Columbia County, Wisconsin
Town of Pacific is a town in Columbia County, Wisconsin. 6 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Columbia County page.
Construction, erection, alteration, enlargement, repair, moving, conversion, or demolition of a building, structure, or mechanical system inside Pacific town.
“Except as otherwise expressly provided in this chapter, no owner or contractor may construct, erect, alter, enlarge, repair, move, convert to other uses, or demolish any building, structure or mechanical system until a valid permit is obtained from the Town's Building Inspector.”
Buildings within the Town of Pacific subject to the adopted Wisconsin administrative codes.
“The following Wisconsin Administrative Codes, their referenced codes and standards, and subsequent revisions are adopted for municipal enforcement by the Town's Building Inspector:”
Mobile homes located, parked, used, owned, or occupied outside a licensed mobile home park inside Pacific town.
specified placement duration: <= 1 year (special permit outside a mobile home park)
“No person shall locate, park, use, own or occupy a mobile home outside a mobile home park in the Town without first obtaining a special permit from the Town Board. [...] The placement will be for a specified duration, not to exceed one year.”
Land divisions and subdivisions inside Pacific town limits.
“Chapter 440 Land Division and Subdivision”
Town building permits inside Pacific town limits.
“Building permit fees shall be determined by motion/resolution adopted by the Town Board and shall be set forth in the Town's Fee Schedule. If work commences prior to permit issuance, the permit fee shall be double.”
Town building-permit applications inside Pacific town limits.
“Application for a building permit shall be made in writing upon a form furnished by the Building Inspector and shall state the name and address of the owner of the land and also the owner of the building if different; the legal description of the land upon which the building is to be located; the name and address of the designer; the use to which such building is to be put; and such other information as the Building Inspector may require. [...] A building permit shall be on hold until the Plan Commission makes a recommendation to the Town Board.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Pacific or Columbia County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Pacific publishes no rule on the point, not that none exists. Columbia County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Pacific means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.