Rock County, Wisconsin
Village of Orfordville is a village in Rock County, Wisconsin. 6 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Rock County page.
Buildings and structures moved, erected, enlarged, altered, demolished, razed, or used inside Orfordville village limits.
minor-repair value: < 250 USD (Only if the Inspector determines the work does not change occupancy area, exterior aesthetic appearance, structural strength, fire protection, exits, light, or ventilation.) · plan-waiver work cost: <= 2000 USD (For alterations, repairs, or moving when the work is sufficiently described in the application.)
“No building of any kind shall be moved within or into the Village and no new building or structure, or any part thereof, shall hereafter be erected, or ground broken for the same, or enlarged, altered, moved, demolished, razed or used within the Village, except as herein provided, until a permit therefor shall first have been obtained by the owner, or his authorized agent, from the Building Inspector.”
One- and two-family dwellings inside Orfordville village limits.
“The Administrative Code provisions describing and defining regulations with respect to one- and two-family dwellings in Chs. SPS 320 through SPS 325 and SPS 327, Wis. Adm. Code, are hereby adopted and by reference made a part of this chapter as if fully set forth herein.”
Buildings inspected under Village Code § 121-2 inside Orfordville village limits.
“If he finds that the work conforms to the provisions of this chapter, he shall issue an occupancy permit which shall contain the date and the result of such inspection, a duplicate of which shall be filed in the office of the Building Inspector.”
Zoning districts inside Orfordville village limits.
number of zoning districts: 9
“Nine zoning districts are provided in the Village of Orfordville”
New residential buildings inside Orfordville village limits.
“No building permit shall be issued for the construction of any residential building until sewer, water, grading and graveling are installed in the streets necessary to service the property for which the permit is required and a receipt for payment of electrical hookup is presented to the Building Inspector. [...] No person shall occupy any building until sewer, water, grading and graveling are installed in the streets necessary to service the property, and an occupancy permit shall not be issued until such utilities are available to service the property.”
Building-permit applications inside Orfordville village limits.
Village Board action period: <= 30 days (After receipt of site-plan application.)
“Application for a building permit shall be made in writing”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Orfordville or Rock County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Orfordville publishes no rule on the point, not that none exists. Rock County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Orfordville means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.