Bolthole Index

Milwaukee County, Wisconsin

Zoning, building permits and septic rules in Village of Fox Point, Wisconsin

Village of Fox Point is a village in Milwaukee County, Wisconsin. 7 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Milwaukee County page.

Answers from the rulebook for Village of Fox Point

Village of Fox Point’s own rules

  • Certificate of occupancyRequired

    Premises and buildings inside the Village of Fox Point.

    • The certificate is issued by the Village Building Inspector and must state compliance with Wisconsin laws and Village health, building, and zoning ordinances.
    “No premises shall be occupied or used and no buildings now or hereafter erected or altered shall be occupied, used or changed until a certificate of occupancy shall have been issued by the Building Inspector of the Village of Fox Point stating that the building or proposed use of the building or premises complies with the provisions of the laws of the State of Wisconsin and the ordinances of the Village of Fox Point with respect to the health, building and zoning regulations.”
  • Zoning districtsPublished (with conditions)

    Land inside the Village of Fox Point.

    • Chapter 745 regulates construction and use by the district in which land is located.

    published residence districts: A-1, A-2, A-3, B, and C Residence Districts

    “§ 745-13 A-1 Residence District. § 745-14 A-2 Residence District. § 745-15 A-3 Residence District. § 745-16 B Residence District. § 745-17 C Residence District.”
  • Minimum lot sizeSpecified

    Dwellings in the A-3 Residence District inside the Village of Fox Point.

    • The required open area includes abutting land reserved for highway purposes to its center line.

    minimum open area per family: >= 20000 square feet (A-3 Residence District)

    “The open area of a lot on which a dwelling is erected or proposed to be erected, together with the area of abutting land reserved for highway purposes, whether private or public, to the center line thereof, shall not be reduced to less than 20,000 square feet for each family.”
  • Lot coverageSpecified

    Non-dwelling buildings in the A-3 Residence District inside the Village of Fox Point.

    • This parameter expressly applies to buildings not erected for a dwelling.

    maximum gross lot coverage: <= 10 percent (building not erected for a dwelling)

    “No building not erected for a dwelling shall occupy more than 10% of the gross area of the lot or exceed a height of 25 feet.”
  • Building heightSpecified

    Non-dwelling buildings in the A-3 Residence District inside the Village of Fox Point.

    • This parameter expressly applies to buildings not erected for a dwelling.

    maximum building height: <= 25 feet (building not erected for a dwelling)

    “No building not erected for a dwelling shall occupy more than 10% of the gross area of the lot or exceed a height of 25 feet.”
  • Subdividing landRegulated (with conditions)

    Land divisions inside the Village of Fox Point.

    • Village Board approval is required before the land division map is submitted for recording; the map is processed under § 738-4.
    “A land division map prepared pursuant to this chapter shall require the approval of the Village Board before it is submitted to be recorded and shall be processed according to the procedure set forth in § 738-4 of this chapter, except that there are no other approving or objecting authorities to whom copies need to be sent.”
  • Permit processPartial

    Land-division map approval inside the Village of Fox Point.

    • Village Board approval is required before recording; processing follows § 738-4.
    “A land division map prepared pursuant to this chapter shall require the approval of the Village Board before it is submitted to be recorded and shall be processed according to the procedure set forth in § 738-4 of this chapter, except that there are no other approving or objecting authorities to whom copies need to be sent.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of Fox Point or Milwaukee County directly.

  • Building permit — Residential construction inside the Village of Fox Point.
  • Owner-builder exemption — Owner-built residential construction inside the Village of Fox Point.
  • Building code adopted — Building construction inside the Village of Fox Point.
  • Inspections — Building work inside the Village of Fox Point.
  • Minimum dwelling size — A-3 Residence District inside the Village of Fox Point.
14 more unanswered
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of Fox Point publishes no rule on the point, not that none exists. Milwaukee County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Village of Fox Point means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Milwaukee County: county rules, score and offices