Unincorporated Spokane County, Washington requires residential building permits, with an exemption for single-story tool or storage sheds under 200 square feet1. Spokane County Building & Planning administers county zoning outside incorporated cities2. Spokane Regional Health District issues septic permits for new or changed systems using less than 3,500 gallons per day3.
At a glance
- Building permit
- Required for residential construction; single-story tool or storage sheds under 200 square feet are exempt1
- Zoning
- Spokane County's zoning code applies in unincorporated areas; standards vary by district and use4
- Septic permits
- Spokane Regional Health District permits and inspects systems below 3,500 gallons per day53
- Owner-builder exemption
- Available from contractor registration for work on your own property, except work done to sell, demolish, or lease it; permits still apply6
- RV living
- An RV occupied continuously for more than 30 days must meet manufactured-home or commercial-coach requirements7
- Tiny home
- Allowed up to 400 square feet if built to the Washington State Building Code, with local approval depending on where it's placed8
- Minimum dwelling size
- 190 square feet of habitable space minimum, with at least one room of 120 square feet or more9
- Private well
- Some small-quantity uses are exempt from a water-right permit, but even an exempt well requires a notice of intent10
Who to call
Building permits
Spokane County Building & Planning Department
Building permits, plan review, zoning administration, and long-range planning for unincorporated Spokane County
1026 W Broadway Avenue, 1st Floor, Spokane, WA 99260
Also useful
Spokane County Building & Planning - Frequently Asked Questions
Published answers from Building & Planning on which codes apply, permit expiration, extensions, online service area, and design criteria such as snow load
Septic permits
Spokane Regional Health District (SRHD) - On-Site Sewage (Septic) Systems
On-site sewage (septic) system permits, design review, and inspections for Spokane County
1101 W. College Ave., Spokane, WA 99201
Contact details are copied from each office’s official page and were checked against it on October 12, 2026.
Off-grid gear
Going off-grid in Spokane County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Spokane County, Washington?
Unincorporated Spokane County requires a building permit before constructing a new residential structure or enlarging, remodeling, relocating, or demolishing an existing one1. A single-story residential tool or storage shed under 200 square feet is exempt1. Spokane County lists the 2021 International Building and Residential Codes, subject to state and county modifications, alongside the other adopted construction codes and Washington State Energy Code1112. Washington's state building code applies except where state law provides otherwise13. An owner working on their own property may qualify for a contractor-registration exemption, except for work done to sell, demolish, or lease the property; building and other permits still apply6. Washington's exemption for certain agricultural work likewise concerns contractor registration, not a general exemption from county building or land-use rules14.
Who is the Spokane County building department, and how do you reach them?
The Spokane County Building & Planning Department evaluates and issues land-use and building permit applications and enforces site-development regulations governing building use and occupancy15. The office is at 1026 W Broadway Avenue, 1st Floor, Spokane, WA 99260, and the phone line is 509-477-367516. The county accepts online building-permit applications for unincorporated Spokane County, Millwood, Rockford, and Spangle17. Cheney and Medical Lake issue city building permits; Millwood also requires written city permission for the building work and use changes covered by its code181920. Septic systems below 3,500 gallons per day remain with Spokane Regional Health District5. A complete, clearly compliant new-house application may be issued within 2–3 days when septic is not involved; work involving a new or altered septic system needs at least 7–10 days for health-district review21. The published new-house schedule includes a $138.29 processing fee, an $89.70 plan-review fee, and a $0.23-per-square-foot inspection fee with a $936.88 minimum22. Most land-use applications require a pre-application conference, whose published nonrefundable fee is $767.88; confirm all project-specific and other-agency charges with planning staff23.
Does Spokane County have zoning?
Spokane County's zoning text and maps govern unincorporated land; the mapped district determines allowed uses and development standards42425. Cheney, Medical Lake, and Millwood have their own city zoning, while septic systems below 3,500 gallons per day remain under Spokane Regional Health District2627285. Resource-zone minimum lot areas per dwelling are 40 acres in Large Tract Agricultural, 10 acres in Small Tract Agricultural, and 20 acres in Forest Lands29. Rural cluster lots are generally 2 acres, except Urban Reserve cluster lots at 10,000 square feet; qualifying internal cluster lots with Class A public water may be 1 acre30. Rural cluster building coverage is capped at 35% in Rural-5, Rural Traditional, and Rural Conservation, and 50% in Urban Reserve31. The mixed-use standards require a 20-foot shared-line setback for multifamily, commercial, or mixed-use buildings next to a single-family residential zone or existing single-family home; that is not a general rural-house setback32. Ask Building & Planning for the parcel's applicable table.
How do septic permits work in Spokane County?
Spokane Regional Health District issues permits for new and changed on-site sewage systems serving single-family homes, small businesses, and apartment buildings using less than 3,500 gallons per day; larger systems and industrial wastewater fall to state agencies3334. The Septic Systems line is 509.324.1560 ext. 1, and the office is at 1101 W. College Ave., Spokane, WA 9920135. SRHD inspects systems after installation and requires inspection and maintenance before renewing the operating permit36. Conventional gravity systems require inspection every three years, while other on-site systems and holding tanks require annual inspection37. Only 2.6% of county soils lack severe limits for a conventional drain field, so arrange the site evaluation before fixing the house location38. Each property must connect to county sewer and abandon its septic tank within one year of being notified that sewer service is available39. If sewer is available for a residential project, obtain a side-sewer permit from Spokane County Building & Planning; public-water and electrical connections are coordinated with the serving utilities40.
Can you live in an RV or tiny home on your land in Spokane County?
In unincorporated Spokane County, a recreational vehicle occupied continuously for more than 30 days must meet the requirements for a manufactured home or commercial coach, unless it is used for security at a construction site7. A manufactured or mobile home needs a building permit and must meet the minimum residential development standards of its zone41. We could not confirm a general temporary-camping allowance; ask Spokane County Building & Planning before treating a shorter RV stay as permitted. Ask Spokane County Building & Planning about the parcel's zoning district and any time limits before moving an RV onto the land. Washington recognizes tiny houses of up to 400 square feet when built to the state building code, but foundation, installation, and location still require local approval8. A code-regulated dwelling must provide at least 190 square feet of habitable space, including at least one room of 120 square feet or more9. In the LDR, LDR-P, MDR, and HDR zones, a principal home and an attached accessory dwelling unit must have at least 1,200 square feet of combined livable floor area42.
Building a home in Spokane County: the steps, in order
- Ask Spokane County Building & Planning for the parcel's zoning district, development standards, and subdivision status2543.
- Determine whether sewer is available; if it is, obtain a side-sewer permit from Spokane County Building & Planning, and ask the serving utility about public-water and electrical connections40.
- If septic is needed, contact Spokane Regional Health District before fixing the house location because only 2.6% of county soils lack severe conventional-drain-field limits4438.
- Have the Division of Engineering and Roads review driveway-approach work and determine which permits apply45.
- Submit the project-specific plans and supporting documents required for the residential building-permit application46.
- Build to the adopted construction codes and complete the required reviews; final approval is required before the permitted structure may be used or occupied1247.
- Keep the permit timeline in view: a building permit expires after three years unless the Director grants one extension of up to 180 days17.
What to check before you buy land in Spokane County
Start with the zoning map, district standards, and legal-lot status because Spokane County's allowed uses and minimum lot sizes vary by district and development type4849. Only 2.6% of county soils lack severe limitations for a conventional septic drain field, so do not assume an undeveloped parcel will support the least expensive system38. Any development on an unincorporated parcel containing FEMA-designated floodplain requires a Floodplain Development Permit; work below the ordinary high water line or placing more than 500 cubic yards of fill requires a Determination of Non-Significance before that permit50. Floodplain fill, grading, excavation, and crossings also face limits on increases in base-flood water levels, so permit approval depends on more than the proposed house location51. A driveway connecting to a county public road needs an approach permit, and installation must be inspected and accepted before dwelling occupancy52. A qualifying well for a home or group of homes may be exempt from a water-right permit up to 5,000 gallons per day, but even a permit-exempt well requires a notice of intent10.
Watch-outs
- Dividing unincorporated Spokane County land involves separate plat or short-plat review and fees; a preliminary plat has a published base fee of $8,227.25 plus $22.77 per lot53.
- Washington's tiny-house allowance is written for structures built to the state building code; a wheeled structure that doesn't meet that definition may instead be regulated as a recreational vehicle or park model, with different rules8.
Sources
- Residential Building Permits, quoted and re-checked
- County Code, quoted and re-checked
- New Systems or Changes to Existing Systems, quoted and re-checked
- County Code, quoted and re-checked
- Septic Systems, quoted and re-checked
- RCW 18.27.090: Exemptions, quoted and re-checked
- Spokane County Code § 3.12.010, Occupancy restrictions, quoted and re-checked
- Tiny Houses (Washington statewide rule), quoted and re-checked
- WAC 51-50-1208, Section 1208—Interior space dimensions, quoted and re-checked
- Exempt Wells, quoted and re-checked
- Frequently Asked Questions — construction codes, quoted and re-checked
- spokanecounty.gov, quoted and re-checked
- app.leg.wa.gov, quoted and re-checked
- RCW 18.27.090: Exemptions, quoted and re-checked
- 2026 Land Use Fee Schedule BP-4P, quoted and re-checked
- Spokane County Building & Planning Department (spokanecounty.gov)
- Spokane County Building & Planning - Frequently Asked Questions (spokanecounty.gov)
- Cheney: Building Department (Spokane County), quoted and re-checked
- Medical Lake: Building Department - City of Medical Lake (Spokane County), quoted and re-checked
- Millwood: Millwood Municipal Code § 17.44.040—Permit required for erection or alteration (Spokane County), quoted and re-checked
- Residential Building Permits, quoted and re-checked
- Building Department Fee Schedule, quoted and re-checked
- 2026 Land Use Fee Schedule BP-4P, quoted and re-checked
- Spokane County Zoning Code, quoted and re-checked
- Spokane County Zoning Code, quoted and re-checked
- Cheney: Laws & Regulations (Spokane County), quoted and re-checked
- Medical Lake: Planning & Zoning Department - City of Medical Lake (Spokane County), quoted and re-checked
- Millwood: Millwood Municipal Code Title 17, Appendix A—Definitions (Spokane County), quoted and re-checked
- Spokane County Zoning Code, 2025 Printing, quoted and re-checked
- Spokane County Zoning Code, 2025 Printing, quoted and re-checked
- Spokane County Zoning Code, 2025 Printing, quoted and re-checked
- Spokane County Zoning Code, quoted and re-checked
- Septic Systems, quoted and re-checked
- New Systems or Changes to Existing Systems, quoted and re-checked
- Spokane Regional Health District (SRHD) - On-Site Sewage (Septic) Systems (srhd.org)
- New Systems or Changes to Existing Systems, quoted and re-checked
- On-Site Septic Operations and Maintenance, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- spokanecounty.gov, quoted and re-checked
- Residential Building Permits, quoted and re-checked
- Spokane County Zoning Code, quoted and re-checked
- Spokane County Zoning Code, Accessory Dwelling Unit Standards, quoted and re-checked
- Residential Building Permits, quoted and re-checked
- New Systems or Changes to Existing Systems, quoted and re-checked
- Residential Building Permits, quoted and re-checked
- Residential Building Permit Application, quoted and re-checked
- Residential Building Permits, quoted and re-checked
- County Code, quoted and re-checked
- Spokane County Building & Planning FAQs, quoted and re-checked
- Floodplain Information, quoted and re-checked
- Floodplain Requirements, quoted and re-checked
- Driveways, quoted and re-checked
- 2026 Land Use Fee Schedule BP-4P, quoted and re-checked
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.