Zoning, building permits and septic rules in Village of Shiocton, Wisconsin
Village of Shiocton is a village in Outagamie County, Wisconsin. Village of Shiocton adopts its own zoning, so inside its limits Village of Shiocton’s rules apply, not the county’s. 6 rules below are quoted from official sources and independently re-checked, most recently on October 22, 2026. Rules for unincorporated land are on the Outagamie County page.
Answers from the rulebook for Village of Shiocton
Village of Shiocton’s own rules
Building permitRequired
Building work inside Shiocton village limits
Building permits are issued by the village building inspector (the village page names an MSA contact).
The village cannot approve construction in a floodway or on wetlands, and the applicant must first contact the DNR and document that the property is not in a floodway or wetlands before applying for a permit.
“building permits are issued by the building inspector”
Building code adoptedAdopted (with conditions)
Construction inside Shiocton village limits under the village's Title 15 building code
Title 15 lists chapters for the building code, construction site and storm water runoff management, historic preservation, minimum property maintenance code and commercial property exterior maintenance code (2003 codification).
The 2003 introduction also refers to a one- and two-family dwelling building code and states that building codes were amended as part of the recodification. The current adopted text and which state code (for example the Uniform Dwelling Code) it incorporates were not verified.
“title 15 building code chapter 1. chapter 2 chapter 3 chapter 4 chapter 5 building code construction site and storm water runoff management”
Local zoningPresent (with conditions)
Land inside Shiocton village limits: the village's own Title 13 zoning code (zoning code, floodplain zoning, shore land-wetland zoning)
The table of contents on the village's 2003 code introduction lists Title 13 Zoning. The ordinances page says the village ordinances were recodified and approved December 8, 2025, so the current chapter text may differ; the current zoning text was not opened.
Floodplain and shoreland-wetland zoning are also listed within Title 13.
Title 14 of the 2003 code is titled Subdivision Regulations; the current text and approval steps were not opened.
“title 14 subdivision regulations chapter 1. subdivision regulations title 15 building code”
Building in a floodplainLimited
Development inside Shiocton village limits within a floodway or wetland
The village cannot approve construction in a floodway or on wetlands; the DNR handles those areas.
Floodplain zoning appears in Title 13 of the village code, whose text was not opened.
“the village can not approve construction in a floodway or on wetlands”
Permit processPartial
Building permit applications inside Shiocton village limits
The page posts a building permit PDF and the building inspector contact, but the application steps and review timelines were not confirmed.
Floodway and wetland documentation from the DNR is required before applying.
“you are required to contact the dnr and provide documentation that your property is not in a floodway or wetlands before you apply for a permit”
Still unanswered
We looked and could not find an official answer yet. Silence is not permission; ask Village of Shiocton or Outagamie County directly.
Owner-builder exemption — Owner-builder work inside Shiocton village
Inspections — Building inspections inside Shiocton village
Certificate of occupancy — Occupancy of new construction inside Shiocton village
Zoning districts — Zoning districts inside Shiocton village limits
Minimum dwelling size — Single-family dwellings in the main residential district inside Shiocton village (district not yet identified)
19 more unanswered
Minimum lot size
Setbacks
Lot coverage
Building height
Living in an RV
Camping on your land
Tiny homes
Manufactured homes
Accessory dwellings
Who permits septic
Septic permit
Septic inspection
Off-grid sanitation
Well permit
Mandatory utility hookup
Agricultural exemption
Driveway access
Short-term rentals
Permit fees
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Shiocton publishes no rule on the point, not that none exists. Outagamie County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Shiocton means bringing your own water and power. The kit we’d start with: