Fond du Lac County, Wisconsin
Village of Brandon is a village in Fond du Lac County, Wisconsin. Village of Brandon adopts its own zoning, so inside its limits Village of Brandon’s rules apply, not the county’s. 15 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Fond du Lac County page.
New, moved, erected, enlarged, altered, demolished, razed, or used buildings and structures inside Brandon village limits.
“No building of any kind shall be moved within or into the Village and no new building or structure, or any part thereof, shall hereafter be erected, or ground broken for the same, or enlarged, altered, moved, demolished, razed or used within the Village, except as herein provided, until a permit therefor shall first have been obtained pursuant to this chapter by the owner, or his/her authorized agent, from the Building Inspector or Village Clerk.”
Buildings inside Brandon village limits, including one- and two-family dwellings subject to the adopted Wisconsin code chapters.
“Chapters SPS 320 to SPS 325, Wis. Adm. Code, and subsequent revisions are adopted for municipal enforcement.”
Work and premises subject to Brandon's adopted Uniform Dwelling Code inside village limits.
“Inspection powers. An authorized inspection official of the Village may at all reasonable hours enter upon any public or private premises for inspection purposes and may require the production of the permit for any building, plumbing, electrical or heating work.”
Buildings inside Brandon village limits where the ordinance conditions a certificate of occupancy on utility availability.
“No person shall occupy any building until sewer, water, grading and graveling are installed in the streets necessary to service the property, and a certificate of occupancy shall not be issued until such utilities are available to service the property.”
Land inside Brandon village limits.
“For the purpose of this chapter, the Village of Brandon is hereby divided into the following 10 zoning districts:”
Land inside Brandon village limits.
number of zoning districts: 10
“For the purpose of this chapter, the Village of Brandon is hereby divided into the following 10 zoning districts:”
Manufactured homes in the R-1 Single-Family Residential District inside Brandon village limits.
minimum manufactured-home width: >= 24 feet · minimum manufactured-home length: >= 36 feet
“Manufactured homes complying with all of the following requirements and limitations. The home shall: Be a double wide of at least 24 feet in width and 36 feet in length.”
Privies, cesspools, and waterless toilets serving human habitation inside Brandon village limits after that building connects to a sewer main.
“After connection of any building used for human habitation to a sewer main, no privy, cesspool or waterless toilet shall be used in connection with such human habitation.”
Buildings used for human habitation inside Brandon village limits when a Village sewer or water main becomes available.
connection compliance period after notice: <= 10 days (Measured from service or mailing of the Building Inspector's notice.) · maximum connection deferment: <= 5 years (For properties with existing septic systems or wells whose construction was permitted by the Village.)
“Whenever a sewer or water main becomes available to any building used for human habitation, the owner of the property upon which the building is located shall connect the building to such main or mains in the manner prescribed by law, except the Village Board may defer connection to such water or sewer main or mains for those properties which have existing septic systems or wells whose construction was permitted by the Village of Brandon, but such deferment shall not exceed five years from the date of installation of such main or mains.”
Subdivision development supporting a proposed building inside Brandon village limits.
“No building permit shall be issued unless the property on which the building is proposed to be built abuts a street that has been dedicated for street purposes. No building permits shall be issued until the subdivision and required improvements are accepted by the Village Board.”
Buildable lots inside Brandon village limits.
minimum lot frontage: >= 60 feet (To be buildable, the lot must comply with its zoning district frontage requirements.)
“All lots shall abut upon a public street or other officially approved means of access, and each lot shall have a minimum frontage of 60 feet; however, to be buildable, the lot shall comply with the frontage requirements of the zoning district in which it is located.”
Building-permit applications inside Brandon village limits.
“Application for a building permit shall be made, in writing, upon a form furnished by the Village Clerk and shall state the name and address of the owner of the land and also the owner of the building if different, the legal description of the land upon which the building is to be located, the name and address of the designer, the use to which said building is to be put and such other information as the Building Inspector or Clerk may require.”
Village of Brandon does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Principal dwellings in Brandon's R-1 Single-Family Residential District.
minimum lot width: >= 90 feet · minimum lot area: >= 12000 square feet
“Lot size. Minimum width: 90 feet. Minimum area: 12,000 square feet.”
Principal dwellings in Brandon's R-1 Single-Family Residential District.
minimum street yard: >= 30 feet · minimum rear yard: >= 30 feet · minimum side yard: >= 15 feet (Six feet where lot is less than required 90 feet wide.) · minimum street-side yard: >= 15 feet
“Minimum street yard: 30 feet. Minimum rear yard: 30 feet. Minimum side yard: 15 feet (six feet where lot is less than required 90 feet wide). Minimum street side yard: 15 feet.”
Principal dwellings in Brandon's R-1 Single-Family Residential District.
maximum lot coverage: <= 30 percent (Total of all buildings on parcel.)
“Maximum lot coverage for total of all buildings on parcel: 30%.”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Brandon or Fond du Lac County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Brandon publishes no rule on the point, not that none exists. Fond du Lac County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Brandon means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
← All of Fond du Lac County: county rules, score and offices