Milwaukee County, Wisconsin
Village of Greendale is a village in Milwaukee County, Wisconsin. Village of Greendale adopts its own zoning, so inside its limits Village of Greendale’s rules apply, not the county’s. 10 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Milwaukee County page.
Buildings and structures built, enlarged, altered, demolished, or moved into, within, or out of Greendale village.
“No building or structure or any part thereof shall hereafter be built, enlarged, altered or demolished within the Village or moved into, within or out of the Village except as hereinafter provided unless a permit therefor is first obtained by the owner or his agent from the Director of Inspection Services.”
Buildings and structures within Greendale village.
“The following chapters of the Wisconsin Administrative Code, as well as all subsequent revisions, are adopted by the municipality and shall be enforced by the Director of Inspection Services.”
Permitted construction of buildings, structures, or equipment inside Greendale village.
“Upon notification from the permit holder or his agent, required inspections of the construction of any buildings, structures or equipment shall be made as follows:”
Land inside Greendale village limits.
“[HISTORY: Adopted by the Village Board of the Village of Greendale as Ch. 17 of the Code of Ordinances. Amendments noted where applicable.]”
A one- or two-family dwelling inside Greendale village that requires a private sewage system.
“No building permit shall be issued for a one- or two-family dwelling requiring a private sewage system until such time that a sanitary permit has been issued.”
A building inside Greendale village after connection to a sewer main under § 13.15.
“After connection of any building to a sewer main hereunder, no privy or waterless toilet shall be used in connection with such building.”
Buildings used for human habitation and public, commercial, or business buildings inside Greendale village when public sewer and/or water becomes available.
compliance after written notice: <= 10 days (If the notified person fails to comply, the Plumbing Inspector may cause the connections to be made and assess the expense.)
“Whenever the public sewer and/or water becomes available to any public, commercial or business building or any building used for human habitation, the Plumbing Inspector shall notify in writing the owner, agent or occupant thereof to connect thereto all facilities required by the Plumbing Inspector.”
Subdivision of land inside Greendale village.
“No final plat for the subdivision of land as defined in § 236.02(12), Wis. Stats., in the Village shall be approved by the Village Board unless the subdivider shall by a separate agreement provide the following utility and street improvements and comply with the following provisions and requirements:”
Building permits issued by Greendale village.
“Before receiving a building permit, the owner or his agent shall pay the fee as set by the Village Board in the fee schedule on file at the office of the Village Clerk. The Village Board may amend the building permit fees from time to time through the passage of a resolution.”
Building-permit applications inside Greendale village.
complete plan sets: 3 sets · survey copies: 3 copies
“Application for a building permit shall be made in writing upon a form to be furnished by the Director of Inspection Services and shall state the name and address of the owner of the building and the owner of the land on which it is to be erected and the name and address of the designer and shall set forth a legal description of the land on which the building is to be located, the location of the building, the house number thereof and such other information as the Director of Inspection Services may require.”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Greendale or Milwaukee County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Greendale publishes no rule on the point, not that none exists. Milwaukee County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Greendale means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.