Bolthole Index

Spokane County, Washington

Building permits, zoning and septic rules in Spokane County, Washington

64Index Score / 100
#8 of 39 in Washington

Unincorporated Spokane County, Washington requires residential building permits, with an exemption for single-story tool or storage sheds under 200 square feet1. Spokane County Building & Planning administers county zoning outside incorporated cities2. Spokane Regional Health District issues septic permits for new or changed systems using less than 3,500 gallons per day3.

At a glance

Building permit
Required for residential construction; single-story tool or storage sheds under 200 square feet are exempt1
Zoning
Spokane County's zoning code applies in unincorporated areas; standards vary by district and use4
Septic permits
Spokane Regional Health District permits and inspects systems below 3,500 gallons per day53
Owner-builder exemption
Available from contractor registration for work on your own property, except work done to sell, demolish, or lease it; permits still apply6
RV living
An RV occupied continuously for more than 30 days must meet manufactured-home or commercial-coach requirements7
Tiny home
Allowed up to 400 square feet if built to the Washington State Building Code, with local approval depending on where it's placed8
Minimum dwelling size
190 square feet of habitable space minimum, with at least one room of 120 square feet or more9
Private well
Some small-quantity uses are exempt from a water-right permit, but even an exempt well requires a notice of intent10

Who to call

Building permits

Spokane County Building & Planning Department

Building permits, plan review, zoning administration, and long-range planning for unincorporated Spokane County

509-477-3675

1026 W Broadway Avenue, 1st Floor, Spokane, WA 99260

Also useful

Spokane County Building & Planning - Frequently Asked Questions

Published answers from Building & Planning on which codes apply, permit expiration, extensions, online service area, and design criteria such as snow load

Online permits →

Septic permits

Spokane Regional Health District (SRHD) - On-Site Sewage (Septic) Systems

On-site sewage (septic) system permits, design review, and inspections for Spokane County

509.324.1560 ext. 1

1101 W. College Ave., Spokane, WA 99201

Contact details are copied from each office’s official page and were checked against it on October 12, 2026.

Off-grid gear

Going off-grid in Spokane County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Spokane County, Washington?

Unincorporated Spokane County requires a building permit before constructing a new residential structure or enlarging, remodeling, relocating, or demolishing an existing one1. A single-story residential tool or storage shed under 200 square feet is exempt1. Spokane County lists the 2021 International Building and Residential Codes, subject to state and county modifications, alongside the other adopted construction codes and Washington State Energy Code1112. Washington's state building code applies except where state law provides otherwise13. An owner working on their own property may qualify for a contractor-registration exemption, except for work done to sell, demolish, or lease the property; building and other permits still apply6. Washington's exemption for certain agricultural work likewise concerns contractor registration, not a general exemption from county building or land-use rules14.

Who is the Spokane County building department, and how do you reach them?

The Spokane County Building & Planning Department evaluates and issues land-use and building permit applications and enforces site-development regulations governing building use and occupancy15. The office is at 1026 W Broadway Avenue, 1st Floor, Spokane, WA 99260, and the phone line is 509-477-367516. The county accepts online building-permit applications for unincorporated Spokane County, Millwood, Rockford, and Spangle17. Cheney and Medical Lake issue city building permits; Millwood also requires written city permission for the building work and use changes covered by its code181920. Septic systems below 3,500 gallons per day remain with Spokane Regional Health District5. A complete, clearly compliant new-house application may be issued within 2–3 days when septic is not involved; work involving a new or altered septic system needs at least 7–10 days for health-district review21. The published new-house schedule includes a $138.29 processing fee, an $89.70 plan-review fee, and a $0.23-per-square-foot inspection fee with a $936.88 minimum22. Most land-use applications require a pre-application conference, whose published nonrefundable fee is $767.88; confirm all project-specific and other-agency charges with planning staff23.

Does Spokane County have zoning?

Spokane County's zoning text and maps govern unincorporated land; the mapped district determines allowed uses and development standards42425. Cheney, Medical Lake, and Millwood have their own city zoning, while septic systems below 3,500 gallons per day remain under Spokane Regional Health District2627285. Resource-zone minimum lot areas per dwelling are 40 acres in Large Tract Agricultural, 10 acres in Small Tract Agricultural, and 20 acres in Forest Lands29. Rural cluster lots are generally 2 acres, except Urban Reserve cluster lots at 10,000 square feet; qualifying internal cluster lots with Class A public water may be 1 acre30. Rural cluster building coverage is capped at 35% in Rural-5, Rural Traditional, and Rural Conservation, and 50% in Urban Reserve31. The mixed-use standards require a 20-foot shared-line setback for multifamily, commercial, or mixed-use buildings next to a single-family residential zone or existing single-family home; that is not a general rural-house setback32. Ask Building & Planning for the parcel's applicable table.

How do septic permits work in Spokane County?

Spokane Regional Health District issues permits for new and changed on-site sewage systems serving single-family homes, small businesses, and apartment buildings using less than 3,500 gallons per day; larger systems and industrial wastewater fall to state agencies3334. The Septic Systems line is 509.324.1560 ext. 1, and the office is at 1101 W. College Ave., Spokane, WA 9920135. SRHD inspects systems after installation and requires inspection and maintenance before renewing the operating permit36. Conventional gravity systems require inspection every three years, while other on-site systems and holding tanks require annual inspection37. Only 2.6% of county soils lack severe limits for a conventional drain field, so arrange the site evaluation before fixing the house location38. Each property must connect to county sewer and abandon its septic tank within one year of being notified that sewer service is available39. If sewer is available for a residential project, obtain a side-sewer permit from Spokane County Building & Planning; public-water and electrical connections are coordinated with the serving utilities40.

Can you live in an RV or tiny home on your land in Spokane County?

In unincorporated Spokane County, a recreational vehicle occupied continuously for more than 30 days must meet the requirements for a manufactured home or commercial coach, unless it is used for security at a construction site7. A manufactured or mobile home needs a building permit and must meet the minimum residential development standards of its zone41. We could not confirm a general temporary-camping allowance; ask Spokane County Building & Planning before treating a shorter RV stay as permitted. Ask Spokane County Building & Planning about the parcel's zoning district and any time limits before moving an RV onto the land. Washington recognizes tiny houses of up to 400 square feet when built to the state building code, but foundation, installation, and location still require local approval8. A code-regulated dwelling must provide at least 190 square feet of habitable space, including at least one room of 120 square feet or more9. In the LDR, LDR-P, MDR, and HDR zones, a principal home and an attached accessory dwelling unit must have at least 1,200 square feet of combined livable floor area42.

Building a home in Spokane County: the steps, in order

  1. Ask Spokane County Building & Planning for the parcel's zoning district, development standards, and subdivision status2543.
  2. Determine whether sewer is available; if it is, obtain a side-sewer permit from Spokane County Building & Planning, and ask the serving utility about public-water and electrical connections40.
  3. If septic is needed, contact Spokane Regional Health District before fixing the house location because only 2.6% of county soils lack severe conventional-drain-field limits4438.
  4. Have the Division of Engineering and Roads review driveway-approach work and determine which permits apply45.
  5. Submit the project-specific plans and supporting documents required for the residential building-permit application46.
  6. Build to the adopted construction codes and complete the required reviews; final approval is required before the permitted structure may be used or occupied1247.
  7. Keep the permit timeline in view: a building permit expires after three years unless the Director grants one extension of up to 180 days17.

What to check before you buy land in Spokane County

Start with the zoning map, district standards, and legal-lot status because Spokane County's allowed uses and minimum lot sizes vary by district and development type4849. Only 2.6% of county soils lack severe limitations for a conventional septic drain field, so do not assume an undeveloped parcel will support the least expensive system38. Any development on an unincorporated parcel containing FEMA-designated floodplain requires a Floodplain Development Permit; work below the ordinary high water line or placing more than 500 cubic yards of fill requires a Determination of Non-Significance before that permit50. Floodplain fill, grading, excavation, and crossings also face limits on increases in base-flood water levels, so permit approval depends on more than the proposed house location51. A driveway connecting to a county public road needs an approach permit, and installation must be inspected and accepted before dwelling occupancy52. A qualifying well for a home or group of homes may be exempt from a water-right permit up to 5,000 gallons per day, but even a permit-exempt well requires a notice of intent10.

Watch-outs

  • Dividing unincorporated Spokane County land involves separate plat or short-plat review and fees; a preliminary plat has a published base fee of $8,227.25 plus $22.77 per lot53.
  • Washington's tiny-house allowance is written for structures built to the state building code; a wheeled structure that doesn't meet that definition may instead be regulated as a recreational vehicle or park model, with different rules8.

Sources

  1. Residential Building Permits, quoted and re-checked
  2. County Code, quoted and re-checked
  3. New Systems or Changes to Existing Systems, quoted and re-checked
  4. County Code, quoted and re-checked
  5. Septic Systems, quoted and re-checked
  6. RCW 18.27.090: Exemptions, quoted and re-checked
  7. Spokane County Code § 3.12.010, Occupancy restrictions, quoted and re-checked
  8. Tiny Houses (Washington statewide rule), quoted and re-checked
  9. WAC 51-50-1208, Section 1208—Interior space dimensions, quoted and re-checked
  10. Exempt Wells, quoted and re-checked
  11. Frequently Asked Questions — construction codes, quoted and re-checked
  12. spokanecounty.gov, quoted and re-checked
  13. app.leg.wa.gov, quoted and re-checked
  14. RCW 18.27.090: Exemptions, quoted and re-checked
  15. 2026 Land Use Fee Schedule BP-4P, quoted and re-checked
  16. Spokane County Building & Planning Department (spokanecounty.gov)
  17. Spokane County Building & Planning - Frequently Asked Questions (spokanecounty.gov)
  18. Cheney: Building Department (Spokane County), quoted and re-checked
  19. Medical Lake: Building Department - City of Medical Lake (Spokane County), quoted and re-checked
  20. Millwood: Millwood Municipal Code § 17.44.040—Permit required for erection or alteration (Spokane County), quoted and re-checked
  21. Residential Building Permits, quoted and re-checked
  22. Building Department Fee Schedule, quoted and re-checked
  23. 2026 Land Use Fee Schedule BP-4P, quoted and re-checked
  24. Spokane County Zoning Code, quoted and re-checked
  25. Spokane County Zoning Code, quoted and re-checked
  26. Cheney: Laws & Regulations (Spokane County), quoted and re-checked
  27. Medical Lake: Planning & Zoning Department - City of Medical Lake (Spokane County), quoted and re-checked
  28. Millwood: Millwood Municipal Code Title 17, Appendix A—Definitions (Spokane County), quoted and re-checked
  29. Spokane County Zoning Code, 2025 Printing, quoted and re-checked
  30. Spokane County Zoning Code, 2025 Printing, quoted and re-checked
  31. Spokane County Zoning Code, 2025 Printing, quoted and re-checked
  32. Spokane County Zoning Code, quoted and re-checked
  33. Septic Systems, quoted and re-checked
  34. New Systems or Changes to Existing Systems, quoted and re-checked
  35. Spokane Regional Health District (SRHD) - On-Site Sewage (Septic) Systems (srhd.org)
  36. New Systems or Changes to Existing Systems, quoted and re-checked
  37. On-Site Septic Operations and Maintenance, quoted and re-checked
  38. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  39. spokanecounty.gov, quoted and re-checked
  40. Residential Building Permits, quoted and re-checked
  41. Spokane County Zoning Code, quoted and re-checked
  42. Spokane County Zoning Code, Accessory Dwelling Unit Standards, quoted and re-checked
  43. Residential Building Permits, quoted and re-checked
  44. New Systems or Changes to Existing Systems, quoted and re-checked
  45. Residential Building Permits, quoted and re-checked
  46. Residential Building Permit Application, quoted and re-checked
  47. Residential Building Permits, quoted and re-checked
  48. County Code, quoted and re-checked
  49. Spokane County Building & Planning FAQs, quoted and re-checked
  50. Floodplain Information, quoted and re-checked
  51. Floodplain Requirements, quoted and re-checked
  52. Driveways, quoted and re-checked
  53. 2026 Land Use Fee Schedule BP-4P, quoted and re-checked

Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Spokane County requires a building permit for a home.

RuleSpokane CountyLincoln CountyWhitman CountyAdams CountyStevens CountyPend Oreille CountyFerry County
Building permitRequiredRequiredRequiredRequiredRequiredRequiredRequired
County zoningYesYesYesYesYesYesYes
Septic permitsSpokane Regional Health DistrictCounty Public HealthCounty Public HealthCounty Health Dept.Northeast Tri County Health DistrictNETCHDNortheast Tri County Health District

County locator

Spokane County in Washington

64
County map
Spokane County highlighted among the Washington counties · colored by Index score

How Spokane County scores

Seclusion57100% ev.
Self-Sufficiency50100% ev.
Admin Boringness41100% ev.
Durability72100% ev.
Property Autonomy50100% ev.
Carry Cost73100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$429kTypical home
0.9%Property tax
$4,951Land / acre
20.4"Annual rain
8.1% of yrsSevere drought
5.4 / yr (+4.9)Mid-century 100°F days
29.4 daysMid-century dry spell
0.8" (+5.8%)Mid-century 1-day rain
1.29×Wildfire change factor
100%Forward climate coverage
$1,230Home insurance / yr
2.2% / yrInsurance growth
0.61%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
7,673People within 30 min
1,000,478People within 2 hr
122,435Radius comparison (15 mi)
312.6People / sq mi
2.6%Federal land
75.1%Land at 15% slope or less
2.6%Soils rated "not limited" for septic (strict USDA rating)
26,849 acWorkable land screen
33.9%Wooded land
36.4 tonsBiomass / forest ac
47.1°FAvg temp

Scout Spokane County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Spokane County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Spokane County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Not yet researched: Airway Heights · Deer Park · Town of Fairfield · Town of Latah · Town of Rockford · Spangle · Spokane · Town of Waverly

Answers from the rulebook for Spokane County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Spokane County rules

  • Building permitRequired

    Residential construction in unincorporated Spokane County.

    • A single-story residential accessory building under 200 square feet is exempt from building permit requirements.
    • Permits must be obtained before construction.

    accessory building exemption threshold: < 200 square feet (Single-story residential accessory buildings such as tool and storage sheds.)

    “In general you will need a building permit any time you construct a new structure or enlarge, remodel, relocate or demolish an existing structure. Residential accessory buildings such as tool and storage sheds which are a single story and less than 200 square feet in area are exempt from permit requirements. Permits are required to be obtained prior to construction.”
  • Building code adoptedAdopted (with conditions)

    Construction codes in unincorporated Spokane County.

    • The listed codes may be modified by the State Building Code Council and Spokane County Code, Chapter 3.

    building code edition: 2021 International Building Code · residential code edition: 2021 International Residential Code

    “What construction codes are in effect in the unincorporated areas of the County? 2021 International Building Code 2021 International Residential Code”
    One more reviewed finding on this topic
    • Adopted (with conditions) — Construction codes identified by Spokane County for unincorporated areas.
      “- 2021 International Building Code - 2021 International Residential Code - 2021 International Mechanical Code - 2021 International Fuel Gas Code - 2021 International Pool and Spa Code - 2021 International Fire Code - 2021 Uniform Plumbing Code - 2021 International Existing Building Code - Washington State Energy Code”
  • Certificate of occupancyLimited

    Occupancy approval and certificate-related procedures for county-permitted structures.

    • The county material confirms final approval before use or occupancy and lists a temporary certificate of occupancy fee, but does not establish that a certificate of occupancy is required for every residential structure.

    temporary certificate of occupancy processing fee: 10% of original fee USD percentage · temporary certificate of occupancy inspection fee: 10% of original fee USD percentage

    “Final approval is required prior to use or occupancy of the permitted structure.”
  • County-wide zoningPresent (with conditions)

    County zoning regulation, principally for unincorporated Spokane County.

    • The county zoning code contains zone matrices and development standards; incorporated municipalities may administer their own zoning rules.
    “This code, adopted as an official control under chapter 36.70 RCW and chapter 36.70A RCW, shall consist of zoning text and a series of official zoning maps.”
    2 more reviewed findings on this topic
    • Present (with conditions) — Spokane County zoning regulation in the unincorporated county.
      “This code, adopted as an official control under chapter 36.70 RCW and chapter 36.70A RCW, shall consist of zoning text and a series of official zoning maps.”
    • Present (with conditions) — Spokane County zoning code for unincorporated areas.
      “The Zoning Code of Spokane County is maintained separately by the Division of Building and Planning.”
  • Zoning districtsPublished (with conditions)

    Published Spokane County zoning districts and zone-specific standards.

    • The zoning code is maintained by the Division of Building and Planning.
    • The cited code contains residential zone matrices and tables; applicability depends on the parcel's zone and development type.
    “The third section includes Zone Classifications and Overlay Zones (chapters 14.600 and 14.700). These chapters provide general regulations for permitted, not permitted, limited, and conditional uses in regular zones and overlay zones.”
    2 more reviewed findings on this topic
    • Published (with conditions) — Zoning districts and district-specific development standards in unincorporated Spokane County.
      “The location and boundaries of the zones established by this code are shown upon the zoning maps, which are hereby incorporated into the provisions of this Code.”
    • Published — Zoning districts and district-specific development standards in unincorporated Spokane County.
      “The third section includes Zone Classifications and Overlay Zones (chapters 14.600 and 14.700). These chapters provide general regulations for permitted, not permitted, limited, and conditional uses in regular zones and overlay zones. The standards include lot sizes, height of buildings, densities, frontage requirements, storage, lighting, and other related matters.”
  • Minimum dwelling sizeSpecified

    Attached accessory dwelling units in Spokane County residential zones.

    • The rule applies to attached accessory dwelling units in LDR, LDR-P, MDR, and HDR zones.
    • Only one attached accessory unit may be created within or attached to the principal unit.
    • The accessory unit must be a complete, separate housekeeping unit within or attached to the principal unit with common walls.
    • The principal and accessory units combined must meet the stated minimum livable floor area.

    minimum combined livable floor area of principal and attached accessory units: >= 1200 square feet

    “The total livable floor area of the principal and accessory units combined shall not be less than 1,200 square feet.”
  • Minimum lot sizeSpecified

    Residential development in the Large Tract Agricultural, Small Tract Agricultural, and Forest Lands zones under Spokane County Zoning Code Chapter 14.616.

    • Development must comply with the applicable zone's density and lot standards.
    • Minimum frontage is 330 feet per dwelling unit in each listed resource zone.
    • Minimum lot width is 330 feet in each listed resource zone.
    • The minimum frontage for lots accessed at the terminus of a public or private street equals the applicable right-of-way or easement width under adopted road standards, as amended.
    • Setbacks are measured from the property line.

    Large Tract Agricultural minimum lot area per dwelling unit: 40 acres · Small Tract Agricultural minimum lot area per dwelling unit: 10 acres · Forest Lands minimum lot area per dwelling unit: 20 acres · minimum frontage per dwelling unit: 330 feet (terminus-access lots use adopted right-of-way or easement width)

    “Table 616-3, Lot Standards for Resource Lands Large Tract Agricultural Small Tract Agricultural Forest Lands Maximum building coverage 20% of lot area 20% of lot area 20% of lot area Minimum lot area per dwelling unit 40 acres 10 acres 20 acres Minimum frontage per dwelling unit 330 feet1 330 feet1 330 feet1 Minimum lot width 330 feet 330 feet 330 feet”
    2 more reviewed findings on this topic
    • District specific (with conditions) — Residential cluster lots in Spokane County Rural Cluster Development zones.
      “A minimum lot area of 1 acre may be allowed for internal residential cluster lots provided the lots within the subdivision are served by a Class A public water supply.”
    • District specific (with conditions) — Lots and residential development in unincorporated Spokane County; the applicable minimum depends on the parcel’s zoning designation and development type.
      “Minimum lot sizes in Spokane County are dependent on the zoning of property and can range from 40 acres per dwelling unit to more than 15 dwelling units per acre depending upon the respective zoning designation.”
  • SetbacksDistrict specific (with conditions)

    Mixed-use development under Spokane County Zoning Code section 14.608.300.

    • Multiple-family, commercial, or mixed-use buildings adjacent to a single-family residential zone or existing single-family residence must meet the stated setback.
    • No other setbacks are required under this section except those mandated by adopted building codes.

    setback from shared property line: 20 feet (Adjacent multiple-family, commercial, or mixed-use building next to single-family residential zone or existing single-family residence.)

    “Any multiple family, commercial or mixed use building adjacent to a single family residential zone or an existing single family residence shall be set back from the shared property line by 20 feet. No other setbacks are required, except as mandated by the building codes adopted by Spokane County.”
  • Lot coverageSpecified

    Residential cluster lots in the Spokane County Rural Cluster Development standards.

    • Maximum coverage varies by zone.

    maximum building coverage: 35%, 35%, 50%, or 35% of lot area percent of lot area (Values correspond respectively to Rural-5, Rural Traditional, Urban Reserve, and Rural Conservation.)

    “Maximum building coverage 35% of lot area 35% of lot area 50% of lot area 35% of lot area”
  • Building heightDistrict specific (with conditions)

    Mixed-use development under Spokane County Zoning Code section 14.608.300.

    • Pitched roofs and accessible decks may extend above the height limit only if there is no enclosed, habitable space above the height limit.
    • Buildings within 60 feet of a Low Density Residential zone are limited to 35 feet above grade.
    • Beyond 60 feet, additional height is allowed at the stated ratio until the zone maximum is reached.

    maximum building height: 50 feet (May increase by 10 feet if structured parking is provided underneath the building or within the first floor.) · height near Low Density Residential zone: <= 35 feet (Within 60 feet of the zone.) · additional height ratio: 1 foot vertical per 3 feet horizontal (Beyond the 60-foot transition limit until the zone maximum is reached.)

    “The maximum building height is 50 feet. The maximum height may be increased by 10 feet, if structured parking is provided either underneath the building or within the first floor. Pitched roofs and accessible decks may extend above the height limit, provided that there is no enclosed, habitable space above the height limit.”
  • Living in an RVLimited

    Continuous occupancy of a recreational vehicle in unincorporated Spokane County.

    • A recreational vehicle occupied continuously for more than thirty days must meet the requirements for a manufactured home or commercial coach under Title 3.
    • The rule applies in the unincorporated areas of Spokane County.
    • The more-than-thirty-day requirement does not apply when the recreational vehicle is used for security purposes ancillary to a construction site.
    • Applicable provisions of Washington Administrative Code chapters 150C, 296-150F, or 296-150M also apply to manufactured homes, commercial coaches, or factory-built housing.

    continuous occupancy threshold: > 30 days (Security purposes ancillary to a construction site)

    “No manufactured home, commercial coach or factory built housing shall be placed, installed, stored or occupied in the unincorporated areas of the county unless done so in accordance with this chapter and applicable provisions of Chapter 150C, 296-150F or 296-150M of the Washington Administrative Code. A recreational vehicle occupied continuously for more than thirty days shall meet the requirements for a manufactured home or commercial coach, as applicable, under this title, unless the same is being used for security purposes ancillary to a construction site.”
  • Manufactured homesLimited

    Establishment of a manufactured or mobile home on an individual lot or in a manufactured-home park.

    • A building permit is required.
    • The manufactured home must conform to the minimum residential development standards of the applicable zoning district.
    “A building permit is required for the establishment of a manufactured home or a mobile home on an individual lot or in a manufactured home park in accordance with Title 3 of the Spokane County Code. An individual manufactured home shall conform to the minimum residential development standards of the zone in which it is located.”
  • Who permits septicLocal

    On-site sewage systems using less than 3,500 gallons per day in Spokane County's SRHD service area.

    • Washington State Department of Health and Department of Ecology enforce regulations for larger sewage systems and systems treating industrial wastewater.

    system capacity threshold: < 3500 gallons per day (Larger and industrial wastewater systems are enforced by state agencies.)

    “The Liquid Waste program permits and inspects on-site sewage systems using less than 3,500 gallons of water per day.”
    3 more reviewed findings on this topic
    • Local (with conditions) — On-site sewage systems using less than 3,500 gallons per day in Spokane County and the SRHD jurisdiction.
      “The Liquid Waste program permits and inspects on-site sewage systems using less than 3,500 gallons of water per day. Washington State Department of Health and Washington Department of Ecology enforce regulations for larger sewage systems and those systems that treat industrial wastewater.”
    • Local — On-site sewage systems in Spokane County within SRHD jurisdiction, for systems using less than 3,500 gallons per day.
      “The Liquid Waste program permits and inspects on-site sewage systems using less than 3,500 gallons of water per day. Washington State Department of Health and Washington Department of Ecology enforce regulations for larger sewage systems and those systems that treat industrial wastewater.”
    • Local — On-site sewage systems in Spokane County served by the Spokane Regional Health District.
      “Spokane Regional Health District (SRHD) tracks and issues permits for new on-site sewage systems and changes to existing systems designed for single-family homes, small businesses, and apartment buildings (systems less than 3,500 gallons per day).”
  • Septic permitRequired

    New on-site sewage systems and changes to existing systems within the SRHD service area in Spokane County.

    • The cited SRHD page covers single-family homes, small businesses, and apartment buildings with systems less than 3,500 gallons per day.
    • Fees vary based on system size and type.
    • Renewable permits are issued for one or three years depending on system type.
    “Spokane Regional Health District (SRHD) tracks and issues permits for new on-site sewage systems and changes to existing systems designed for single-family homes, small businesses, and apartment buildings (systems less than 3,500 gallons per day). Fees vary based on the size and type of system.”
    2 more reviewed findings on this topic
    • Required — New or changed on-site sewage systems for single-family homes, small businesses, and apartment buildings using less than 3,500 gallons per day.
      “Spokane Regional Health District (SRHD) tracks and issues permits for new on-site sewage systems and changes to existing systems designed for single-family homes, small businesses, and apartment buildings (systems less than 3,500 gallons per day). Fees vary based on the size and type of system.”
    • Required — New or modified on-site sewage systems for single-family homes, small businesses, and apartment buildings using less than 3,500 gallons per day.
      “issues permits for new on-site sewage systems and changes to existing systems”
  • Septic inspectionRequired

    On-site sewage system operation and maintenance inspections in Spokane County served by SRHD.

    • Conventional gravity systems must be inspected every three years.
    • All other on-site sewage systems must be inspected annually.
    • Holding-tank systems must be inspected annually and reports submitted under the holding-tank agreement.
    • Completed reports must be returned within 60 days, weather permitting.
    “Septic system inspections must be completed either annually or once every three years. Conventional gravity: every three years. All other on-site sewage systems: annually. Holding tank OSS must be inspected annually and reports submitted to SRHD per the holding tank agreement.”
    2 more reviewed findings on this topic
    • Required — On-site sewage systems under SRHD jurisdiction.
      “Systems are: Reviewed for compliance with regulations Permitted Inspected after installation Once installed, septic systems are issued renewable permits for one or three years, depending on the on-site septic system type. On-site sewage system inspection and maintenance is required prior to permit renewal.”
    • Required — On-site sewage systems in Spokane County under SRHD jurisdiction.
      “Septic system inspections must be completed either annually or once every three years.”
  • Mandatory utility hookupConditional

    Properties notified that Spokane County sewer service is available.

    • Each property must connect to sewer and abandon its septic tank within one year after notification of sewer availability.
    • A sewer connection permit is required.
    • The reviewed rule concerns sewer connection; it does not establish countywide water connection requirements.

    connection deadline: 1 year after notice

    “Each property is required by County Code to connect to the sewer and abandon their septic tank within one year of being notified of the availability of sewer service.”
    One more reviewed finding on this topic
    • Conditional — Residential development requiring sewer or public-water connections in unincorporated Spokane County.
      “If sewer is available to your site, a side sewer permit will need to be obtained from the Spokane County Department of Building and Planning. (477-3675)”
  • Subdividing landRegulated (with conditions)

    Subdivision and short-plat applications handled by Spokane County.

    • The 2026 fee schedule lists preliminary and final plats, short plats, and binding site plans.
    • Fees include base fees and per-lot increments.

    preliminary plat base fee: 8227.25 USD (Plus $22.77 per lot.) · final plat base fee: 3949.08 USD (Plus $29.70 per lot.)

    “Preliminary Plat .................... $8,227.25 $22.77/lot Final Plat ................................. $3,949.08 $29.70/lot Change of Conditions ........ $5,649.38 $22.77/lot Preliminary Short Plat ........ $5,155.74 $22.77/lot Final Short Plat ..................... $2,961.80 $29.70/lot”
    One more reviewed finding on this topic
    • Regulated (with conditions) — Residential building sites and land division in unincorporated Spokane County.
      “Building sites must conform to applicable regulations governing the division of land. Other local ordinances could impact your project depending upon its specific nature and location.”
  • Driveway accessRequired

    Private driveway approaches connecting to county public roads and access to residential dwellings.

    • An approach permit is required to connect to a county public road.
    • Driveway installation inspection and acceptance are required before dwelling occupancy.
    • Driveways over 150 feet require a turnaround within 150 feet of the dwelling.
    • Private driveway standards include grade, width, turnout, drainage, and curve requirements.

    maximum grade: 12%-14% (outside right-of-way) · minimum clear travel width: >= 12 feet (all-weather surface) · turnaround threshold: > 150 feet (turnaround required)

    “Approach permits are required from the Division of Engineering and Roads to connect to any county public road. Private driveways constructed prior to obtaining building permits may require a grading permit.”
    One more reviewed finding on this topic
    • Limited — Driveway approaches, curb cuts, and related work in unincorporated Spokane County.
      “Work in or around a flood plain, curbcuts, driveway approaches and the construction of curbs and sidewalks needs to be reviewed by the Spokane County Division of Engineering & Roads. Permits may be required.”
  • Building in a floodplainLimited

    Fill, grading, excavation, and crossing structures in Spokane County floodplain areas.

    • In A or shaded X zones, development may not increase the base-flood water-surface elevation by more than one foot.
    • In AE, AO, or AH zones with provided base-flood elevations, the limit is one-tenth of a foot, subject to stated subdivision and county-engineer/public-works-director exceptions.
    • Impacted property owners must provide written, notarized approval when the increase exceeds one-tenth of a foot.
    • Engineers must address floodway, bridge, and culvert requirements.

    base-flood elevation increase in A or shaded X zones: <= 1 foot · base-flood elevation increase in AE, AO, or AH zones: <= 0.1 foot (Specified subdivision and county-discretion exceptions.)

    “In any AE, AO or AH zones, where base flood elevations have been provided, the development may not increase the surface water elevation of the base flood by more than one-tenth of a foot at any point with the following exceptions:”
    2 more reviewed findings on this topic
    • Required — Development on parcels containing FEMA-designated floodplain in unincorporated Spokane County.
      “The Division of Engineering and Roads administers this code for the unincorporated areas of Spokane County. Spokane County’s Flood Damage Protection Code regulates any development that will occur on property all or a portion of which is determined by FEMA to be in a floodplain.”
    • Required — Development on parcels containing FEMA-designated floodplain in unincorporated Spokane County.
      “Any development on a parcel which contains floodplain will require a Floodplain Development Permit.”
  • Permit feesPublished (with conditions)

    Spokane County land-use and building permit applications.

    • Pre-application fees are non-refundable.
    • Other agency fees may apply.
    • Fees are due when an application is deemed complete and accepted.
    • An 80% refund may apply before county evaluation begins; a 50% refund may apply before legal notice or approval action; no refund generally applies after an administrative decision or notice mailing.
    • Specific fees should be verified with planning staff.

    preapplication fee: 767.88 USD

    “A pre-application conference is required for most land use applications to outline the evaluation and approval process and to identify potential issues or concerns before submitting a formal application. Pre-application fees are non-refundable.”
    One more reviewed finding on this topic
    • Published — Spokane County Building Department residential and commercial building permits.
      “New single family residence Processing fee: $138.29 Plan Review fee: $ 89.70”
  • Permit processPublished

    Residential building-permit application and review process in unincorporated Spokane County.

    • A complete new-house application without septic involvement may be issued within 2–3 days; septic-related new construction requires a minimum 7–10 days for SRHD review.
    • Other agencies may need to approve permits before release of the building permit.
    • Building permits expire after three years, with one discretionary extension up to 180 days if requested in writing before expiration and supported by just cause.

    permit validity: 3 years (One discretionary extension up to 180 days may be granted.)

    “For a new house, when a septic system is not involved, your application and plans are complete, and the proposal clearly conforms to the codes and ordinances adopted by Spokane County, the permit may be issued within 2–3 days. For additions, alterations and outbuildings a permit may often be issued the same day after review by county staff. In the case of new construction involving installation of a septic system, or alterations to a septic system, a minimum time frame of 7 to 10 days is necessary to allow review of the sewage disposal system by the Spokane Regional Health District.”
    2 more reviewed findings on this topic
    • Published (with conditions) — County land-use and building permit applications.
      “The Planning Department oversees the evaluation and issuance of all land-use and building permit applications and the enforcement of site development regulations governing the use and occupancy of buildings.”
    • Published (with conditions) — Residential building permit application process in unincorporated Spokane County.
      “Use the table below to determine submittal requirements for your application based on the scope of work proposed. One (1) complete PDF version of plans, supplemental documents shall be submitted in PDF format and saved as individually-named PDF files separate from the drawing files.”

Washington rules that apply here

  • Owner-builder exemptionConditional

    An owner or other person performing construction-related contractor activities on the person's own property or personal residence under Washington contractor-registration law.

    • The exemption concerns registration provisions under chapter 18.27 RCW and does not itself eliminate applicable building, electrical, plumbing, mechanical, land-use, or inspection requirements.
    • For work on the person's own property, the exemption does not apply when the person performs contractor activities for the purpose of selling, demolishing, or leasing the property.
    • For an owner contracting with a registered contractor, the exemption does not apply to a person performing contractor activities to lease or sell improved property owned for less than twelve months.

    small-project contract threshold: < 500 USD (The threshold exemption does not apply when the work is part of a larger operation, contracts are divided to evade the chapter, or the person advertises as a contractor.)

    “The registration provisions of this chapter do not apply to: [...] (12) Any person working on his or her own property, whether occupied by him or her or not, and any person working on his or her personal residence, whether owned by him or her or not but this exemption shall not apply to any person who performs the activities of a contractor on his or her own property for the purpose of selling, demolishing, or leasing the property;”
    3 more reviewed findings on this topic
    • Conditional — Washington contractor-registration exemption for a person working on their own property or personal residence.
      “The registration provisions of this chapter do not apply to: [...] (12) Any person working on his or her own property, whether occupied by him or her or not, and any person working on his or her personal residence, whether owned by him or her or not but this exemption shall not apply to any person who performs the activities of a contractor on his or her own property for the purpose of selling, demolishing, or leasing the property;”
    • Conditional — Washington contractor-registration exemption for a person working on their own property or personal residence.
      “Any person working on his or her own property, whether occupied by him or her or not, and any person working on his or her personal residence, whether owned by him or her or not but this exemption shall not apply to any person who performs the activities of a contractor on his or her own property for the purpose of selling, demolishing, or leasing the property;”
    • Conditional — Washington contractor-registration exemption applicable to owner work in Spokane County.
      “Any person working on his or her own property, whether occupied by him or her or not”
  • InspectionsRequired

    Construction or work in Washington for which a permit is required under the applicable state energy-code provisions, including residential construction covered by WAC 51-11R-10500.

    • The requirement is for inspection under the applicable state energy code; the inspection is performed by the code official, designated agent, or approved agency.
    • The work must remain visible and accessible until approved.
    • The permit holder or authorized agent must notify the code official when work is ready and provide access and means for required inspections.
    • If work or an installation fails an initial inspection or test, corrections must be made and the work resubmitted.
    • The state building code is in effect in all counties and cities, subject to chapter 19.27 RCW exceptions and authorized local amendments.

    final inspection: required (The building may not be occupied until approved.)

    “The building shall have a final inspection and not be occupied until approved.”
  • Tiny homesAllowed (with conditions)

    Occupancy and placement of tiny houses in Washington

    • A tiny house may be built on wheels and may not exceed 400 square feet including kitchen, bathroom, and sleeping/living area.
    • It must be built to the Washington State Building Code.
    • Approval depends on where it is built; local building-department requirements and permits apply to foundation, installation, and location.
    • A wheeled structure that is not a tiny house as described may instead be a recreational vehicle or park model.
    • A manufactured home, including a tiny manufactured home, requires consultation with the local building department regarding where it may be located.

    maximum area: <= 400 square feet

    “A tiny house is a dwelling that may be built on wheels and is no larger than 400 square feet, including a kitchen, bathroom, and sleeping/living area, and must be built to the Washington State Building Code. The approval process for a tiny house depends on where it's built.”
  • Accessory dwellingsAllowed (with conditions)

    Accessory dwelling units in portions of Washington cities, towns, and counties located within designated urban growth areas and subject to the Growth Management Act requirements

    • Cities and counties planning under the chapter must adopt or amend ordinances and development, zoning, and other official controls to implement the statutory requirements.
    • The requirements apply only in portions of towns, cities, and counties within designated urban growth areas.
    • Local governments may still apply public-health, safety, building-code, environmental-permitting, on-site-wastewater, and generally applicable development regulations.
    • Local governments may restrict or prohibit ADUs where development is restricted because of on-site sewage infrastructure, critical areas, or other unsuitable physical characteristics.
    • Under RCW 36.70A.681, at least two ADUs must be allowed on qualifying lots in configurations specified by statute, subject to listed exceptions and limitations.
    • The statutory requirements do not apply to lots designated with critical areas or buffers, or to specified impaired or threatened potable-water-reservoir watersheds.

    minimum ADUs in qualifying configurations: >= 2 accessory dwelling units per qualifying lot (Applies to lots in all zoning districts within an urban growth area that allow single-family homes, subject to statutory exceptions.)

    “The city or county must allow at least two accessory dwelling units on all lots that are located in all zoning districts within an urban growth area that allow for single-family homes in the following configurations:”
  • Well permitLimited

    Groundwater wells and groundwater uses statewide under Washington's water-right permit exemption.

    • Domestic use is exempt up to 5,000 gallons per day.
    • Industrial use is exempt up to 5,000 gallons per day.
    • Lawn or garden irrigation is exempt only for a half-acre or less.
    • Stockwater is exempt.
    • Only one permit-exempt use of each type is allowed for any one project, regardless of project size.
    • Withdrawals from multiple wells for one project are aggregated toward the exemption limits.
    • Local governments and other laws and rules may impose additional requirements and limits.
    • Use in excess of the listed amounts, use for other purposes, or use from a surface-water source requires applying for and receiving a water-right permit.
    • Before drilling, a notice of intent must be submitted to Ecology 72 hours before drilling starts; the NOI is not itself a permit or approval to use water.
    • Permit-exempt uses remain subject to state water law, including possible restrictions relating to senior water rights and Streamflow Restoration Act requirements.

    domestic groundwater use exemption: <= 5000 gallons per day (Per project, with withdrawals from multiple wells aggregated.) · industrial groundwater use exemption: <= 5000 gallons per day (Per project, with withdrawals from multiple wells aggregated.) · lawn or garden irrigation exemption: <= 0.5 acre (For lawn or garden irrigation.) · well construction notice: 72 hours before drilling (Notice of intent is not a permit, certificate, or water-right application.)

    “The groundwater permit exemption allows for four small uses of groundwater without a water right permit: Domestic uses of up to 5,000 gallons per day Industrial uses of up to 5,000 gallons per day Irrigation of a lawn or garden, a half-acre or less in size Stockwater”
    One more reviewed finding on this topic
    • Limited — Private groundwater wells in Spokane County.
      “Providing water for a single home or groups of homes (limited to 5,000 gallons per day).”
  • Agricultural exemptionConditional

    Washington contractor-registration exemption for construction or operations incidental to farming, dairying, agriculture, viticulture, horticulture, stock, or poultry raising.

    • The exemption does not apply when the work is performed by a registered contractor.
    “The registration provisions of this chapter do not apply to: [...] (10) Any construction or operation incidental to the construction and repair of irrigation and drainage ditches of regularly constituted irrigation districts or reclamation districts; or to farming, dairying, agriculture, viticulture, horticulture, or stock or poultry raising; or to clearing or other work upon land in rural districts for fire prevention purposes; except when any of the above work is performed by a registered contractor;”
    One more reviewed finding on this topic
    • Available (with conditions) — Temporary growing structures used solely for production of horticultural plants in Washington.
      “The provisions of this chapter do not apply to temporary growing structures used solely for the production of horticultural plants including ornamental plants, flowers, vegetables, and fruits. A temporary growing structure is not considered a building or structure for purposes of this chapter.”
  • Campground & park staysLimited

    Recreational vehicles in the context of Washington's manufactured/mobile-home community statutes

    • The rule defines an RV as temporary and transient living quarters.
    • The RV is not occupied as a primary residence.
    • The RV is not immobilized or permanently affixed to a manufactured/mobile home lot.
    • This claim does not establish general statewide siting permission on private land; local land-use and building rules may apply.
    “(12) "Recreational vehicle" means a travel trailer, motor home, truck camper, or camping trailer that is primarily designed and used as temporary living quarters, is either self-propelled or mounted on or drawn by another vehicle, is transient, is not occupied as a primary residence, and is not immobilized or permanently affixed to a manufactured/mobile home lot.”
    One more reviewed finding on this topic
    • Limited — Camping and temporary occupancy in Washington State Parks facilities
      “The maximum length of stay shall be no more than 10 nights in one park within a 30-day period. Total nights stayed by the same camping party must not exceed 90 nights per calendar year in all state parks. These limitations shall not apply to those individuals who meet the qualifications of WAC 352-32-280 and 352-32-285.”
  • county zoning authorityGeneral

    Washington counties adopting zoning and related official controls for county jurisdiction, including unincorporated areas.

    • A county must create a planning agency as authorized in RCW 36.70.030 and RCW 36.70.040 before engaging in the chapter's planning program.
    • Zoning maps may be adopted only for areas covered by a comprehensive plan containing at least a land use element and a circulation element.
    • Zoning regulations may address land uses, building location and dimensions, yards and open spaces, population density, lot coverage, parking, and minimum gross floor area requirements for single-family detached dwellings.
    • The cited enabling provisions do not state a population threshold, named-county limitation, or special geographic limitation.
    “Any board, by ordinance, may establish classifications, within each of which, specific controls are identified, and which will regulate:”
    One more reviewed finding on this topic
    • General — Washington counties may plan and adopt zoning and other official controls for county land, including unincorporated areas, through their boards and planning agencies.
      “Such official controls may include, but are not limited to, ordinances establishing zoning, subdivision control, platting, and adoption of detailed maps.”
  • county building authorityGeneral

    Washington counties requiring and enforcing building permits and adopting amendments to the state building code for residential construction within county jurisdiction, including unincorporated areas.

    • The state building code must be enforced by counties and cities within their jurisdictional boundaries.
    • A county without a building department must contract with another county, city, or approved inspection agency for enforcement.
    • County amendments may not diminish the minimum performance standards and objectives of the state building code.
    • Residential-building amendments are subject to approval by the state building code council under RCW 19.27.074(1)(b), except as provided by statute.
    • The building-permit definition incorporates exemptions in International Building Code section 105.2 and International Residential Code section R105.2.
    • Counties may adopt permit exemptions for certain specified R-3 or M-1 construction or alteration with total fair market value not exceeding $1,500, but the exemption does not remove substantive code standards.

    permit-exemption fair-market-value ceiling: <= 1500 USD (Applies only to certain construction or alteration of group R, division 3, or group M, division 1 occupancies under RCW 19.27.060(7); substantive code standards still apply.)

    “The state building code required by this chapter shall be enforced by the counties and cities. Any county or city not having a building department shall contract with another county, city, or inspection agency approved by the county or city for enforcement of the state building code within its jurisdictional boundaries.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Camping on your land — Temporary camping on private land.
  • Off-grid sanitation — Off-grid sanitation arrangements in Spokane County.
  • Short-term rentals — Short-term rentals in unincorporated Spokane County.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Water rights & wells in Spokane County

Whether a new home can legally get its own water here — the sub-state groundwater regime, from Washington’s water agency.

Actively managed

This basin is under active state management — new water use is scrutinized, though a domestic well is usually still allowed.

Household wellExempt up to a limit

RCW 90.44.050 exempts up to 5,000 gpd for domestic use, but the 2018 Streamflow Restoration Act caps NEW permit-exempt domestic wells at 3,000 gpd/connection in some basins and 950 gpd (350 gpd indoor in drought) in others, and new post-2020 wells in the adjudicating Nooksack basin are limited to ~500 gpd indoor.

Limit: 5,000 gpd base (RCW 90.44.050); capped to 3,000 or 950 gpd/connection in streamflow-restoration basins; ~500 gpd indoor for new Nooksack wells

Washington Dept of Ecology — Groundwater permit exemption ↗
  • Streamflow Restoration 3,000-gpd basins (RCW 90.94.020)partial of county

    New permit-exempt domestic wells capped at a maximum annual-average 3,000 gpd per connection; larger/new water-right permits generally unavailable due to instream-flow rules.

    Washington Legislature — RCW 90.94.020 ↗

Hybrid state (appropriation + riparian). Groundwater rules change and basin boundaries follow the aquifer, not the county line — confirm current well and appropriation rules with the Washington state water agency before you buy or drill.Groundwater governance as of Jul 2026, cited to each administering agency.

Living off-grid in Spokane County, Washington

Is Spokane County a good place to live off-grid or homestead?

Spokane County scores 64/100 on the Bolthole Index, a strong county profile. Its strengths: manageable long-term carry cost and mixed durability signals. Watch-outs: more administrative friction around building and land use.

Do you need a building permit in Spokane County, Washington?

Spokane County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by Spokane Regional Health District. Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

Can you live in an RV or tiny home on your land in Spokane County?

Living in an RV on your own land in Spokane County is limited to specific cases: Continuous occupancy of a recreational vehicle in unincorporated Spokane County. A recreational vehicle occupied continuously for more than thirty days must meet the requirements for a manufactured home or commercial coach under Title 3. The rule applies in the unincorporated areas of Spokane County. A tiny home is allowed. Confirm with the county before relying on it.

How much does land cost in Spokane County, Washington?

Land in Spokane County runs about $4,951 per acre, based on the latest county data.

What is the water situation in Spokane County?

Spokane County gets about 20.4" of rain a year, with severe drought in roughly 8.1% of years. On water rights, Spokane County lies in the Streamflow Restoration 3,000-gpd basins (RCW 90.94.020) — New permit-exempt domestic wells capped at a maximum annual-average 3,000 gpd per connection; larger/new water-right permits generally unavailable due to instream-flow rules..

How remote is Spokane County?

A representative private-land location has about 7,673 people within a 30-minute drive and 1,000,478 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Spokane compares in Washington

Compare side-by-side →See all 39 Washington counties ranked →