Waukesha County, Wisconsin
New Berlin is a city in Waukesha County, Wisconsin. New Berlin adopts its own zoning, so inside its limits New Berlin’s rules apply, not the county’s. 6 rules below are quoted from official sources and independently re-checked, most recently on October 22, 2026. Rules for unincorporated land are on the Waukesha County page.
New construction and alterations inside New Berlin city limits (the page lists a new home as requiring building, electrical and plumbing permits in a table).
“items requiring permits permits are required for many types of construction projects within the city of new berlin.”
Land inside New Berlin city limits. The city's permit page lists planning/zoning permits, which indicates the city administers zoning. The zoning ordinance text (Municipal Code Chapter 275, Zoning, per the city's code index) could not be opened, so this claim establishes no district rule.
“planning/zoning permits (fence, home occupation, retaining wall)”
Plats and certified survey maps for land inside New Berlin city limits (the city fee report lists plat and CSM approval fees)
preliminary plat approval fee: 100 USD per lot · final plat approval fee: 150 USD per lot · certified survey map fee: 100 USD per lot
“preliminary plat approval* $100/lot final plat approval* $150/lot certified survey maps* $100/lot”
Driveway approaches inside New Berlin city limits (engineering department permit)
“the following items require a permit in the city of new berlin: culverts (pdf) (new, replacement, and temporary) curb and ditch driveway approaches (pdf) (concrete and asphalt)”
Residential permit fees inside New Berlin city limits, per the city's 2025 fee report
plan examination fee, 1-2 family: 300 USD (plus new residential $0.44 sq. ft. (min. $160)) · new residential (1-2 family) fee: 0.44 USD per sq. ft. (minimum $160, plus $300.00) · residential alterations (1-2 family) fee: 0.44 USD per sq. ft. (minimum $160, plus $60.00) · residential additions fee: 0.46 USD per sq. ft. (minimum $160, plus $120.00) · erosion control permit fee: 175 USD per lot (plus $500 deposit)
“plan examination fee (1-2 family) $300.00 new residential $0.44 sq. ft. (min. $160) + $300.00”
Permit application process for building, electrical, plumbing and other permits inside New Berlin city limits
“you may apply for a permit on monday through friday, from 8:00 am to 4:00 pm”
We looked and could not find an official answer yet. Silence is not permission; ask New Berlin or Waukesha County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that New Berlin publishes no rule on the point, not that none exists. Waukesha County’s page lists the county offices to call.
Off-grid gear
Going off-grid in New Berlin means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.