic feasibility before buying or siting a house29.

Can you live in an RV or tiny home on your land in Mathews County?

In Mathews County's Rural district, a licensed travel trailer outside a travel-trailer park may be occupied for temporary habitation only with a temporary conditional-use permit from the Board of Supervisors and a written promise to remove it by the permit deadline11. In a floodplain district, an RV using the temporary option must stay fewer than 180 consecutive days, remain fully licensed and ready for highway use; otherwise it must meet the applicable manufactured-home requirements30. Virginia's residential code provides an alternative code path for a qualifying tiny house with no more than 400 square feet of floor area, but county zoning, septic and floodplain rules still apply126. We could not confirm a county rule expressly authorizing residential occupancy of tiny homes. Ask Planning, Zoning & Wetlands about the parcel and proposal before buying22.

Building a home in Mathews County: the steps, in order

  1. Ask Planning, Zoning & Wetlands to confirm the parcel's zoning district, permitted residential use and dimensional standards622.
  1. Obtain the VDH septic construction permit and private-well construction permit before installing either system814. If the project is in the sanitary sewer district, submit HRSD approval or verification31.
  1. Obtain a signed Flood Zone Development Permit if the project lies in a special flood hazard area20.
  1. If the driveway connects to a VDOT-maintained highway, obtain the required VDOT entrance permit before constructing or modifying it32.
  1. Submit the building application and construction documents; separate trade permits may be required2115.
  1. Post the permit and request inspections before covering each phase2115.
  1. Secure septic operation and well approvals, then pass the final building inspection271413. Obtain the certificate of occupancy before using the home; a new dwelling requires approved water and sewage documentation, and a home in a special flood hazard area requires a compliant elevation certificate19.

What should you check before buying land in Mathews County?

Confirm the parcel's zoning district, allowed use and subdivision history before relying on a listing description723. Check flood status with the Building Department, because any work or development in a special flood hazard area requires a Flood Zone Development Permit1820. Confirm whether the parcel lies in the sanitary sewer district, where a building project must submit HRSD approval or verification; the available rule does not establish a universal connection requirement31. Settle septic feasibility before closing: only 8.7% of county soils are rated without severe limitations for a conventional drain field, and a septic construction permit expires after 18 months and does not transfer to a new owner298. The landscape is mostly gentle, with 99.3% at a 15% slope or less, but that does not remove septic or flood constraints332920. Typical property tax is about 0.4% effectively, with a median annual bill near $1,4753435.

Watch-outs

  • A septic construction permit is valid for 18 months and does not transfer when the property changes hands8.
  • An owner may act as their own contractor only conditionally: Mathews County requires an Owner's Affidavit identifying the exemption claimed under state law10.
  • Rural-district travel-trailer habitation needs a temporary conditional-use permit, and floodplain districts impose separate RV placement limits1130.
  • Virginia provides a building-code path for qualifying tiny houses, but county zoning still controls parcel eligibility; minimum dwelling size and district-specific setbacks remain unconfirmed, so ask Planning, Zoning & Wetlands about the exact parcel and proposal12622.

Sources

  1. Building Permit Fees, quoted and re-checked
  2. mathewscountyva.gov, quoted and re-checked
  3. Environmental Health Services - Three Rivers Health District, quoted and re-checked
  4. Private Well Program, quoted and re-checked
  5. Building Official, quoted and re-checked
  6. Planning, Zoning & Wetlands, quoted and re-checked
  7. Planning Commission, quoted and re-checked
  8. Environmental Health Services - Three Rivers Health District, quoted and re-checked
  9. Environmental Health Services - Three Rivers Health District, quoted and re-checked
  10. The Permit Process - A Guide to Permitting, quoted and re-checked
  11. Article 5: Rural District (RU), quoted and re-checked
  12. 13VAC5-63-210. Chapter 3 Use and occupancy classification, quoted and re-checked
  13. mathewscountyva.gov, quoted and re-checked
  14. Environmental Health Services - Three Rivers Health District, quoted and re-checked
  15. Building Permit Fees, quoted and re-checked
  16. Virginia Uniform Statewide Building Code (USBC), quoted and re-checked
  17. Building Permit Fees, quoted and re-checked
  18. Mathews County Building Department (mathewscountyva.gov)
  19. Certificate of Occupancy Guidelines, quoted and re-checked
  20. The Permit Process - A Guide to Permitting, quoted and re-checked
  21. The Permit Process - A Guide to Permitting, quoted and re-checked
  22. Mathews County Planning, Zoning & Wetlands (mathewscountyva.gov)
  23. Planning, Zoning & Wetlands, quoted and re-checked
  24. Planning & Zoning Fees, quoted and re-checked
  25. Site Plan Application, quoted and re-checked
  26. Short-Term Vacation Rental Policy, Rules & Regulations, quoted and re-checked
  27. Environmental Health Services - Three Rivers Health District, quoted and re-checked
  28. Mathews County Health Department Environmental Health (vdh.virginia.gov)
  29. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  30. Article IV: District Provisions - Mathews County, VA, quoted and re-checked
  31. The Permit Process - A Guide to Permitting, quoted and re-checked
  32. Land use permits (Virginia statewide rule), quoted and re-checked
  33. Share of land at 15% slope or less: Bolthole Index county data
  34. Effective property tax rate: Bolthole Index county data
  35. Median property tax bill: Bolthole Index county data

Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Mathews County requires a building permit for a home.

RuleMathews CountyGloucester CountyYork CountyLancaster CountyPoquoson CityMiddlesex CountyWilliamsburg City
Building permitRequiredRequiredRequiredRequiredRequiredRequiredRequired
County zoningYesYesYesYesYesYesYes
Septic permitsVA Dept. of HealthVA Dept. of HealthVA Dept. of HealthVA Dept. of HealthVA Dept. of HealthVDHVA Dept. of Health

County locator

Mathews County in Virginia

65
County map
Mathews County highlighted among the Virginia counties · colored by Index score

How Mathews County scores

Seclusion40100% ev.
Self-Sufficiency6997% ev.
Admin Boringness3990% ev.
Durability71100% ev.
Property Autonomy66100% ev.
Carry Cost70100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$358kTypical home
0.4%Property tax
$6,440Land / acre
48.1"Annual rain
1.1% of yrsSevere drought
2.7 / yr (+2.5)Mid-century 100°F days
12.8 daysMid-century dry spell
2.36" (+7.6%)Mid-century 1-day rain
1.39×Wildfire change factor
100%Forward climate coverage
$2,021Home insurance / yr
1.9% / yrInsurance growth
1.43%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
40,286People within 30 min
3,390,414People within 2 hr
36,977Radius comparison (15 mi)
99.1People / sq mi
0%Federal land
99.3%Land at 15% slope or less
8.7%Soils rated "not limited" for septic (strict USDA rating)
2,692 acWorkable land screen
54.8%Wooded land
92 tonsBiomass / forest ac
59.2°FAvg temp

Scout Mathews County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Mathews County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Answers from the rulebook for Mathews County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Mathews County rules

  • Building permitRequired

    Building and structure construction, enlargement, alteration, movement, conversion, renovation, remodeling, rehabilitation, or demolition in Mathews County.

    • Certain work, including ordinary repairs, may not require a permit; the county advises contacting the Building Department to confirm.
    • Separate permits are required for building, plumbing, electrical, and mechanical work.
    • Work in a flood zone requires a flood-zone development permit.

    minimum permit fee: 50 USD (for any permit)

    “Any person, firm or corporation shall not erect, construct, enlarge, alter, move, convert, renovate, remodel, rehabilitate or demolish any building or structure, or cause the same to be done, without first obtaining a building permit for such building.”
  • Building code adoptedAdopted (with conditions)

    Building construction regulated by the Virginia Uniform Statewide Building Code in Mathews County.

    • The county Building Department states that the 2021 Virginia USBC is effective 1/18/2024.
    • The USBC regulates new construction, alteration, rehabilitation, renovation, and movement of buildings, accessory structures, and equipment.

    code effective date: 2024-01-18

    “2021 Code Effective 1/18/2024 Virginia USBC”
  • InspectionsRequired

    Construction performed under a Mathews County building permit.

    • A final inspection is conducted after permitted construction is completed.
    • The building official may require electrical service to be energized before the final inspection.
    “Upon completion of construction for which a permit was issued, a final inspection shall be conducted”
    One more reviewed finding on this topic
    • Required — Permitted construction and each applicable phase of construction.
      “Separate permits are required for building, plumbing, electrical and mechanical work. Inspections are required for each phase of construction.”
  • Certificate of occupancyRequired

    Occupancy or change of occupancy of buildings and structures in Mathews County.

    • A certificate of occupancy is issued within five working days after approval of the final inspection when the building is determined compliant.
    • A certificate of occupancy is not required for an IRC accessory structure.
    • A new certificate is not required for an addition to an existing Group R-5 building that already has a certificate.
    • For a new dwelling, including manufactured homes, or new commercial building, all work must be complete and a final inspection performed.
    • Approved Virginia Department of Health water-supply and sewage-disposal documentation is required.
    • In an SFHA flood zone, an elevation certificate showing compliance with the USBC and Mathews County Floodplain Management Ordinance is required.

    issuance period: 5 working days (after final-inspection approval)

    “Prior to occupancy or change of occupancy of a building or structure, a certificate of occupancy shall be obtained in accordance with this section.”
    One more reviewed finding on this topic
    • Required — Occupancy or change of occupancy of buildings and structures in Mathews County.
      “Prior to occupancy or change of occupancy of a building or structure, a certificate of occupancy shall be obtained in accordance with this section.”
  • County-wide zoningPresent (with conditions)

    Countywide zoning ordinance administered by Mathews County.

    • The county states that it has adopted a zoning ordinance.
    • Specific use, dimensional, and overlay requirements depend on the applicable zoning district and ordinance provisions.
    “The county has adopted a comprehensive plan, as well as zoning and subdivision ordinances.”
  • Local zoningPresent (with conditions)

    Mathews County local zoning regulation in the county jurisdiction.

    • The county Planning, Zoning and Wetlands Office administers and enforces the county Zoning Ordinance.
    • The Board of Zoning Appeals hears variances and may review Zoning Administrator decisions.
    “Administration and enforcement of the Erosion and Sediment Ordinance, Subdivision Ordinance, Zoning Ordinance, and Wetlands Administration”
    One more reviewed finding on this topic
    • Present — Mathews County zoning administered by the county Planning, Zoning and Wetlands Office.
      “Administration and enforcement of the Erosion and Sediment Ordinance, Subdivision Ordinance, Zoning Ordinance, and Wetlands Administration”
  • Zoning districtsPartial

    Mathews County zoning districts and official zoning-map administration.

    • The official county pages establish that zoning districts and a zoning map are used, but this research did not extract the complete current district schedule or map contents.
    “Zoning Map Amendments (rezonings) are changes to the zoning district map of the County. Changing the zoning district in which a parcel lies changes what uses can and cannot be conducted on that parcel and the development density of the parcel.”
  • Living in an RVTemporary only (with conditions)

    Placement of recreational vehicles on sites within Mathews County floodplain districts.

    • The rule applies within floodplain districts.
    • The recreational vehicle may remain on the site for fewer than 180 consecutive days only if it is fully licensed and ready for highway use.
    • Ready for highway use means it is on its wheels or jacking system, attached only by quick-disconnect-type utilities and security devices, and has no permanently attached additions.
    • Alternatively, the recreational vehicle must meet all requirements for manufactured homes in Article IV, § 63-18D and, if in the VE Zone, Article III, § 65-15C(4).
    • Floodplain development requires a building and/or zoning permit and compliance with applicable state and federal laws.

    maximum site duration under temporary option: < 180 consecutive days

    “Be on the site for fewer than 180 consecutive days, be fully licensed and ready for highway use [...] or Meet all the requirements for manufactured homes”
    One more reviewed finding on this topic
    • Temporary only (with conditions) — Licensed travel trailers outside travel-trailer parks in the Rural (RU) zoning district when occupied for temporary habitation other than the temporary-residence exception in § 175-15.3(B).
      “Travel trailers (licensed), located outside of travel trailer parks, which are to be occupied for habitation on a temporary basis, other than allowed by § 175-15.3B if the Board of Supervisors grants a temporary conditional use permit and if the applicant agrees in writing to remove the travel trailer on or before the period specified in the permit.”
  • Who permits septicState (with conditions)

    Onsite sewage permitting and operation approval for Mathews County through the Three Rivers Health District and Virginia Department of Health.

    • Construction permits authorize a system at a certain location.
    • The operation permit follows installation and inspection and is needed for a Certificate of Occupancy.

    construction permit validity: 18 months (does not transfer with a change of property ownership)

    “After your system is installed and inspected, you will need an Operation Permit from the Health Department to receive a Certificate of Occupancy from the local building official.”
  • Septic permitRequired

    Construction of an onsite sewage system serving property in Mathews County.

    • A construction permit authorizes construction at a specified location.
    • An operation permit is required after installation and inspection for a Certificate of Occupancy.
    • A county planning and zoning fee schedule separately lists a $25 septic permit fee; the state health-district permit remains the construction authorization.

    county septic permit fee: 25 USD (listed on the county Planning & Zoning Fees page) · construction permit validity: 18 months (does not transfer with a change of property ownership)

    “Construction Permits authorize the construction of a sewage disposal system in a certain location. They are valid for 18 months, and do not transfer with a change of property ownership.”
  • Septic inspectionRequired

    A newly constructed onsite sewage disposal system in Mathews County within the Three Rivers Health District.

    • Inspection follows installation of the sewage disposal system.
    • An Operation Permit is needed from the Health Department to obtain a Certificate of Occupancy from the local building official.
    • The source does not establish that a construction inspection is required for every existing-system review or every building project.

    construction permit validity: 18 months (Does not transfer with a change of property ownership)

    “After your system is installed and inspected, you will need an Operation Permit from the Health Department”
    One more reviewed finding on this topic
    • Required — Installed onsite sewage systems in Mathews County.
      “After your system is installed and inspected, you will need an Operation Permit from the Health Department to receive a Certificate of Occupancy from the local building official.”
  • Well permitRequired

    Private wells, including household, groundwater-source heat-pump, agricultural, industrial, and other nonpublic water wells in Mathews County within the Three Rivers Health District.

    • A private-well construction permit is required before construction.
    • The well must be located in a permitted area safely away from potential contamination sources.
    • Before approval for use, the local Health Department must inspect the well, receive the Well Driller’s Construction Report/GW-2, and, for drinking wells, receive satisfactory bacteriological water-sample results.
    • The source states a $300 well-permit fee; replacement-well applicants may receive a refund when the well driller’s report for abandoning the older well is received.

    well permit fee: 300 USD (Replacement-well refund available when the well driller’s report for abandoning the older well is received)

    “They can only be drilled in permitted areas located safely away from potential sources of contamination.”
  • Mandatory utility hookupConditional

    Building projects in Mathews County that are located in the sanitary sewer district or otherwise require utility approval.

    • If the project is in the sanitary sewer district, HRSD approval or verification must be submitted.
    • The source does not establish a universal countywide water or sewer connection requirement.
    “If the project is in the sanitary sewer district, HRSD approval or verification will need to be submitted.”
  • Subdividing landRegulated (with conditions)

    Subdivision activity administered under the Mathews County Subdivision Ordinance.

    • The county Planning, Zoning and Wetlands Office administers and enforces the Subdivision Ordinance.
    • Specific subdivision fees are published: minor subdivisions $100 plus $15 per lot; major subdivisions $500 plus $25 per lot.

    minor subdivision fee: $100 plus $15 per lot USD · major subdivision fee: $500 plus $25 per lot USD

    “Administration and enforcement of the Erosion and Sediment Ordinance, Subdivision Ordinance, Zoning Ordinance, and Wetlands Administration”
    One more reviewed finding on this topic
    • Regulated (with conditions) — Subdivision activity in Mathews County.
      “Administration and enforcement of the Erosion and Sediment Ordinance, Subdivision Ordinance, Zoning Ordinance, and Wetlands Administration”
  • Building in a floodplainRequired

    Any work or development in a Special Flood Hazard Area/flood zone in Mathews County.

    • A Flood Zone Development Permit must be completed and signed.
    • Existing buildings and structures must undergo a substantial-improvement determination.
    • The county states that any and all work in a flood zone must be permitted.
    • Current county FIRMs have an effective date of December 9, 2014 and are based on the 1988 NAVD.
    • The county identifies A, AE, Coastal A, and VE zones as Special Flood Hazard Areas.

    current FIRM effective date: 2014-12-09 · FIRM vertical datum: 1988 NAVD

    “If the property or project is located in a flood zone (SFHA) a Flood Zone Development Permit must be completed and signed.”
    One more reviewed finding on this topic
    • Required — Development and construction subject to the Mathews County Floodplain Management Ordinance.
      “If the property or project is located in a flood zone (SFHA) a Flood Zone Development Permit must be completed and signed.”
  • Short-term rentalsLimited

    Short-term vacation rentals in Mathews County; the official policy defines an STVR as a compensated dwelling rental for lodging not exceeding 30 consecutive days.

    • A zoning permit and executed short-term vacation rental use agreement are required before renting.
    • The application identifies a $25 fee.
    • Transient guests may not exceed two persons per bedroom plus two additional persons for each dwelling, subject to building-code and health-department compliance.
    • The owner must designate an STVR agent able to respond within two hours; the owner may serve as agent.
    • No exterior appearance change may alter the dwelling's essential character.
    • The use may not create nuisance noise, glare, fumes, traffic, or fire hazards.
    • Off-street parking must comply with Article 12; guest vehicles, boats, or trailers may not block property access in a right-of-way.
    • County, state, and federal enforcement remains applicable.

    maximum rental period: <= 30 consecutive days · application fee: 25 USD · guest limit: 2 persons per bedroom plus 2 additional persons per dwelling (subject to building-code and health-department compliance) · agent response time: <= 2 hours

    “No person shall rent, lease, or otherwise exchange for compensation all or any portion of a dwelling unit as a short-term vacation rental without first obtaining a zoning permit and executing a short-term vacation rental use agreement.”
  • Permit feesPublished (with conditions)

    Published Mathews County planning and zoning fees.

    • Fees may differ for major and minor reviews and after-the-fact applications.
    • The published schedule includes zoning, site-plan, subdivision, septic, land-disturbing, variance, rezoning, and conditional-use fees.

    site plan review major: 350 USD · site plan review minor: 150 USD · septic permit: 25 USD · zoning permit for construction or business license: 50 USD (After the Fact - $150)

    “Septic Permit | $25 Site Plan Review | Major $350; Minor $150”
    One more reviewed finding on this topic
    • Published (with conditions) — Mathews County building, planning, zoning, subdivision, and related permit fees.
      “State of Virginia education surcharge is 2% of total permit fee (for each permit). Minimum fee for any permit: $50.00”
  • Permit processPublished (with conditions)

    Mathews County construction permitting process.

    • Obtain zoning approval or exemption if required.
    • Flood-zone development permitting is required for applicable work.
    • Submit applications and construction documents; after issuance, post the permit and request required inspections before work proceeds.
    • Virginia Department of Health well/septic approval is required before final inspection where applicable.
    • A Certificate of Occupancy is issued after final inspection and completion of the required steps.
    “After the Permit Application(s) and Construction Documents are received, they will be reviewed and a Permit will be issued (if the application and Construction Documents meet the requirements of the Uniform Statewide Building Code and the Mathews County Floodplain Management Ordinance).”
    One more reviewed finding on this topic
    • Published (with conditions) — Mathews County site-plan and building-permit processes.
      “The Mathews County Zoning Ordinance allows 60 days for review of this permit (Sect. 175-22.39)”

Virginia rules that apply here

  • Owner-builder exemptionConditional

    A person performing or supervising construction, removal, repair, or improvement of one primary residence owned by that person and for that person's own use, for contractor-licensing purposes.

    • The exemption is limited to no more than one primary residence owned by the person and for the person's own use during any 24-month period.
    • The exemption from contractor licensing does not exempt the work from the Virginia Uniform Statewide Building Code.
    • If the person is exempt under subdivision A 7 and conveys the property to a third-party purchaser, the person must obtain a certificate of occupancy before conveyance unless the purchaser acknowledges in writing that no certificate of occupancy has been issued and consents to acquire the property without one.
    • The exemption concerns Chapter 11 contractor licensing; applicable building permits and inspections remain governed by the Uniform Statewide Building Code.

    primary residences per 24-month period: <= 1 residence (residence must be owned by the person and for the person's own use)

    “Any person who performs or supervises the construction, removal, repair, or improvement of no more than one primary residence owned by him and for his own use during any 24-month period;”
    One more reviewed finding on this topic
    • Conditional — Owners performing work themselves or acting as their own contractor for construction requiring a county permit.
      “If an owner wishes to perform the work themselves or act as their own contractor, they must sign an Owner’s Affidavit (which can also be found on the website) and indicate what exemption they are claiming under state law.”
  • Tiny homesAllowed (with conditions)

    A dwelling qualifying as a Virginia-code tiny house and constructed under the Virginia Residential Code in Mathews County.

    • Appendix AQ is an alternative to the requirements of the Virginia code; the dwelling must be 400 square feet or less in floor area.
    • The statewide building code applies to construction, and local building inspections departments enforce it.
    • This state building-code claim does not resolve Mathews County zoning, lot, setback, septic, floodplain, or other land-use requirements.

    maximum floor area: <= 400 square feet (Appendix AQ alternative applies where the dwelling is 400 square feet or less)

    “R336.1 General. Appendix AQ may be used as an alternative to the requirements of this code where a dwelling is 400 square feet (37 m2) or less in floor area.”
  • Manufactured homesLimited

    Placement and occupancy of manufactured homes in Virginia localities that adopt and enforce zoning ordinances.

    • In agricultural zoning districts, or similarly classified districts where agricultural, horticultural, or forest uses are dominant and site-built housing is allowed, placement of manufactured homes must be permitted.
    • In other zoning districts where site-built housing is allowed, the manufactured home must be converted to real property under § 46.2-653.1, have its certificate of occupancy issued within five years following the manufacture date on the data plate, and be placed on an individual lot.
    • Localities may adopt uniform standards applying to all residential structures in the zoning district, but those standards may not exclude manufactured housing compliant with the Virginia Manufactured Housing Construction and Safety Standards Law.
    • Restrictive covenants may continue to impose obligations.
    • Local zoning and land-use controls that do not affect construction or installation remain in force; site preparation, utility connections, skirting, and maintenance must meet the Uniform Statewide Building Code.

    certificate of occupancy deadline from manufacture date: <= 5 years (date listed on the home's data plate) · placement requirement: individual lots

    “the placement of manufactured homes shall be permitted for manufactured homes that are (i) converted to real property in accordance with § 46.2-653.1”
  • Accessory dwellingsAllowed (with conditions)

    Accessory dwelling units on residential dwelling lots in single-family residential zoning districts, under Virginia Code § 15.2-2292.4 effective July 1, 2027.

    • The ADU must be attached or detached, provide complete independent living facilities, be on the same lot as a proposed or existing primary residence, and include facilities for living, sleeping, eating, cooking, and sanitation.
    • The locality must treat ADUs as a permitted accessory use in single-family residential zoning districts, subject to the statute's listed exceptions and conditions.
    • An applicant must first obtain an ADU permit from the locality; the locality may charge no more than $500 for that permit, in addition to applicable inspection, site, or building permit fees.
    • Localities may require a rental lease term of at least 30 consecutive days; replacement or dedicated parking; floor-area, lot-coverage, and impervious-area limits of at least 350 square feet on lots under 2,500 square feet and at least 500 square feet on lots of 2,500 square feet or greater; building-code, water, sewer, septic, emergency-access, flood-zone, stormwater, historic-district, corridor-protection, and Air Installations Compatible Use Zone compliance; owner occupancy of either the ADU or primary dwelling at application; an ADU no more than 500 feet from the primary dwelling; no ADU on a residential lot with more than one dwelling unit; and no separate sale or subdivision from the primary dwelling.
    • Localities may not require rear or side setbacks greater than those applicable to the primary dwelling or accessory structures, more restrictive ADU restrictions regarding height, rear or side setbacks, lot size or coverage, or building frontage than for single-family dwellings in the same zoning area, restrictive covenants concerning an ADU on a qualifying lot, public-street improvements except for repair or reconstruction of construction-related disturbance, or consanguinity or affinity between occupants.
    • The statute does not supersede private contracts, recorded declarations, condominium instruments, common-interest-community declarations, cooperative instruments, or property-owners'-association declarations.
    • The statute does not apply to existing ADU permits approved before July 1, 2027.
    • The statute does not restrict a locality from passing before July 1, 2027, an ADU ordinance or amendment that substantially complies with the statute.
    • The statute does not apply to a locality that adopted an ADU ordinance before January 1, 2026.

    ADU permit fee maximum: <= 500 USD (Additional inspection, site, or building permit fees may apply.) · minimum floor-area limit on lots under 2,500 square feet: >= 350 square feet (Locality may impose limits on floor area, lot coverage, and impervious area.) · minimum floor-area limit on lots of at least 2,500 square feet: >= 500 square feet (Locality may impose limits on floor area, lot coverage, and impervious area.) · maximum ADU distance from primary dwelling: <= 500 feet (A locality may require this limit.) · effective date: 2027-07-01

    “§ 15.2-2292.4. (Effective July 1, 2027) Development and use of accessory dwelling units. [...] Zoning ordinances for single-family residential zoning districts shall be deemed to include accessory dwelling units as a permitted accessory use, and no locality shall require compliance with any other requirements except as provided in this section.”
  • Agricultural exemptionConditional

    Farm buildings and structures under the Virginia Uniform Statewide Building Code.

    • A farm building or structure is not used for residential purposes, is located on property where farming operations take place, and is used primarily for a listed farm use.
    • The exemption does not apply to a building or portion of a building on a farm that is operated as a restaurant and licensed by the Board of Health under Chapter 2 (§ 35.1-11 et seq.) of Title 35.1.
    • Farm buildings and structures in a flood plain or mudslide-prone area remain subject to applicable flood-proofing or mudslide regulations.
    • A qualifying agritourism farm building or structure where the public is invited to enter and which is used for display, sampling, or sale described in § 36-99 must have portable fire extinguishers, a simple written emergency plan, and the required exemption sign.
    “Notwithstanding the provisions of this section, farm buildings and structures shall be exempt from the provisions of the Building Code, except for a building or a portion of a building located on a farm that is operated as a restaurant as defined in § 35.1-1 and licensed as such by the Board of Health pursuant to Chapter 2 (§ 35.1-11 et seq.) of Title 35.1.”
  • Driveway accessRequired

    Construction or modification of entrances connecting to VDOT-maintained highways and activities in VDOT highway right-of-way.

    • The requirement applies to state-maintained highways and right-of-way under VDOT jurisdiction.
    • Entrance location and design must comply with VDOT access-management regulations and design standards.
    • Applications are typically obtained through the VDOT district or residency office serving the locality.
    • An existing entrance also requires a land-use permit when modified because of a change in land use, traffic volume, or type of traffic.
    “Anyone who plans to work or perform an activity on or crossing any right of way under the jurisdiction of the Department must first obtain a land use permit. These include activities such as installation of utilities, construction of private and commercial entrances, landscaping, the temporary use of the right-of-way, as well as numerous other types of activities.”
  • Campground & park staysLimited

    Recreational vehicles and other camping units offered as campsites in Virginia campgrounds, including facilities with three or more campsites and travel-trailer camps; this claim does not establish a general residential right to occupy an RV outside the specified campground framework.

    • A campground includes land or facilities accommodating camping units for periods of overnight or longer and includes travel trailer camps.
    • A campground must be permitted by the Virginia Department of Health and is inspected annually by local health department staff.
    • Offering three or more campsites may require a campground permit, including short-term or online-advertised camping.
    • Temporary campground permits allow up to 14 days of temporary camping, consecutively or nonconsecutively, within a 60-day period.
    • Temporary campgrounds must provide at least one portable toilet per 75 campers, make sewage-tank pumping available when RVs are present, and provide an acceptable water source.
    • The statutory definition excludes property where an individual owner may choose to camp, provided the owner is not prohibited or encumbered by covenants, restrictions, or conditions from providing sanitary facilities within the owner's property lines.
    • Other exclusions include summer camps, migrant labor camps, parks for manufactured homes, construction camps, and storage areas for unoccupied camping units.

    minimum campsites for campground definition: >= 3 campsites (The individual-owner camping exception and other statutory exclusions apply.) · temporary campground permit duration: <= 14 days (In a 60-day period, consecutively or nonconsecutively.) · temporary campground permit period: 60 days · portable toilets: per 1 per 75 campers (Temporary campgrounds.)

    “"Campground" means any area, place, parcel, or tract of land, by whatever name called, on which three or more campsites are occupied or intended for occupancy, or facilities are established or maintained, wholly or in part, for the accommodation of camping units for periods of overnight or longer [...] "Camping unit" means any device or vehicular type structure for use as temporary living quarters or shelter during periods of recreation, vacation, leisure time, or travel, including any tent, tent trailer, travel trailer, camping trailer, pickup camper, or motor home.”
    One more reviewed finding on this topic
  • county zoning authorityGeneral

    Virginia counties adopting and administering zoning ordinances over unincorporated territory statewide.

    • The zoning power is exercised by county governing bodies through ordinance.
    • County zoning jurisdiction covers unincorporated territory; incorporated areas are under municipal jurisdiction.
    • The statute permits regulation of land uses, structures, dimensional standards, open spaces, and excavation or mining, including residential and flood-plain uses.
    “For the purpose of zoning, the governing body of a county shall have jurisdiction over all the unincorporated territory in the county, and the governing body of a municipality shall have jurisdiction over the incorporated area of the municipality.”
  • county building authorityGeneral

    Virginia counties administering and enforcing the Uniform Statewide Building Code and issuing building permits for construction, including residential construction, in county jurisdiction.

    • Virginia's building code is a Uniform Statewide Building Code adopted by the State Board; it supersedes county building codes and regulations.
    • The county's role is local administration and enforcement through a local building department, not independent adoption of a conflicting county building code.
    • A county without a building department or local board of Building Code appeals must enter an agreement with another county, municipality, agency, or approved state agency for enforcement and appeals.
    • A town with a population of less than 3,500 may elect to administer and enforce the Building Code; if it does not, the county administers and enforces the Code for that town.
    • Buildings may be inspected before completion and are not deemed compliant until approved by the inspecting authority; inspections under $2,500 construction cost may be waived at the inspecting authority's discretion.
    • Building permit and enforcement fees may be levied by the local governing body.
    • Farm buildings and structures are exempt from the Building Code except for a farm building or portion operated as a licensed restaurant; farm buildings in flood plains or mudslide-prone areas remain subject to applicable flood-proofing or mudslide regulations.

    small-town population threshold: < 3500 people (The town may elect to administer and enforce the Building Code; otherwise the county administers it for the town.) · inspection-waiver construction cost threshold: < 2500 USD (The inspecting authority may waive inspection at its discretion.)

    “Enforcement of the provisions of the Building Code for construction and rehabilitation shall be the responsibility of the local building department. [...] Whenever a county or a municipality does not have such a building department or board of Building Code appeals, the local governing body shall enter into an agreement with the local governing body of another county or municipality or with some other agency, or a state agency approved by the Department for such enforcement and appeals resulting therefrom.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Minimum dwelling size — Minimum total floor area for dwellings in Mathews County.
  • Minimum lot size — Minimum lot size requirements in Mathews County.
  • Setbacks — Building and structure setbacks in Mathews County.
  • Lot coverage — Lot coverage limits in Mathews County zoning districts.
  • Building height — Building-height limits in Mathews County zoning districts.
2 more unanswered
  • Camping on your land
  • Off-grid sanitation

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Water rights & wells in Mathews County

Whether a new home can legally get its own water here — the sub-state groundwater regime, from Virginia’s water agency.

Over-appropriated / declining

The aquifer here is over-appropriated and declining. A domestic well is usually still permit-exempt, but long-term supply is a genuine risk.

Household wellExempt — no permit or water right

Household wells are exempt from the groundwater withdrawal permit even inside a Groundwater Management Area, but a private well in a GWMA must be registered with DEQ within 30 days (Va. Code 62.1-258); a permit is triggered only at 300,000 gal/month.

Limit: < 300,000 gal/month (no withdrawal permit)

Virginia DEQ — Ground Water Withdrawal Permitting ↗
  • Eastern Virginia Groundwater Management Areapartial of county

    DEQ has imposed mandatory withdrawal reductions on large Coastal Plain permittees because permitted demand exceeds sustainable aquifer yield (declining heads, land subsidence, saltwater-intrusion risk). Household wells (<300,000 gal/mo) are exempt but must be registered. The I-95-west counties (Fairfax, Chesterfield, Hanover, Henrico, Prince William, Spotsylvania, Stafford, Caroline) are included only east of I-95.

    Virginia DEQ / 9VAC25-600-20 ↗

Regulated-riparian state (large uses permitted). Groundwater rules change and basin boundaries follow the aquifer, not the county line — confirm current well and appropriation rules with the Virginia state water agency before you buy or drill.Groundwater governance as of Jul 2026, cited to each administering agency.

Living off-grid in Mathews County, Virginia

Is Mathews County a good place to live off-grid or homestead?

Mathews County scores 65/100 on the Bolthole Index, a strong county profile. Its strengths: mixed durability signals and manageable long-term carry cost. Watch-outs: more administrative friction around building and land use and about 40,286 people within a 30-minute drive.

Do you need a building permit in Mathews County, Virginia?

Mathews County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by Virginia Department of Health (Three Rivers Health District). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Mathews County, Virginia?

Land in Mathews County runs about $6,440 per acre, based on the latest county data.

What is the water situation in Mathews County?

Mathews County gets about 48.1" of rain a year, with severe drought in roughly 1.1% of years. On water rights, Mathews County lies in the Eastern Virginia Groundwater Management Area — DEQ has imposed mandatory withdrawal reductions on large Coastal Plain permittees because permitted demand exceeds sustainable aquifer yield (declining heads, land subsidence, saltwater-intrusion risk). Household wells (<300,000 gal/mo) are exempt but must be registered. The I-95-west counties (Fairfax, Chesterfield, Hanover, Henrico, Prince William, Spotsylvania, Stafford, Caroline) are included only east of I-95..

How remote is Mathews County?

A representative private-land location has about 40,286 people within a 30-minute drive and 3,390,414 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Mathews compares in Virginia

Compare side-by-side →See all 133 Virginia counties ranked →